Home / Browse projects / Kolhapur, Maharashtra / ANANT PARV

Completed No litigation declared Others project

ANANT PARV

By SA ASSOCIATES

RG-MH-77442 · RERA P53000053873 · Last updated on MahaRERA portal: 10 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Podiums (if any), 0%
25 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

ANANT PARV is a Others project by SA ASSOCIATES in Kolhapur, Maharashtra, registered with MahaRERA as P53000053873 on 8 Dec 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. 7 of the 32 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameANANT PARV
  • TypeOthers
  • Location
    • E WARD KATKAR COLONY
    • NEAR CSIBER COLLEGE
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416008
  • Pincode416008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000053873
  • ReraGenie IDRG-MH-77442

Builder

  • NameSA ASSOCIATES
  • Entity typePartnership
  • GSTIN27AEWFS3444J1ZB
  • PartnerSAMEER KESHAVLAL SHAHA
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2023PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Dec 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Current status

22%7 of 32 units booked
100.0%Work done, per cost certificate

Figures as on 10 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANANT PARVNA66221032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

ANANT PARV: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered56

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area661 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 May 2026
LandownerVillageDistrict
SMT SUGANDHA PANDURANG BHOSALEKolhapur (M Corp.)Kolhapur
VIJAY PANDURANG BHOSALEKolhapur (M Corp.)Kolhapur
SAGAR PANDURANG BHOSALEKolhapur (M Corp.)Kolhapur

Approvals and building plan

Sanctioning authorityKolhapur Municipal Corporation
Permissible FSI1748.31
Proposed, not sanctioned1,748 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1874 GROUND FLOOR E WARD RAJARAMPURI 8TH LANE KOLHAPUR
Estimated costRs 5.43 cr
Cost incurredRs 5.43 cr
Work done100.0%
BuildingWingEstimatedIncurred
ANANT PARVNARs 4.94 crRs 4.94 cr
-NARs 49.00 lakhRs 49.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGAP ARCHITECTS
EngineerSANDEEP Y BORCHATE
EngineerSamir Shaha
Chartered AccountantSHANKAR PATIL AND ASSOCIATES
Chartered AccountantAmit Madanrao Shinde
PartnerRole in project
SA ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Completion Certificate.pdf10 Jun 2026
Occupational CertificateFile: Architect certificate form 4.pdf10 Jun 2026
Withdrawal Update Form 1File: Form_1_Architect_Certificate.pdf18 May 2026
Withdrawal Update Form 2File: Form_2_Engineers-certificate.pdf18 May 2026
Withdrawal Update Form 3File: Form_3_SA_Associates 31032026.pdf18 May 2026
Form 1File: architect certificate 2026.pdf16 Jan 2026
Form 2File: engineer certificate 2026.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: sold_unsold.pdf16 Jan 2026
Form 3File: Form_3-SA-Associates_31122025.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf20 Oct 2025
Form 1File: ARCHITECT CERTIFICATE (1).pdf20 Oct 2025
Form 2File: ENGINEER'S CERTIFICATE .pdf20 Oct 2025
Form 3File: CA certificate .pdf20 Oct 2025
OthersFile: ANANT PARVA PART OC.pdf20 Oct 2025
Form 2A (FY 2024-2025)File: Engineer's certificate for quality assurance (2).pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory 142025.pdf15 Jul 2025
Form 1File: Architect Certificate 142025.pdf15 Jul 2025
Form 2File: Engineer Certificate 142025.pdf15 Jul 2025
Form 3File: CA Certificate 15042025compressed.pdf15 Jul 2025
OthersFile: Engineer Certificate Of Quality Assurance 142025.pdf15 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate.pdf13 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf13 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf13 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf13 Jul 2025
Form 1File: Ar Certificate.pdf13 Jul 2025
Form 2File: Engineer Certificate.pdf13 Jul 2025
Form 3File: CA Certificate.pdf13 Jul 2025
Occupational CertificateFile: Part Completion.pdf13 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf20 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate Of Quality Assurance.pdf20 Apr 2025
Building plan approvalFile: PLAN.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arct Certificate.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 010125_compressed (1).pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate 010125.pdf20 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC_ANANT PARV.pdf20 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 010125.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SA.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SA Associates Form 5.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (18).pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE MARCH 2024.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf9 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold.pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf9 Jan 2024
Building plan approvalFile: Sanctioned Plan NEW Final - Highlighted.pdf27 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan NEW Final - Highlighted.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf27 Nov 2023
Building plan approvalFile: Sanctioned Plan NEW Final - Highlighted.pdf18 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan NEW Final - Highlighted.pdf18 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf18 Oct 2023
CERSAI detailsFile: CERSAI Undertaking SA associates.pdf18 Oct 2023
Layout approvalFile: Layout Plan.pdf13 Oct 2023
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf13 Oct 2023
Declaration about Commencement CertificateFile: Declaration about CC 10122023.pdf13 Oct 2023
Declaration in FORM BFile: Form B Declaration - Promoter 10132023.pdf13 Oct 2023
Proforma of Agreement for saleFile: Agreement to Sell as per RERA Act.pdf13 Oct 2023
Proforma of Allotment letterFile: Allottment Letter - New.pdf13 Oct 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation - Agreement to Sell10132023.pdf13 Oct 2023
Building plan approvalFile: Sanctioned Plan Old Final.pdf12 Oct 2023
PAN CardFile: PAN CARD.pdf12 Oct 2023
Copy of the legal title reportFile: Legal Title and Search Report10092023.pdf12 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Finance10092023.pdf12 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Legal10092023.pdf12 Oct 2023

How this compares with Kolhapur

22%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep ANANT PARV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR CSIBER COLLEGE880+ in Kolhapur

2 kmANANT PARVCompleted 34Lapsed / revoked 21Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 89 registered projects within 2 km.

Builder: SA ASSOCIATES

SA ASSOCIATES has 2 registrations on MahaRERA, including PATAN PRIDE and ANANT PARV. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if ANANT PARV is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANANT PARV?

The registered promoter entity is SA ASSOCIATES, a partnership as per the filing. Its GSTIN 27AEWFS3444J1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANANT PARV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANANT PARV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANANT PARV?

The professionals named in the filing: Architect: GAP ARCHITECTS; Engineer: SANDEEP Y BORCHATE; Engineer: Samir Shaha; Chartered Accountant: SHANKAR PATIL AND ASSOCIATES; Chartered Accountant: Amit Madanrao Shinde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANANT PARV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANT PARV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANT PARV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.