Home / Browse projects / Pune, Maharashtra / ANANDTARA WHITEFIELD RESIDENCIES PHASE-II

Completed No litigation declared Residential / Group Housing project

ANANDTARA WHITEFIELD RESIDENCIES PHASE-II

By ANANDTARA INFRASTRUCTURE

RG-MH-76083 · RERA P52100018257 · Last updated on MahaRERA portal: 16 Jun 2023

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Feb 2021Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 0%
0Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

ANANDTARA WHITEFIELD RESIDENCIES PHASE-II is a Residential / Group Housing project by ANANDTARA INFRASTRUCTURE in Pune, Maharashtra, registered with MahaRERA as P52100018257 on 22 Oct 2018. The registration is recorded completed; possession was promised by 28 Feb 2021.

At a glance

Project

  • NameANANDTARA WHITEFIELD RESIDENCIES PHASE-II
  • TypeResidential / Group Housing
  • Location
    • KESHAVNAGAR
    • LONKAR VASTI
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • RERA no.P52100018257
  • ReraGenie IDRG-MH-76083

Builder

  • NameANANDTARA INFRASTRUCTURE
  • Entity typePartnership
  • PartnerPRAVIN PRATAPRAO GAIKWAD
  • Other registrations4 more →
  • Completed2 of 5
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2018PromisedFeb 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Oct 2018
  • Promised completion28 Feb 2021
  • Revised completionNone
  • Buildings2 building records
  • Documents filed46 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BUILDINGNA120000
B BUILDINGNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 0%.

A BUILDING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B BUILDING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities33

As on 16 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes82%
Storm Water DrainsYes85%
Landscaping & Tree PlantingYes95%
Street LightingYes90%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes82%
Solid Waste Management And DisposalYes75%
Water conservation /Rain water harvestingYes98%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes68%
Open ParkingNoNot applicable
Aesthetically Designed night IlluminationYes80%
Automatic LiftYes80%
Barbeque AreaYes85%
CCTV Security SystemYes89%
Club HouseYes90%
Intercom Direct ConnectivityYes54%
Kids Pool with paved deck surroundYes80%
Multi Purpose HallYes85%
Multiple Play AreaYes86%
Outdoor GymYes91%
OWC PlantYes90%
Party LoungeYes90%
Provision for Satelite TV connectionYes80%
Reticlated Piped Gas System Connection for KitchenYes90%
Senior Citizen sitoutYes85%
Walking TrackYes0%
Well Designed Entrance GateYes80%
Yoga and Meditation CenterYes82%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
A BUILDING11
B BUILDING11

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,057 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
RAMCHANDRA DATTATRAY LONKAR AND OTHERSPune (M Corp.)Pune
LAXMAN DATTATRAY LONKAR AND OTHERSPune (M Corp.)Pune
DATTATRAYA DASHRATH LONKAR AND OTHERSPune (M Corp.)Pune

Approvals and building plan

Permissible FSI7860.65
Proposed, not sanctioned2,715 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAURORA TOWER CAMP PUNE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS A & T Consultant through Mr Vikas Achalkar
EngineerMS G A Bhilare Consultants Pvt Ltd
PartnerRole in project
ANANDTARA INFRASTRUCTURE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100006265Feb 2021 → Feb 2022

Reason as filed by the promoterWe were required to handover area under road widening and claim FSI as compensation to the same. However, the process has taken longer than the usually estimated time. Hence out of the two buildings mentioned in the RERA Project one building receive building permission on September 2020. i.e Building A. However, it may be noted that the other building i.e Building B is estimated to be completed before time and we have received part completion and O.C and handed over possession for such building to the customer within the previously committed time frame. Hence, we are requesting an extension to

