Ananda CHS Wing B

By Ananda Living Spaces LLP

RG-MH-06755 · RERA P51800053700 · Last updated on MahaRERA portal: 11 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 90%
64 of 65Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

Ananda CHS Wing B is a Residential / Group Housing project by Ananda Living Spaces LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053700 on 22 Nov 2023. Possession is promised by 31 Mar 2027. 1 of the 65 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameAnanda CHS Wing B
  • TypeResidential / Group Housing
  • Location
    • S L Road
    • Mulund West
    • Mulund
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800053700
  • ReraGenie IDRG-MH-06755

Builder

  • NameAnanda Living Spaces LLP
  • Entity typePartnership
  • PartnersPriyank Hemani, Mahendra Parekh, Rajan Chhibber

Key dates

this monthRegisteredNov 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Nov 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Current status

2%1 of 65 units booked
14.4%Work done, per cost certificate

Figures as on 11 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ananda CHS Wing BNA242365065

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 90%.

Ananda CHS Wing B: 15% average across the applicable activities

ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area504 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jun 2025
LandownerVillageDistrict
Bombay Slum Redevelopment Corporation Pvt LtdKolekalyanMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI3791.79
Proposed, not sanctioned3,792 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCST Road Kalina Mumbai
Estimated costRs 25.01 cr
Cost incurredRs 3.60 cr
Work done14.37%
BuildingWingEstimatedIncurred
Ananda CHS Wing BNARs 21.26 crRs 3.60 cr
-NARs 3.75 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGrit Architectural Consultancy Pvt Ltd
EngineerDiya Home Solutions
Chartered AccountantDurgesh R Pandey and Associates
Chartered AccountantAjay O Tiwari and Associates
Chartered AccountantG S R S and Company
Chartered AccountantDIPAK KAPADIA & ASSOCIATES
Chartered AccountantManish Anant Rupani
PartnerRole in project
Ananda Living Spaces LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Ananda Wing-B Form-1 Dec 2025.pdf11 Feb 2026
Withdrawal Update Form 2File: Ananda Wing-B Form-2 Dec 2025.pdf11 Feb 2026
Withdrawal Update Form 3File: Ananda Wing-B Form-3 Dec 2025.pdf11 Feb 2026
Form 2A (FY 2023-2024)File: Ananda_wing B Form-2A 2023-24.pdf11 Feb 2026
Form 2A (FY 2024-2025)File: Ananda_wing B Form-2A 2024-25.pdf11 Feb 2026
Withdrawal Update Form 1File: Ananda Wing-B Form-1 Sep 2025.pdf24 Nov 2025
Withdrawal Update Form 2File: Ananda Wing-B Form-2 Sep 2025.pdf24 Nov 2025
Withdrawal Update Form 3File: Ananda Wing-B Form-3 Sep 2025.pdf24 Nov 2025
Building plan approvalFile: IoA_2025-Part-1.pdf10 Nov 2025
Building plan approvalFile: IoA_2025-Part-2.pdf10 Nov 2025
Building plan approvalFile: Approved plan letter 7-3-2025.pdf10 Nov 2025
Withdrawal Update Form 1File: Ananda-B_Form-1_June 2025.pdf10 Nov 2025
Withdrawal Update Form 1File: Ananda-B_Form-1_June 2025.pdf10 Nov 2025
Withdrawal Update Form 2File: Ananda-B_Form-2_June 2025.pdf10 Nov 2025
Withdrawal Update Form 2File: Ananda-B_Form-2_June 2025.pdf10 Nov 2025
Withdrawal Update Form 3File: Ananda-B_Form-3_June 2025.pdf10 Nov 2025
Withdrawal Update Form 3File: Ananda-B_Form-3_June 2025.pdf10 Nov 2025
Form 5 (FY 2023-2024)File: Ananda B Form 5 FY 2023-24.pdf1 Nov 2025
Form 5 (FY 2024-2025)File: Ananda B Form 5 FY 2024-25.pdf1 Nov 2025
Form 1File: Ananda Arch Cert Dec-23.pdf16 Sep 2025
Form 2File: Ananda & BSRCPL Form 2 Dec-2023.pdf16 Sep 2025
Form 3File: BSRCPL & ANANDA CA Cert Dec-2023.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure December 2023.pdf16 Sep 2025
Form 1File: Ananda Arch Cert Mar-24.pdf16 Sep 2025
Form 2File: ANANDA & BSRCPL Form 2 Mar-2024.pdf16 Sep 2025
Form 3File: ANANDA & BSRCPL CA Cert Mar-2024.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure March 2024 New.pdf16 Sep 2025
Form 1File: Ananda Arch Cert Jun-24.pdf16 Sep 2025
Form 2File: Ananda & BSRCPL Form 2 Jun-2024.pdf16 Sep 2025
Form 3File: ANANDA & BSRCPL CA Cert Jun-2024.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure June 2024.pdf16 Sep 2025
Form 1File: Ananda Arch Cert Sep-24.pdf16 Sep 2025
Form 2File: Ananda & BSRCPL Form 2 Sep-2024.pdf16 Sep 2025
Form 3File: ANANDA & BSRCPL CA Cert Sep-2024.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure September 2024 New.pdf16 Sep 2025
