Home / Browse projects / Aurangabad, Maharashtra / Amrut Sai Gold Star Phase II

Registered No litigation declared Residential / Group Housing project

Amrut Sai Gold Star Phase II

By AMRUT SAI GOLD STAR

RG-MH-21855 · RERA P51500050887 · Last updated on MahaRERA portal: 1 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
18 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

Amrut Sai Gold Star Phase II is a Residential / Group Housing project by AMRUT SAI GOLD STAR in Aurangabad, Maharashtra, registered with MahaRERA as P51500050887 on 15 May 2023. Possession is promised by 31 Mar 2027. 14 of the 32 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameAmrut Sai Gold Star Phase II
  • TypeResidential / Group Housing
  • Location
    • Gut No 32 Part
    • Golwadi
    • Waluj Mahanagar
    • Aurangabad
    • Aurangabad (M Corp.)
    • 431136
  • Pincode431136
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500050887
  • ReraGenie IDRG-MH-21855

Builder

  • NameAMRUT SAI GOLD STAR
  • Entity typeOthers
  • GSTIN27AAIAA3715F1Z0
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Named personsMahesh Shankarlal Lila, Sulochana Rajkumar Lila
  • Other registrations1 more →

Key dates

this monthRegisteredMay 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 May 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Current status

44%14 of 32 units booked
39.9%Work done, per cost certificate

Figures as on 1 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Amrut Sai Gold Star Phase IINA2232032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

Amrut Sai Gold Star Phase II: 51% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Closed/Covered64

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,374 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Sulochana Rajkumar LilaGolwadiAurangabad
MaheshKumar Shankarlal LilaGolwadiAurangabad

