Home / Browse projects / Pune, Maharashtra / ANSHUL MEDORA C BUILDING

Registered No litigation declared Residential / Group Housing project

ANSHUL MEDORA C BUILDING

By ANSHUL BHOSALE REALTY LLP

RG-MH-30997 · RERA P52100079331 · Last updated on MahaRERA portal: 10 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2030Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Podiums (if any), 50%
46 of 90Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

ANSHUL MEDORA C BUILDING is a Residential / Group Housing project by ANSHUL BHOSALE REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100079331 on 28 Feb 2025. Possession is promised by 30 Apr 2030. 44 of the 90 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameANSHUL MEDORA C BUILDING
  • TypeResidential / Group Housing
  • Location
    • Pune Ahmednagar Highway
    • Wagholi
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100079331
  • ReraGenie IDRG-MH-30997

Builder

  • NameANSHUL BHOSALE REALTY LLP
  • Entity typePartnership
  • Other registrations3 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredFeb 2025PromisedApr 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Feb 2025
  • Promised completion30 Apr 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

49%44 of 90 units booked
17.6%Work done, per cost certificate

Figures as on 10 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C BuildingNA151290090

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 50%.

C Building: 32% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed181

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots181
Closed/Covered1
Open Space180

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area684 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Dec 2025
LandownerVillageDistrict
Ramdas Bhiva HargudeWAGHOLIPune
Rajaram Bhiva HargudeWAGHOLIPune

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI14470.0
Proposed, not sanctioned7,700 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchB U BHANDARI PREMISES,1182 /13 FC ROAD,OPP HOTEL LALIT MAHAL,PUNE MAHARASHTRA 411005
Estimated costRs 40.17 cr
Cost incurredRs 7.08 cr
Work done17.61%
BuildingWingEstimatedIncurred
C BuildingNARs 37.17 crRs 6.94 cr
-NARs 3.00 crRs 13.07 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectG M Architects
EngineerVilas Kudale
Chartered AccountantNitesh M Shah & Co
PartnerRole in project
ANSHUL BHOSALE REALTY LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2030

