ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / ANANDTARA IRIS RESIDENCES PHASE II

Registered No litigation declared Residential / Group Housing project

ANANDTARA IRIS RESIDENCES PHASE II

By ANANDTARA INFRASTRUCTURE

RG-MH-52263 · RERA P52100055274 · Last updated on MahaRERA portal: 12 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Podiums (if any), 95%
9 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 130 documents Report an error

ANANDTARA IRIS RESIDENCES PHASE II is a Residential / Group Housing project by ANANDTARA INFRASTRUCTURE in Pune, Maharashtra, registered with MahaRERA as P52100055274 on 14 Mar 2024. Possession is promised by 31 Dec 2026. 43 of the 52 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameANANDTARA IRIS RESIDENCES PHASE II
  • TypeResidential / Group Housing
  • Location
    • Mundhwa road
    • Keshavnagar
    • Keshavnagar-Mundwa
    • Pune City
    • Pune
    • 411036
  • Pincode411036
  • RERA no.P52100055274
  • ReraGenie IDRG-MH-52263

Builder

  • NameANANDTARA INFRASTRUCTURE
  • Entity typePartnership
  • GSTIN27ABBFA3595L1Z4
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSUHAS ASHOKRAO GAIKWAD, PRAVIN PRATAPRAO GAIKWAD
  • Authorized PartnerRAJKIRAN VIJAYRAO g
  • Other registrations4 more →
  • Completed2 of 5
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Mar 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed130 files

Current status

83%43 of 52 units booked
80.5%Work done, per cost certificate

Figures as on 12 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building B typeNA171452052

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 95%.

Building B type: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)95%
Plinth100%
Stilt Floor0%
Slabs of Super Structure94%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises46%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes2%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed78

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots78
Closed/Covered78

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,514 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on17 Oct 2025

Approvals and building plan

Sanctioning authorityBUILDING PERMISSION DEPARTMENT PUNE MUNICIPAL CORPORATION
Permissible FSI5302.33
Proposed, not sanctioned5,302 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchArora Tower M G Road Camp Pune 411011
Estimated costRs 17.86 cr
Cost incurredRs 14.38 cr
Work done80.52%
BuildingWingEstimatedIncurred
Building B typeNARs 13.25 crRs 9.58 cr
-NARs 4.61 crRs 4.81 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR MANOJ TATOOSKAR
EngineerSUHAS ASHOKRAO GAIKWAD
Chartered AccountantPVC AND COMPANY PARAS VIJAPURE
PartnerRole in project
ANANDTARA INFRASTRUCTURE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed130

