Home / Browse projects / Aurangabad, Maharashtra / Anandam Homes
Anandam Homes
RG-MH-30017 · RERA P51500053111 · Last updated on MahaRERA portal: 7 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Anandam Homes is a Others project by Growell Business in Aurangabad, Maharashtra, registered with MahaRERA as P51500053111 on 16 Oct 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date.
At a glance
Project
- NameAnandam Homes
- TypeOthers
- Location
- Plot No. 1
- Gut No. 54
- Near Bhondawe Patil School
- Waluj Mahanagar 1
- Wadgaon Kolhati
- Wadgaon Kolhati (CT)
- Aurangabad
- 431136
- Pincode431136
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500053111
- ReraGenie IDRG-MH-30017
Builder
- NameGrowell Business
- Entity typePartnership
- GSTIN27AAUFG5983C1ZW
- PartnersShashank Ladniya, Rajkumar Ladniya
- Authorised PartnerPrafullkumar Agrawal
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on16 Oct 2023
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings3 building records
- Documents filed70 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A Wing A | NA | 7 | 0 | 0 | 0 | 0 |
| Building A Wing B | NA | 7 | 0 | 0 | 0 | 0 |
| Building B | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 7 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
13 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.
Building A Wing A60%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building A Wing B60%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building B27%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 7 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed156
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building A Wing A | 49 | 49 |
| Building A Wing B | 50 | 50 |
| Building B | 57 | 57 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sunil M Bhale |
| Engineer | Sanket S Singi |
| Chartered Accountant | Girish Mundada |
| Partner | Role in project |
|---|---|
| Growell Business | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Rera Doc__From 1_Q-1_compressed.pdf | 7 Jul 2026 |
| Form 2File: From 2_Q1_26-27_compressed.pdf | 7 Jul 2026 |
| Form 3File: From 3_Q1_26-27_compressed.pdf | 7 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked_Q-1_26-27_compressed.pdf | 7 Jul 2026 |
| Self-declaration of Quarterly ProgressFile: Q-1_Self Declaration 26-27_compressed.pdf | 7 Jul 2026 |
| Form 1File: Rera Doc_From 1_Q1_compressed.pdf | 6 Jul 2026 |
| Form 2File: Rera From-2_Q1_25-26_compressed.pdf | 6 Jul 2026 |
| Form 3File: Rera From 3_Q1_25-26_compressed.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD__Q-1 _compressed.pdf | 6 Jul 2026 |
| Self-declaration of Quarterly ProgressFile: Q-1_Self Declaration 25-26_compressed.pdf | 6 Jul 2026 |
| Form 1File: Rera Doc_From1_Q2_compressed.pdf | 6 Jul 2026 |
| Form 2File: Rera From-_Q2_25-26_compressed.pdf | 6 Jul 2026 |
| Form 3File: Rera From 3_Q2-25-26_compressed.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCOSURE OF SOLD UNSOLD Q-2_compressed.pdf | 6 Jul 2026 |
| Self-declaration of Quarterly ProgressFile: Q-2_Self Declaration 25-26_compressed.pdf | 6 Jul 2026 |
| Form 1File: Rera Doc_From1_Q3_compressed.pdf | 6 Jul 2026 |
| Form 2File: Rera From-2_Q3_25-26_compressed.pdf | 6 Jul 2026 |
| Form 3File: Rera From 3_Q3_25-26_compressed.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD_Q-3_compressed.pdf | 6 Jul 2026 |
| Self-declaration of Quarterly ProgressFile: Q-3_Self Declaration 25-26_compressed (1).pdf | 6 Jul 2026 |
| Form 1File: Rera Doc__form 1_4Q_compressed.pdf | 6 Jul 2026 |
| Form 2File: Rera Form -2__Q4_25-26_compressed.pdf | 6 Jul 2026 |
| Form 3File: Rera From 3_Q4_25-26_compressed.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked_Q4_25-26_compressed.pdf | 6 Jul 2026 |
| Self-declaration of Quarterly ProgressFile: Q-4_Self Declaration 25-26_compressed.pdf | 6 Jul 2026 |
| OthersFile: RERA FROM 5_Q4_compressed.pdf | 6 Jul 2026 |
