ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / ANANT AND RADHIKA HEIGHTS

Registered No litigation declared Others project

ANANT AND RADHIKA HEIGHTS

By ASHAPURA CONSTRUCTION CO

RG-MH-31645 · RERA P51700079980 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
11 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 95%
40 of 55Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

ANANT AND RADHIKA HEIGHTS is a Others project by ASHAPURA CONSTRUCTION CO in Thane, Maharashtra, registered with MahaRERA as P51700079980 on 9 Apr 2025. Possession is promised by 31 Dec 2026. 15 of the 55 units on this registration are recorded sold or booked, and 11 of 22 construction stages are filed complete.

At a glance

Project

  • NameANANT AND RADHIKA HEIGHTS
  • TypeOthers
  • Location
    • SHIVAJI PATH LANE NO 2
    • RAJU NAGAR DOMBIVLI (WEST)
    • Chavindra
    • Thane
    • 421202
  • Pincode421202
  • RERA no.P51700079980
  • ReraGenie IDRG-MH-31645

Builder

  • NameASHAPURA CONSTRUCTION CO
  • Entity typePartnership

Key dates

this monthRegisteredApr 2025PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Apr 2025
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed48 files

Current status

27%15 of 55 units booked
35.5%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1 PLOT NO 1NA8721021
BUILDING NO 2 PLOT NO 2NA8728634

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

BUILDING NO 1 PLOT NO 173%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 2 PLOT NO 239%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered22
BuildingClosed/CoveredTotal
BUILDING NO 1 PLOT NO 11010
BUILDING NO 2 PLOT NO 21212

Land and ownership11

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,115 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Jul 2025
LandownerVillageDistrict
ANANT MHATREDOMBIVLIThane
RAMA MHATREDOMBIVLIThane
NILESH MHATREDOMBIVLIThane
ASHA PATILDOMBIVLIThane
NISHA THAKURDOMBIVLIThane
VISHNU MHATREDOMBIVLIThane
ALKA MHATREDOMBIVLIThane
PARESH MHATREDOMBIVLIThane
DARSHANA GAIKWADDOMBIVLIThane
DIPESH MHATREDOMBIVLIThane
VINAY MHATREDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKDMC, Kalyan
Permissible FSI2832.37
Proposed, not sanctioned2,832 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJAYANT ARCADE,RAJAWADI NAKA,GHATKOPAR(E),MUMBAI-400 077
Estimated costRs 14.93 cr
Cost incurredRs 5.30 cr
Work done35.48%
BuildingWingEstimatedIncurred
BUILDING NO 2 PLOT NO 2NARs 8.79 crRs 1.07 cr
BUILDING NO 1 PLOT NO 1NARs 5.64 crRs 4.23 cr
-NARs 50.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeepak B Patil
EngineerShanti consultant
Chartered AccountantURVI D. RANGANI
Chartered AccountantMAMTA N KHOLIYA
PartnerRole in project
ASHAPURA CONSTRUCTION CO-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form - 5.pdf25 Apr 2026
Withdrawal Update Form 1File: Form 1 Arch Certificazte Bldg No 2.pdf14 Apr 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE FORM - 2.pdf14 Apr 2026
Withdrawal Update Form 3File: form 3.pdf14 Apr 2026
Withdrawal Update Form 1File: Form 1 - Architect Certificate.pdf14 Jan 2026
Withdrawal Update Form 2File: Form 2 - Q3.pdf14 Jan 2026
Withdrawal Update Form 3File: Form 3 - Q3.pdf14 Jan 2026
Withdrawal Update Form 1File: Form - 1 - Architect Certificate.pdf15 Oct 2025
Withdrawal Update Form 2File: Form - 2 - Engineer Certificate.pdf15 Oct 2025
Withdrawal Update Form 3File: Form - 3 - CA Certificate.pdf15 Oct 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate Q1.pdf24 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf24 Jul 2025
Withdrawal Update Form 3File: Form3.pdf24 Jul 2025
Other - LegalFile: 1 Copy of Layout Approval (in case of layout) (11) (3).pdf8 Apr 2025
Other - LegalFile: Declaration of land description.pdf8 Apr 2025
Other - FinanceFile: LANDOWNER NO SALE DECLARATION.pdf4 Apr 2025
Declaration in FORM BFile: Form B - ACC.pdf26 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: KDMC - CC - 1st.pdf19 Mar 2025
Other - LegalFile: Declaration of Land description.pdf19 Mar 2025
Proforma of Allotment letterFile: Profoma of Allotment letter.pdf1 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (11).pdf1 Mar 2025
Other - LegalFile: Undertaking - Landlords.pdf1 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - SVC Bank.pdf1 Mar 2025
Other - TechnicalFile: Annexure 'A'.pdf1 Mar 2025
Proforma of Agreement for saleFile: Agreement for sale.pdf1 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - SVC Bank.pdf1 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: C A certificate.pdf1 Mar 2025
Layout approvalFile: KDMC - Approved Plan - Final with TDR.pdf1 Feb 2025
Building plan approvalFile: KDMC - Approved Plan - Final with TDR.pdf1 Feb 2025
Copy of Layout Approval (in case of layout)File: KDMC - Approved Plan - Final with TDR.pdf1 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: KDMC - Approved Plan - Final with TDR.pdf1 Feb 2025
Other - LegalFile: Supplementary Agr Vishnu S Mhatre and others.pdf1 Feb 2025
Other - LegalFile: Supplementary Agr Anant S Mhatre and others.pdf1 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Loan.pdf1 Feb 2025
Copy of the legal title reportFile: Title Certificate - RERA - LATEST.pdf31 Jan 2025
Details of encumbrances concerned to FinanceFile: Declaration - No Finanancial Encumbrance.pdf31 Jan 2025
Details of encumbrances concerned to FinanceFile: Declaration - No Legal Encumbrance.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 - Architect Certificate.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 - Engineer's Certificate.pdf31 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: KDMC - CC - Final with TDR.pdf31 Jan 2025
Declaration about Commencement CertificateFile: Declaration - Commencement Certificate.pdf31 Jan 2025
CERSAI detailsFile: CERSAI Details.pdf31 Jan 2025
Details of encumbrances concerned to LegalFile: Declaration - No Legal Encumbrance.pdf31 Jan 2025
Details of encumbrances concerned to LegalFile: Declaration - No Finanancial Encumbrance.pdf31 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A for RERA.pdf31 Jan 2025
PAN CardFile: PAN CARD ACC.pdf29 Jan 2025
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf29 Jan 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement for Sale.pdf29 Jan 2025

How this compares with Thane

27%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANANT AND RADHIKA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAJU NAGAR DOMBIVLI (WEST)7,600+ in Thane

Builder: ASHAPURA CONSTRUCTION CO

ASHAPURA CONSTRUCTION CO has 1 registration on MahaRERA, including ANANT AND RADHIKA HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ANANT AND RADHIKA HEIGHTS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANANT AND RADHIKA HEIGHTS?

The registered promoter entity is ASHAPURA CONSTRUCTION CO, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANANT AND RADHIKA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANANT AND RADHIKA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANANT AND RADHIKA HEIGHTS?

The professionals named in the filing: Architect: Deepak B Patil; Engineer: Shanti consultant; Chartered Accountant: URVI D. RANGANI; Chartered Accountant: MAMTA N KHOLIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANANT AND RADHIKA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANT AND RADHIKA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANT AND RADHIKA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.