Form 1File: Ananda Arch Cert Dec-24.pdf16 Sep 2025
Form 2File: Ananda & BSRCPL Form 2 Dec-2024.pdf16 Sep 2025
Form 3File: ANANDA & BSRCPL CA Cert Dec-2024.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure December 2024.pdf16 Sep 2025
Form 1File: Ananda Arch Cert Mar-25.pdf16 Sep 2025
Form 2File: Ananda & BSRCPL Form 2 Mar-2025.pdf16 Sep 2025
Form 3File: ANANDA & BSRCPL CA Cert Mar-2025.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure March 2025.pdf16 Sep 2025
Disclosure of sold/ booked inventoryFile: 202312_Sold.pdf31 Jan 2024
Building plan approvalFile: 4-2.pdf27 Oct 2023
Building plan approvalFile: 4-3.pdf27 Oct 2023
Building plan approvalFile: 4-4.pdf27 Oct 2023
Building plan approvalFile: 4-5.pdf27 Oct 2023
Building plan approvalFile: 4-6.pdf27 Oct 2023
Building plan approvalFile: 4-8.pdf27 Oct 2023
Building plan approvalFile: 5_IoA_Letter-1.pdf27 Oct 2023
Building plan approvalFile: 5_IoA_Letter-2.pdf27 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 4-2.pdf27 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 4-3.pdf27 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 4-4.pdf27 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 4-5.pdf27 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 4-6.pdf27 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 4-8.pdf27 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 5_IoA_Letter-1.pdf27 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 5_IoA_Letter-2.pdf27 Oct 2023
Declaration about Commencement CertificateFile: 7_CC-Declaration.pdf27 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11_CA_New.pdf27 Oct 2023
Proforma of Agreement for saleFile: 14_AfS.pdf27 Oct 2023
Deviation Report with respect to model copy of AgreementFile: 14A_AfS Deviation.pdf27 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 18A_ALS_Bank Declaration.pdf6 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 18B_BSRCPL_Bank Declaration.pdf6 Oct 2023
Copy of the legal title reportFile: 2A_Search.pdf5 Oct 2023
Proforma of Allotment letterFile: 13_Allotment.pdf5 Oct 2023
Deviation Report with respect to Allotment letterFile: 13_Allotment Deviation.pdf5 Oct 2023
Other - FinanceFile: 22_OF_Declaration-Form3.pdf5 Oct 2023
Copy of the legal title reportFile: 2_TC.pdf2 Oct 2023
Declaration in FORM BFile: 8_Form-B_ALSllp.pdf2 Oct 2023
Details of encumbrances concerned to FinanceFile: 3A_Financial Encumbrance.pdf21 Sep 2023
Details of encumbrances concerned to FinanceFile: 3B_Legal Encumbrance.pdf21 Sep 2023
Details of encumbrances concerned to LegalFile: 3A_Financial Encumbrance.pdf21 Sep 2023
Details of encumbrances concerned to LegalFile: 3B_Legal Encumbrance.pdf21 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: 6_CC.pdf21 Sep 2023
CERSAI detailsFile: 12_CERSAI.pdf21 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 17_OREO_RRC.pdf21 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 17_OREO_MJP.pdf21 Sep 2023

How this compares with Mumbai Suburban

2%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ananda CHS Wing B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund West6,700+ in Mumbai Suburban

2 kmAnanda CHS Wing BCompleted 126Lapsed / revoked 99Other 160Dot size: filed unitsN

Filed coordinates, straight-line distance. 385 registered projects within 2 km.

Builder: Ananda Living Spaces LLP

Ananda Living Spaces LLP has 1 registration on MahaRERA, including Ananda CHS Wing B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Ananda CHS Wing B is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ananda CHS Wing B?

The registered promoter entity is Ananda Living Spaces LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ananda CHS Wing B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ananda CHS Wing B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ananda CHS Wing B?

The professionals named in the filing: Architect: Grit Architectural Consultancy Pvt Ltd; Engineer: Diya Home Solutions; Chartered Accountant: Durgesh R Pandey and Associates; Chartered Accountant: Ajay O Tiwari and Associates; Chartered Accountant: G S R S and Company; Chartered Accountant: DIPAK KAPADIA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ananda CHS Wing B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ananda CHS Wing B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ananda CHS Wing B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.