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: form 2A 2025 -2026 phase 2 latest format.pdf12 Jun 2026
Withdrawal Update Form 1File: phase 2 form 1.pdf13 May 2026
Withdrawal Update Form 1File: phase 2 form 1.pdf13 May 2026
Withdrawal Update Form 2File: phase 2 form 2.pdf13 May 2026
Withdrawal Update Form 2File: phase 2 form 2.pdf13 May 2026
Withdrawal Update Form 3File: phase 2 form 3.pdf13 May 2026
Withdrawal Update Form 3File: phase 2 form 3.pdf13 May 2026
Withdrawal Update Form 1File: phase 2 form 1.pdf4 Mar 2026
Withdrawal Update Form 1File: phase 2 form 1.pdf4 Mar 2026
Withdrawal Update Form 2File: Form_2-_ph_2_-_Q3_IRIS.pdf4 Mar 2026
Withdrawal Update Form 2File: Form_2-_ph_2_-_Q3_IRIS.pdf4 Mar 2026
Withdrawal Update Form 3File: form 3 phase 2.pdf4 Mar 2026
Withdrawal Update Form 3File: form 3 phase 2.pdf4 Mar 2026
Withdrawal Update Form 1File: phase 2 form 1.pdf9 Feb 2026
Withdrawal Update Form 1File: phase 2 form 1.pdf9 Feb 2026
Withdrawal Update Form 2File: Form_2-_ph_2_-_Q3_IRIS.pdf9 Feb 2026
Withdrawal Update Form 2File: Form_2-_ph_2_-_Q3_IRIS.pdf9 Feb 2026
Withdrawal Update Form 3File: form 3 phase 2.pdf9 Feb 2026
Withdrawal Update Form 3File: form 3 phase 2.pdf9 Feb 2026
Form 1File: form one of phase two.pdf3 Sep 2025
Form 2File: FORM 2 PHASE II.pdf3 Sep 2025
Form 3File: FORM 3 PHASE 2.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: APR TO JUNE 24.pdf3 Sep 2025
Form 1File: PHASE I FORM 2.pdf3 Sep 2025
Form 2File: PHASE II FORM 2 SIGNED.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: JULY 2024 TO SEPT 2024.pdf3 Sep 2025
Form 3File: FORM 3 PHASE 2.pdf3 Sep 2025
Form 1File: PHASE 1 FORM 2.pdf3 Sep 2025
Form 2File: PHASE 2 FORM 2.pdf3 Sep 2025
Form 3File: phase 2 form 3.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: OCT 24 TO DEC 24.pdf3 Sep 2025
Building plan approvalFile: floor plan highlighted.pdf12 Aug 2025
Building plan approvalFile: revised plan 3.pdf8 Aug 2025
Building plan approvalFile: floor_plan_highlighted_2.pdf8 Aug 2025
Layout approvalFile: revised plan 3.pdf8 Aug 2025
Building plan approvalFile: floor_plan_highlighted_2.pdf8 Aug 2025
Building plan approvalFile: reccreational highlighted.pdf8 Aug 2025
Building plan approvalFile: section and elecation 7.pdf8 Aug 2025
Layout approvalFile: new cc.pdf8 Aug 2025
Building plan approvalFile: revised cc.pdf8 Aug 2025
Form 1File: form 1 phase 2.pdf6 Aug 2025
Form 2File: Form_2-_B_wing_ph2.pdf6 Aug 2025
Form 3File: FORM_3_PHASE_II.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: book and sold form 3.pdf6 Aug 2025
Form 2File: phase 2 form 2.pdf6 Aug 2025
Form 3File: FORM 3 PHASE 2.pdf6 Aug 2025
Form 1File: FORM 1 PHASE 2.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: book and sold inventary.pdf6 Aug 2025
Withdrawal Update Form 1File: FORM 1 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 1File: FORM 1 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 1File: FORM 1 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 1File: FORM 1 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 1File: FORM 1 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 1File: FORM 1 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 2File: FORM 2 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 2File: FORM 2 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 2File: FORM 2 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 2File: FORM 2 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 2File: FORM 2 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 2File: FORM 2 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 3File: FORM 3 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 3File: FORM 3 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 3File: FORM 3 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 3File: FORM 3 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 3File: FORM 3 PHASE 2.pdf31 Jul 2025
Withdrawal Update Form 3File: FORM 3 PHASE 2.pdf31 Jul 2025
Building plan approvalFile: highlighted plan 1.pdf24 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PHASE 2.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PHASE 2.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: phase 2 form 2.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 phase II.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase 2 form 1.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: phase 2 form 3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PHASE 2 FORM 2.pdf20 Jan 2025
Proforma of Agreement for saleFile: PHASE AGR UPLOADED AFTER REVISE PLAN.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REVISED FORM 3.pdf11 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf11 Oct 2024
Building plan approvalFile: highlighted plan 1.pdf8 Oct 2024
Building plan approvalFile: floor plan highlighted.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf8 Oct 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Whitefield phase C and Dsurvey no 32 mundhwa160CompletedDec 2020Dec 2019

How this compares with Pune

83%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANANDTARA IRIS RESIDENCES PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Keshavnagar13,700+ in Pune

Builder: ANANDTARA INFRASTRUCTURE

ANANDTARA INFRASTRUCTURE has 5 registrations on MahaRERA, including ANANDTARA WHITEFIELD RESIDENCES PHASE - I and ANANDTARA WHITEFIELD RESIDENCIES PHASE-II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ANANDTARA IRIS RESIDENCES PHASE II is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANANDTARA IRIS RESIDENCES PHASE II?

The registered promoter entity is ANANDTARA INFRASTRUCTURE, a partnership as per the filing. Its GSTIN 27ABBFA3595L1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANANDTARA IRIS RESIDENCES PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANANDTARA IRIS RESIDENCES PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANANDTARA IRIS RESIDENCES PHASE II?

The professionals named in the filing: Architect: AR MANOJ TATOOSKAR; Engineer: SUHAS ASHOKRAO GAIKWAD; Chartered Accountant: PVC AND COMPANY PARAS VIJAPURE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANANDTARA IRIS RESIDENCES PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANDTARA IRIS RESIDENCES PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANDTARA IRIS RESIDENCES PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.