Home / Browse projects / Mumbai Suburban, Maharashtra / Anant Nakshatra Tower 2

Registered No litigation declared Residential / Group Housing project

Anant Nakshatra Tower 2

By M CONSTRUCTION COMPANY

RG-MH-69860 · RERA P51800049339 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Stilt Floor, 90%
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

Anant Nakshatra Tower 2 is a Residential / Group Housing project by M CONSTRUCTION COMPANY in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049339 on 7 Feb 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameAnant Nakshatra Tower 2
  • TypeResidential / Group Housing
  • Location
    • SANTAJI DHANAJI MARG
    • TANAJI NAGAR MALAD EAST
    • Kurar
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049339
  • ReraGenie IDRG-MH-69860

Builder

  • NameM CONSTRUCTION COMPANY
  • Entity typePartnership
  • PartnersCHANDRASEN ANANTRAO SAWANT, YOGESH ANANT SAWANT, Chhaya Anant Sawant
  • Other registrations1 more →

Key dates

this monthRegisteredFeb 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Feb 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Current status

62.2%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Anant Nakshatra Tower 2NA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

Anant Nakshatra Tower 2: 66% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes15%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered26

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,596 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI20690.35
Proposed, not sanctioned5,573 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPRANIK GARDEN MAHAVIR NAGAR KANDIVALI WEST MUMBAI 400067
Estimated costRs 32.19 cr
Cost incurredRs 20.03 cr
Work done62.23%
BuildingWingEstimatedIncurred
Anant Nakshatra Tower 2NARs 17.06 crRs 12.76 cr
-NARs 15.13 crRs 7.28 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShri Vinayak Bhat
ArchitectADNAN ZAHEEN TABASSUM SHAIKH
EngineerShri Shailendra U Talekar
Chartered AccountantShir Vinod Kumar Jain
Chartered AccountantShri Himank Desai
PartnerRole in project
M CONSTRUCTION COMPANY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Anant Nakshtara Tower 2- Jan 2026 to March 2026 Final.pdf20 Apr 2026
Form 2File: From -2 Anant Nakshatra Tower 2 Jan 26 to Mar 26 Final.pdf20 Apr 2026
Form 3File: From -3 Anant Nakshatra Tower 2 Jan 26 to Mar 26 Final.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory Till March 2026 Anant Nakshtara Tower 2.pdf20 Apr 2026
Self-declaration of Quarterly ProgressFile: SELF-DECLARATION QTY PROGRESS REPORT Jan 2026 to March 2026.pdf20 Apr 2026
Form 1File: Form 1 Anant Nakshtara Tower 2 - Oct 2025 to Dec 2025 Singed.pdf20 Jan 2026
Form 2File: Form 2 Anant Nakshtara Tower -2 Oct 2025 to Dec 2025.pdf20 Jan 2026
Form 3File: FROM 3 from Oct 2025 To Dec 2025 OF ANT-2 Final.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold Booked Inventory ANT -2 Dec 2025.pdf20 Jan 2026
Self-declaration of Quarterly ProgressFile: SELF-DECLARATION QTY PROGRESS REPORT DEC 2025 ANT-2.pdf20 Jan 2026
Withdrawal Update Form 1File: FROM 1 Anant Nakshatra Tower-2 July-2025 to Sept 2025.pdf18 Oct 2025
Withdrawal Update Form 1File: FROM 1 Anant Nakshatra Tower-2 July-2025 to Sept 2025.pdf18 Oct 2025
Withdrawal Update Form 2File: From-2 Anant Nakshatra Tower- 2 July 2025 to Sept 2025.pdf18 Oct 2025
Withdrawal Update Form 2File: From-2 Anant Nakshatra Tower- 2 July 2025 to Sept 2025.pdf18 Oct 2025
Withdrawal Update Form 3File: From-3 Anant Nakshatra Tower- 2 July 2025 to Sept 2025.pdf18 Oct 2025
Withdrawal Update Form 3File: From-3 Anant Nakshatra Tower- 2 July 2025 to Sept 2025.pdf18 Oct 2025
Form 1File: From 1 Anant Nakshatra Tower 2 Dec 2024.pdf11 Jun 2025
Form 2File: From 2 Anant Nakshatra Tower 2 Dec 2024.pdf11 Jun 2025
Form 3File: From 3 Anant Nakshtara Tower -2 Dec 2024.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: ANT -2 Disclouser of Sold Inventory Dec 2024.pdf11 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF-DECLARATION QTY PROGRESS REPORT DEC 2024.pdf11 Jun 2025
Form 1File: From 1 Anant Nakshatra Tower -2 March 2025.pdf11 Jun 2025
Form 2File: From 2 Anant Nakshatra Tower -2 March 2025.pdf11 Jun 2025