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Feb 2023

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEER_CERTIFICATE_FORM_2A.pdf16 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: LATEST FORM 4.pdf22 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Certificate A AND aminity Buliding.pdf22 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Certificate A AND aminity Buliding.pdf22 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion_Certificate_B-_Building.pdf22 Feb 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form_4.pdf22 Feb 2023
Other - FinanceFile: Form 4.pdf16 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 20-21 A INFRA.pdf15 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: AWR 21-22 PHASE II.pdf15 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Diclosure of Interest in Other Real estate Projet.pdf23 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers_Certificate_-_Rera_21-22.pdf21 Jan 2023
Status of ConveyanceFile: CONVEYANCE_DEED_WHITEFIELD.pdf9 Nov 2022
Proforma of Agreement for saleFile: AGREEMENT PROFORMA_11zon.pdf31 Oct 2022
Details of encumbrances concerned to LegalFile: ENCUMBRANCES CONSERNED TO LEGAL.pdf5 Sep 2022
CERSAI detailsFile: CERSAI.pdf5 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPRATE ACCOUNT DETAILS.pdf5 Sep 2022
Deviation Report with respect to Allotment letterFile: Profarma Allottement Letter.pdf5 Sep 2022
Deviation Report with respect to model copy of AgreementFile: AGREEMENT PROFORMA_11zon_11zon_11zon.pdf5 Sep 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Certificate.pdf7 Apr 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Nondni Pramanpatra.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate Infra Phase II.pdf14 Aug 2021
Declaration about Commencement CertificateFile: Declaration Commencement Infra Phase II Revised.pdf6 Aug 2021
Disclosure of sold/ booked inventoryFile: Phase II Sold Inventory(1).pdf19 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form_5_-_Phase_II.pdf13 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate Phase II.pdf11 Aug 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Anandtara_phase_2 Form 5.pdf6 Jul 2020
Building plan approvalFile: Layout Plan 1(1).pdf9 Jan 2020
Layout approvalFile: Layout Plan 2019.pdf9 Jan 2020
Copy of Layout Approval (in case of layout)File: Layout Plan 2019.pdf9 Jan 2020
Building Plan Approval (IOD)File: Layout Plan 1(1).pdf9 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 2019.pdf9 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: Revised NA Order of Whitefield(1).pdf9 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Anandtara_phase_2 Form 5.pdf16 Dec 2019
Building plan approvalFile: LAYOUTPLAN.pdf9 Oct 2018
Layout approvalFile: LAYOUTPLANII.pdf9 Oct 2018
PAN CardFile: PAN CARD.pdf9 Oct 2018
Copy of the legal title reportFile: Legal Title Reoprt Old.pdf9 Oct 2018
Details of encumbrancesFile: Encubrances.pdf9 Oct 2018
Copy of Layout Approval (in case of layout)File: LAYOUTPLANII.pdf9 Oct 2018
Building Plan Approval (IOD)File: LAYOUTPLAN.pdf9 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate(2).pdf9 Oct 2018
Declaration in FORM BFile: FORM B VISHWAJIT SIR.pdf9 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf9 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf9 Oct 2018
Certificates of CA (Form 3)File: CA.pdf9 Oct 2018
Proforma of Allotment letterFile: Allotment letter 1.pdf9 Oct 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANANDTARA WHITEFIELD RESIDENCIES PHASE-II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LONKAR VASTI13,700+ in Pune

Builder: ANANDTARA INFRASTRUCTURE

ANANDTARA INFRASTRUCTURE has 5 registrations on MahaRERA, including ANANDTARA WHITEFIELD RESIDENCES PHASE - I and ANANDTARA WHITEFIELD RESIDENCIES PHASE-II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ANANDTARA WHITEFIELD RESIDENCIES PHASE-II is delayed beyond 28 Feb 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANANDTARA WHITEFIELD RESIDENCIES PHASE-II?

The registered promoter entity is ANANDTARA INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANANDTARA WHITEFIELD RESIDENCIES PHASE-II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANANDTARA WHITEFIELD RESIDENCIES PHASE-II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANANDTARA WHITEFIELD RESIDENCIES PHASE-II?

The professionals named in the filing: Architect: MS A & T Consultant through Mr Vikas Achalkar; Engineer: MS G A Bhilare Consultants Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANANDTARA WHITEFIELD RESIDENCIES PHASE-II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANDTARA WHITEFIELD RESIDENCIES PHASE-II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANDTARA WHITEFIELD RESIDENCIES PHASE-II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.