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: AC_MedoraC_May26.pdf10 Jul 2026
Withdrawal Update Form 2File: EC_MedoraC_March26_page-0001.pdf10 Jul 2026
Withdrawal Update Form 3File: CA_MedoraC_March26.pdf10 Jul 2026
Withdrawal Update Form 1File: AC_MedoraC_Dec25.pdf8 Jul 2026
Withdrawal Update Form 2File: EC_MedoraC_Dec25_page-0001.pdf8 Jul 2026
Withdrawal Update Form 3File: CA_MedoraC_Dec25.pdf8 Jul 2026
Withdrawal Update Form 1File: AC_MedoraC_June25.pdf22 Jun 2026
Withdrawal Update Form 1File: AC_MedoraC_Sept25.pdf22 Jun 2026
Withdrawal Update Form 1File: AC_MedoraC_Sept25.pdf22 Jun 2026
Withdrawal Update Form 2File: EC_MedoraC_June25.pdf22 Jun 2026
Withdrawal Update Form 2File: EC_MedoraC_June25.pdf22 Jun 2026
Withdrawal Update Form 2File: EC_MedoraC_June25.pdf22 Jun 2026
Withdrawal Update Form 3File: CA_MedoraC_June25.pdf22 Jun 2026
Withdrawal Update Form 3File: CA_MedoraC_Sept25.pdf22 Jun 2026
Withdrawal Update Form 3File: CA_MedoraC_Sept25.pdf22 Jun 2026
Form 1File: AC_MedoraC_March25.pdf2 Dec 2025
Form 2File: EC_MedoraC_March25.pdf2 Dec 2025
Form 3File: CA_MedoraC_March25.pdf2 Dec 2025
Disclosure of Sold and Booked InventoryFile: Medora C Sold_Unsold Inventory_March-25.pdf2 Dec 2025
Withdrawal Update Form 1File: AC_MedoraC_March25.pdf2 Dec 2025
Withdrawal Update Form 2File: EC_MedoraC_March25.pdf2 Dec 2025
Withdrawal Update Form 3File: CA_MedoraC_March25.pdf2 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_MedoraC_March25.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_MedoraC_March25.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_MedoraC_March25.pdf3 May 2025
Building plan approvalFile: 8th and 12th floor plan_compressed.pdf18 Feb 2025
Proforma of Allotment letterFile: Proforma Allotment Letter.pdf18 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 8th and 12th floor plan_compressed.pdf18 Feb 2025
Proforma of Agreement for saleFile: Proforma Agreement of Sale.pdf18 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Declaration about RERA Designated bank Accounts.pdf14 Feb 2025
Layout approvalFile: B and C BLD HIGHLIGHTED LAYOUT.pdf21 Jan 2025
Layout approvalFile: SUB DIVISION LAYOUT.pdf21 Jan 2025
Building plan approvalFile: ABCDEF BLD GROUND PARKING LAYOUT.pdf21 Jan 2025
Building plan approvalFile: C BLD 1ST FLOOR PLAN.pdf21 Jan 2025
Building plan approvalFile: C BLD 1ST FLOOR PLAN.pdf21 Jan 2025
Building plan approvalFile: C BLD 1ST TO 7 and 9 TO 11 FLOOR PLAN.pdf21 Jan 2025
Building plan approvalFile: C BLD PLINTH HIGHLIGHTED PLAN.pdf21 Jan 2025
Building plan approvalFile: C BLD SECTION and ELEVATION PLAN.pdf21 Jan 2025
Building plan approvalFile: CLUB HOUSE PLAN MEDORA.pdf21 Jan 2025
Building plan approvalFile: PARKING LAYOUT.pdf21 Jan 2025
Copy of Layout Approval (in case of layout)File: B and C BLD HIGHLIGHTED LAYOUT.pdf21 Jan 2025
Copy of Layout Approval (in case of layout)File: SUB DIVISION LAYOUT.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_MedoraC_Dec24.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_MedoraC_Dec24.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_MedoraC_Dec24.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: CLUB HOUSE PLAN MEDORA.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PARKING LAYOUT.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: C BLD SECTION and ELEVATION PLAN.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: C BLD 1ST TO 7 and 9 TO 11 FLOOR PLAN.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: C BLD 1ST FLOOR PLAN.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: C BLD 1ST FLOOR PLAN.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: ABCDEF BLD GROUND PARKING LAYOUT.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: C BLD PLINTH HIGHLIGHTED PLAN.pdf21 Jan 2025
Other - TechnicalFile: Other technical Declaration.pdf21 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest DJ.pdf21 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest VB.pdf21 Jan 2025
PAN CardFile: ABR LLP- PAN.pdf3 Jan 2025
Copy of the legal title reportFile: Legal Title Report.pdf3 Jan 2025
Details of encumbrances concerned to FinanceFile: Declaration of Legal and Finance Encumbrance.pdf3 Jan 2025
Declaration in FORM BFile: Declaration in Form B Ramdas Hargude.pdf3 Jan 2025
Declaration in FORM BFile: Declaration in Form B Rajaram Hargude.pdf3 Jan 2025
Declaration in FORM BFile: Declaration in Form B VB.pdf3 Jan 2025
Declaration in FORM BFile: Declaration in Form B DJ.pdf3 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf3 Jan 2025
Other - LegalFile: DA - 11160 - 2011 Ramdas Hargude To Anshul Bhosale Realty 1H 22 R.PDF3 Jan 2025
Other - LegalFile: POA - 1161 - 2011 Ramdas Hargude 1H22R.PDF3 Jan 2025
Other - LegalFile: DA - 11162 - 2011 Rajaram Hargude to Anshul Bhosale Realty 1H27R.PDF3 Jan 2025
Other - LegalFile: POA - 1163 - 2011 Rajaram Hargude 1H27R.PDF3 Jan 2025
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf3 Jan 2025
CERSAI detailsFile: Declaration regarding Creation of Security Interest.pdf3 Jan 2025
Deviation Report with respect to Allotment letterFile: No Deviation in Allotment Letter.pdf3 Jan 2025
Details of encumbrances concerned to LegalFile: Declaration of Legal and Finance Encumbrance.pdf3 Jan 2025
Other - FinanceFile: ABR Supplemantary Partnership Deed 2022.pdf3 Jan 2025
Deviation Report with respect to model copy of AgreementFile: No Deviation Report in Agreement for Sale.pdf3 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Letter from Bank regarding opening of RERA Designated Bank Accounts.pdf3 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Declaration of Secured Unsecured Finance Availed for Project.pdf3 Jan 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Anshul Kanvas A and E BuildingGat No. 663 Wagholi haveli Pune 412207192CompletedApr 2019Late, May 2021

How this compares with Pune

49%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANSHUL MEDORA C BUILDING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi13,700+ in Pune

2 kmANSHUL MEDORA C BUILDINGCompleted 71Lapsed / revoked 33Other 40Dot size: filed unitsN

Filed coordinates, straight-line distance. 144 registered projects within 2 km.

Builder: ANSHUL BHOSALE REALTY LLP

ANSHUL BHOSALE REALTY LLP has 4 registrations on MahaRERA, including Anshul Kanvas B Building and KOSMAS A WING. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ANSHUL MEDORA C BUILDING is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANSHUL MEDORA C BUILDING?

The registered promoter entity is ANSHUL BHOSALE REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANSHUL MEDORA C BUILDING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANSHUL MEDORA C BUILDING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANSHUL MEDORA C BUILDING?

The professionals named in the filing: Architect: G M Architects; Engineer: Vilas Kudale; Chartered Accountant: Nitesh M Shah & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANSHUL MEDORA C BUILDING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANSHUL MEDORA C BUILDING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANSHUL MEDORA C BUILDING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.