Form 3File: From 3 ANT-2 March 2025.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: ANT -2 Disclouser of Sold Inventory Mar 2025.pdf11 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF-DECLARATION QTY PROGRESS REPORT MARCH 2025 SIGN.pdf11 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AN Tower 2 Form 1 Sept 2024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ANANT NAKSHTRA TOWER 2 FROM-03.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: ANT -2 Disclouser of Sold Inventory Sept 2024.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Anant Nakshtara Tower 2 June 2024.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: ANT 2 Disclouser of Sold Inventory June 2024.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Anant Nakshatra Tower-2.pdf20 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Anant Nakshatra Tower 2 Further CC.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate of AN Tower 2 March 2024.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: ANT-2 Disclouser of Inventory 31-03-2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 31-03-2024 ANT -2.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: ANT 2 Sold Inventory 31122023.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ANANT NAKSHATRA 02 DEC 2023.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 Architech Certificate 300923.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: ANT 2 Disclouser of Sold Unsold Inventory 30092023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Anant Nakshtara Tower 2 30092023.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From-1 Architect Certificate.pdf25 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 Engineer Certificate.pdf25 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory June 2023.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Anant Nakshtara Tower 2.pdf3 Aug 2023
Proforma of Agreement for saleFile: Model Agreement For Sell 030223.pdf30 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report 30012023.pdf30 Jan 2023
Building plan approvalFile: Plan Page No 3.pdf20 Jan 2023
Building plan approvalFile: Plan Page No 4.pdf20 Jan 2023
Building plan approvalFile: Plan Page No 5.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan Page No 3.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan Page No 4.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan Page No 5.pdf20 Jan 2023
Layout approvalFile: Layout letter with CC Report.pdf18 Jan 2023
Building plan approvalFile: Building Layout Plan.pdf18 Jan 2023
Building plan approvalFile: Plan Page No 2.pdf18 Jan 2023
Copy of Layout Approval (in case of layout)File: Layout letter with CC Report.pdf18 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Layout Plan.pdf18 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan Page No 2.pdf18 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of Interest Annexure A.pdf3 Jan 2023
Declaration in FORM BFile: 9 Form-B.pdf2 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 New Format as on 31102022.pdf21 Dec 2022
Copy of the legal title reportFile: 2 Legal Title Report Format A.pdf15 Dec 2022
Proforma of Allotment letterFile: 15 Proforma of Allotment Letter with Annx A Anant Tower 2.pdf15 Dec 2022
Deviation Report with respect to Allotment letterFile: 36 Deviations reports of Allotment Letter.pdf15 Dec 2022
PAN CardFile: 1 MCC PAN CARD PDF FILE.pdf9 Dec 2022
Details of encumbrances concerned to FinanceFile: 4 No Encumcrabce Certificate.pdf9 Dec 2022
Details of encumbrances concerned to LegalFile: 4 No Encumcrabce Certificate.pdf9 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: 7 Commencement Certificate Tower 2.pdf9 Dec 2022
Declaration about Commencement CertificateFile: 8 Declaration About CC Format D.pdf9 Dec 2022
CERSAI detailsFile: 18 CERSAI_Asset Based Search Report.pdf9 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 34 declaration about bank account Format A.pdf9 Dec 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anant Nakshatra Tower 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TANAJI NAGAR MALAD EAST6,700+ in Mumbai Suburban

2 kmAnant Nakshatra Tower 2Completed 69Lapsed / revoked 58Other 108Dot size: filed unitsN

Filed coordinates, straight-line distance. 235 registered projects within 2 km.

Builder: M CONSTRUCTION COMPANY

M CONSTRUCTION COMPANY has 2 registrations on MahaRERA, including Anant Nakshatra Tower 2 and Anant Nakshatra Tower 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Anant Nakshatra Tower 2 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anant Nakshatra Tower 2?

The registered promoter entity is M CONSTRUCTION COMPANY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anant Nakshatra Tower 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anant Nakshatra Tower 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anant Nakshatra Tower 2?

The professionals named in the filing: Architect: Shri Vinayak Bhat; Architect: ADNAN ZAHEEN TABASSUM SHAIKH; Engineer: Shri Shailendra U Talekar; Chartered Accountant: Shir Vinod Kumar Jain; Chartered Accountant: Shri Himank Desai. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anant Nakshatra Tower 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anant Nakshatra Tower 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anant Nakshatra Tower 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.