| Form 2File: Form 2_FY24-25-compressed.pdf | 30 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GROWELL FORM 2_compressed.pdf | 22 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: GROWELL DISCLOSURE SOLD UNSOLD_compressed.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_compressed.pdf | 3 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 1 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA_Annual Certificate.pdf | 1 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate_2024_compressed.pdf | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certificate_Dec 24_compressed.pdf | 23 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of SoldUnsold Inventory_Dec24_compressed.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 17-10-24_compressed.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate 14-10-24.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 growell rera_compressed.pdf | 12 Aug 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ANNEXURE A_compressed.pdf | 7 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_compressed.pdf | 6 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Unsold Inventory_compressed.pdf | 6 Aug 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf | 6 Aug 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: GROWELL PARTNERSHIP DEED_RETIREMENT_01042024_compressed.pdf | 5 Aug 2024 |
| Building plan approvalFile: Building Plan 1_3_Signed_compressed.pdf | 1 Jul 2023 |
| Building plan approvalFile: Building Plan 2 3.pdf | 1 Jul 2023 |
| Layout approvalFile: Building Plan 1_3_Signed_compressed (1).pdf | 1 Jul 2023 |
| PAN CardFile: Pan Card_Growell (1).pdf | 1 Jul 2023 |
| Copy of the legal title reportFile: 1 Copy of the legal title report.pdf | 1 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: NON-ENCUMBRANCE FINANCE.pdf | 1 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: DECLARATION ABOUT NON-EMCUMBRANCE LEGAL.pdf | 1 Jul 2023 |
| Details of encumbrances concerned to LegalFile: NON-ENCUMBRANCE FINANCE.pdf | 1 Jul 2023 |
| Details of encumbrances concerned to LegalFile: DECLARATION ABOUT NON-EMCUMBRANCE LEGAL.pdf | 1 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: Building Plan 1_3_Signed_compressed (1).pdf | 1 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1_3_Signed_compressed.pdf | 1 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2 3.pdf | 1 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_Signed_compressed.pdf | 1 Jul 2023 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 1 Jul 2023 |
| Declaration in FORM BFile: FORN-B_compressed (1).pdf | 1 Jul 2023 |
| CERSAI detailsFile: CERSAI_24_06_23_compressed.pdf | 1 Jul 2023 |
| CERSAI detailsFile: DECLARATION ABOUT CERSAI.pdf | 1 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_24_06_23_compressed (1).pdf | 1 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest.pdf | 1 Jul 2023 |
| Proforma of Allotment letterFile: RERA Allotment.pdf | 1 Jul 2023 |
| Proforma of Agreement for saleFile: RERA ATS_Final.pdf | 1 Jul 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Status of Formation of Legal Entity.pdf | 1 Jul 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: ROF.pdf | 1 Jul 2023 |
| Status of ConveyanceFile: 1 Status of Conveyance.pdf | 1 Jul 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT 'A'.pdf | 1 Jul 2023 |
| Deviation Report with respect to Allotment letterFile: No Deviation ALLOTMENT LETTER.pdf | 1 Jul 2023 |
| Deviation Report with respect to model copy of AgreementFile: NO DEVIATION LETTER ATS.pdf | 1 Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Anandam Homes on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wadgaon Kolhati1,400+ in Aurangabad
Filed coordinates, straight-line distance. 31 registered projects within 2 km.
SARA SWARAJYA PHASE-I
SARA INFRASTRUCTURES
Khinvasara Town Part-1
Champalal Kanhaiyalal Khinvasara
Waluj Trade Tower
Govind Enterprises
Renuka Nagari
Shlok Realty
GOLOK CARNATION
GOLOK DEVELOPERS
THE URBAN OASIS
AMRUT NISHA SAI LANDMARKS
See every Aurangabad project, with the district possession charts
Builder: Growell Business
Growell Business has 1 registration on MahaRERA, including Anandam Homes. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What does it mean that Anandam Homes shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Anandam Homes is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Anandam Homes?
The registered promoter entity is Growell Business, a partnership as per the filing. Its GSTIN 27AAUFG5983C1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Anandam Homes?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Anandam Homes?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Anandam Homes?
The professionals named in the filing: Architect: Sunil M Bhale; Engineer: Sanket S Singi; Chartered Accountant: Girish Mundada. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Anandam Homes?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback