Home / Browse projects / Mumbai Suburban, Maharashtra / Anant Siddhi

Registered No litigation declared Residential / Group Housing project

Anant Siddhi

By Shri Anantnathji Maharaj Jain Temple and Its Sadharan Funds

RG-MH-06651 · RERA P51800052583 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 85%
82 of 160Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

Anant Siddhi is a Residential / Group Housing project by Shri Anantnathji Maharaj Jain Temple and Its Sadharan Funds in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052583 on 11 Sep 2023. Possession is promised by 31 Mar 2028. 78 of the 160 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameAnant Siddhi
  • TypeResidential / Group Housing
  • Location
    • LBS Road
    • Bahndup
    • Bhandup
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • RERA no.P51800052583
  • ReraGenie IDRG-MH-06651

Builder

  • NameShri Anantnathji Maharaj Jain Temple and Its Sadharan Funds
  • Entity typeTrust

Key dates

this monthRegisteredSep 2023PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Sep 2023
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed109 files

Current status

49%78 of 160 units booked
57.7%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Anant SiddhiNA414113921160

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.

Anant Siddhi: 79% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes27%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes22%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes0%
Street LightingYes30%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes20%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed240

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots240
Closed/Covered240

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,307 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on30 Jun 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI12318.8
Proposed, not sanctioned12,319 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLaxmi Chhaya, Ramkrishna wadi, Bhandup west
Estimated costRs 97.50 cr
Cost incurredRs 56.22 cr
Work done57.66%
BuildingWingEstimatedIncurred
Anant SiddhiNARs 95.59 crRs 56.16 cr
-NARs 1.91 crRs 6.20 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPushya COnsultancy Services
ArchitectAakar Architects & Consultants
EngineerCHETTIAR CONSULTING ENGINEERS
EngineerSanjay Suresh Ranade
EngineerColliers International
Chartered AccountantR A Jilhewar & Co
Chartered AccountantGautam Mulchand Meisheri
PartnerRole in project
Shri Anantnathji Maharaj Jain Temple and Its Sadharan Funds-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Mar 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Final executed Doc.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 Final executed Doc.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 Final executed Doc.pdf24 Apr 2026
Commencement certificateFile: CC_05-02-2026.pdf21 Mar 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate - 30062024.pdf27 Jan 2026
Withdrawal Update Form 1File: Form 1 - 31-12-2025.pdf27 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate 30062024.pdf27 Jan 2026
Withdrawal Update Form 2File: Form 2 - 31-12-2025.pdf27 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate 30062024_compressed.pdf27 Jan 2026
Withdrawal Update Form 3File: Form 3 - 31-12-2025.pdf27 Jan 2026
Form 1File: Form 1.pdf13 Oct 2025
Form 2File: Form 2.pdf13 Oct 2025
Form 3File: Form 3.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventory Certificate.pdf13 Oct 2025
Form 1File: Form 1 - 30-06-2025.pdf20 Jul 2025
Form 2File: Form 2 - 30-06-2025.pdf20 Jul 2025
Form 3File: Form 3 - 30-06-2025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory 30-06-2025.pdf20 Jul 2025
Form 1File: FORM 1 - 09-04-25.pdf20 Jul 2025
Form 2File: FORM 2 - 09-04-25.pdf20 Jul 2025
Form 3File: FORM 3 - 09-04-25.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: INVENTORY CERTIFICATE - 09-04-25.pdf20 Jul 2025
Form 1File: RERA FORM 1 - 08-01-25.pdf20 Jul 2025
Form 2File: RERA FORM 2 - 08-01-25.pdf20 Jul 2025
Form 3File: RERA FORM 3 - 08-01-25.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: RERA INVENTORY - 08-01-25.pdf20 Jul 2025
Form 1File: FORM 1.pdf20 Jul 2025
Form 2File: FORM 2.pdf20 Jul 2025
Form 3File: FORM 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: BOOKED INVENTORY.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - 09-04-25.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - 09-04-25.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - 09-04-25.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: INVENTORY CERTIFICATE - 09-04-25.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 - 08-01-25.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 - 08-01-25.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 - 08-01-25.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: RERA INVENTORY - 08-01-25.pdf8 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Anant Siddhi.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: BOOKED INVENTORY.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: BOOKED INVENTORY.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 30062024.pdf1 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 30062024_compressed.pdf1 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - 30062024.pdf11 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory Certificate - 30062024.pdf11 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer certificate quality assurance_240626_103930.pdf26 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 2419374_FurtherCC_signed.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 31-03-24.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20231512_20240419_Engineer's Certificate_Scan.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Inventory certificate 31-03-24.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Anant Siddhi_compressed.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate.pdf8 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Booked inventory.PDF8 Jan 2024
Layout approvalFile: Segment 001 of 2 pages.pdf10 Oct 2023
Layout approvalFile: Segment 002 of 2 pages.pdf10 Oct 2023
Copy of Layout Approval (in case of layout)File: Segment 001 of 2 pages.pdf10 Oct 2023
Copy of Layout Approval (in case of layout)File: Segment 002 of 2 pages.pdf10 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate revised final_compressed.pdf10 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate compressed.pdf6 Sep 2023
Details of encumbrances concerned to FinanceFile: Finance Declaration.pdf5 Sep 2023
Details of encumbrances concerned to LegalFile: Finance Declaration.pdf5 Sep 2023
CERSAI detailsFile: Cersai declaration.pdf5 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.pdf5 Sep 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf3 Sep 2023
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf3 Sep 2023
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf3 Sep 2023
Building plan approvalFile: 3 Building Plan Approval _ NA Order for plotted development.pdf3 Sep 2023
Building plan approvalFile: 4 Building Plan Approval _ NA Order for plotted development.pdf3 Sep 2023
Building plan approvalFile: 5 Building Plan Approval _ NA Order for plotted development.pdf3 Sep 2023
Building plan approvalFile: 6 Building Plan Approval _ NA Order for plotted development.pdf3 Sep 2023
Building plan approvalFile: 7 Building Plan Approval _ NA Order for plotted development.pdf3 Sep 2023
Building plan approvalFile: 8 Building Plan Approval _ NA Order for plotted development.pdf3 Sep 2023

How this compares with Mumbai Suburban

49%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anant Siddhi on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bahndup6,700+ in Mumbai Suburban

Builder: Shri Anantnathji Maharaj Jain Temple and Its Sadharan Funds

Shri Anantnathji Maharaj Jain Temple and Its Sadharan Funds has 1 registration on MahaRERA, including Anant Siddhi. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Anant Siddhi is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anant Siddhi?

The registered promoter entity is Shri Anantnathji Maharaj Jain Temple and Its Sadharan Funds, a trust as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anant Siddhi?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anant Siddhi?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anant Siddhi?

The professionals named in the filing: Architect: Pushya COnsultancy Services; Architect: Aakar Architects & Consultants; Engineer: CHETTIAR CONSULTING ENGINEERS; Engineer: Sanjay Suresh Ranade; Engineer: Colliers International; Chartered Accountant: R A Jilhewar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anant Siddhi?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anant Siddhi. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anant Siddhi to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.