Approvals and building plan

Sanctioning authorityCity And Industrial Development Corporation OF Maharashtra Limited
Permissible FSI5362.18
Proposed, not sanctioned5,362 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDEOGIRI COLLEGE AURANGABAD
Estimated costRs 12.63 cr
Cost incurredRs 5.05 cr
Work done39.94%
BuildingWingEstimatedIncurred
Amrut Sai Gold Star Phase IINARs 12.46 crRs 5.05 cr
-NARs 17.53 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManggal Design Pramaod Vithoba Narale
EngineerYogesh Vishnu Kayande
EngineerPrakash Uttamrao Vidhatge
Chartered AccountantAlkesh Rawka and Associates Sonam Nagar Nagar
Chartered AccountantSonawane Sahane & Associates
PartnerRole in project
AMRUT SAI GOLD STAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 ASGS-II Q-4.pdf1 May 2026
Withdrawal Update Form 2File: Form-2 ASGS-II Q-4.pdf1 May 2026
Withdrawal Update Form 3File: Form-3 ASGS-II Q-4.pdf1 May 2026
Withdrawal Update Form 1File: Form-1 ASGS-II Q-3.pdf19 Feb 2026
Withdrawal Update Form 2File: Form-2 ASGS-II Q-3.pdf19 Feb 2026
Withdrawal Update Form 3File: Form-3 ASGS-II Q-3.pdf19 Feb 2026
Withdrawal Update Form 1File: Form-1 2025-26 Q2.pdf29 Oct 2025
Withdrawal Update Form 2File: Form-2 2025-26 Q2.pdf29 Oct 2025
Withdrawal Update Form 3File: Form-3 2025-26 Q2.pdf29 Oct 2025
Form 1File: Form 1-2023-24-Q3.pdf15 Aug 2025
Form 2File: Form 2-2023-24-Q3.pdf15 Aug 2025
Form 3File: Form 3-2023-24-Q3.pdf15 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-2023-24-Q3.pdf15 Aug 2025
Form 1File: Form 1-2023-24-Q4.pdf15 Aug 2025
Form 2File: Form 2-2023-24-Q4.pdf15 Aug 2025
Form 3File: Form 3-2023-24-Q4.pdf15 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-2023-24-Q4.pdf15 Aug 2025
Form 1File: Form 1-2024-25-Q1.pdf15 Aug 2025
Form 2File: Form 2-2024-25-Q1.pdf15 Aug 2025
Form 3File: Form 3-2024-25-Q1.pdf15 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-2024-25-Q1.pdf15 Aug 2025
Form 1File: Form 1-2024-25-Q2.pdf15 Aug 2025
Form 2File: Form 2-2024-25-Q2.pdf15 Aug 2025
Form 3File: Form 3-2024-25-Q2.pdf15 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-2024-25-Q2.pdf15 Aug 2025
Form 1File: Form 1-2024-25-Q3.pdf15 Aug 2025
Form 2File: Form 2-2024-25-Q3.pdf15 Aug 2025
Form 3File: Form 3-2024-25-Q3.pdf15 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-2024-25-Q3.pdf15 Aug 2025
Form 1File: Form 1-2024-25-Q4.pdf15 Aug 2025
Form 2File: Form 2-2024-25-Q4.pdf15 Aug 2025
Form 3File: Form 3 2024-25 Q4.pdf15 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-2024-25-Q4.pdf15 Aug 2025
Withdrawal Update Form 1File: Form-1 2025-26 Q1.pdf14 Aug 2025
Withdrawal Update Form 2File: Form-2 2025-26 Q1.pdf14 Aug 2025
Withdrawal Update Form 3File: ASGS PH-II Form 3.pdf14 Aug 2025
Withdrawal Update Form 1File: Form-1 2025-26 Q1.pdf19 Jul 2025
Withdrawal Update Form 2File: Form-2 2025-26 Q1.pdf19 Jul 2025
Withdrawal Update Form 3File: ASGS PH-II Form 3.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q4.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q4.pdf5 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 2024-25 Q4.pdf5 Apr 2025
Disclosure of sold/ booked inventoryFile: ASGS PH-1 SOLD UNSOLD.pdf5 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 2024-25 Q3.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASGS CA Certificate PH-2_.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q3.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q3.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 2024-25 Q3.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2024-25 Q2_.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 II.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 II.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold II.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase II 24-25 Q1.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase II 24-25 Q1.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Phase II 23-24.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory PH II.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase II 24-25 Q1.pdf18 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 PH II 24-25.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 23-24.pdf22 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 23-24 Q2.pdf22 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 23-24 Q1.pdf22 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 23-24 Q2.pdf22 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 FY 23-24 Q1 Signed.pdf22 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 23-24 Q2 Signed.pdf22 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 FY 23-24 Q3 Signed.pdf22 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 FY 23-24 Q4 Signed.pdf22 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM-2.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form no2 Q4.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold PH II Q3.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold unsold PH II Q4.pdf15 Apr 2024
CERSAI detailsFile: Cersai Declaration new.pdf11 May 2023
CERSAI detailsFile: CERSAI_Search_Report_200268194296_For_Asset_Based_Search_09_05_2023_11_56_03_931.pdf9 May 2023
Details of encumbrances concerned to FinanceFile: B Details of encumbrances concerned to Legal (3 files merged)_organized_organized.pdf19 Apr 2023
Details of encumbrances concerned to LegalFile: B Details of encumbrances concerned to Legal (3 files merged)_organized_organized.pdf19 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate_compressed.pdf12 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf8 Apr 2023
Copy of the legal title reportFile: ASGS PH-2 Search Report.pdf3 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf30 Mar 2023

How this compares with Aurangabad

44%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep Amrut Sai Gold Star Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Aurangabad1,400+ in Aurangabad

2 kmAmrut Sai Gold Star PhasCompleted 13Lapsed / revoked 9Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 51 registered projects within 2 km.

Builder: AMRUT SAI GOLD STAR

AMRUT SAI GOLD STAR has 2 registrations on MahaRERA, including Amrut Sai Gold Star and Amrut Sai Gold Star Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if Amrut Sai Gold Star Phase II is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Amrut Sai Gold Star Phase II?

The registered promoter entity is AMRUT SAI GOLD STAR, an others as per the filing. Its GSTIN 27AAIAA3715F1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Amrut Sai Gold Star Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Amrut Sai Gold Star Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Amrut Sai Gold Star Phase II?

The professionals named in the filing: Architect: Manggal Design Pramaod Vithoba Narale; Engineer: Yogesh Vishnu Kayande; Engineer: Prakash Uttamrao Vidhatge; Chartered Accountant: Alkesh Rawka and Associates Sonam Nagar Nagar; Chartered Accountant: Sonawane Sahane & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Amrut Sai Gold Star Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Amrut Sai Gold Star Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Amrut Sai Gold Star Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.