Red flags

  • De-registered
  • Possession 58 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2021Possession promised58 months past this date
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 45 documents Report an error

AMRAPALI is a Residential / Group Housing project by MANGAL BUILDHOME PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800015180 on 2 Feb 2018. Possession was promised by 30 Dec 2021 and is now 58 months past that date.

At a glance

Project

  • NameAMRAPALI
  • TypeResidential / Group Housing
  • Location
    • PARANJAPE SCHEME A ROAD NO 2
    • VILE PARLE EAST
    • Andheri
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800015180
  • ReraGenie IDRG-MH-73214

Builder

  • NameMANGAL BUILDHOME PRIVATE LIMITED
  • Entity typeCompany
  • CINU45201MH2010PTC259841
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsAKSHAY AJAY KULKARNI, HARDIK MEGHRAJ JAIN, VAIBHAV RAJESH DESAI
  • Other registrations6 more →
  • Completed2 of 7
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

58 months past promisethis monthRegisteredFeb 2018PromisedDec 2021

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on2 Feb 2018
  • Promised completion30 Dec 2021
  • Revised completionNone
  • Buildings3 building records
  • Documents filed45 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AMRAPALI A - WINGNA90000
AMRAPALI B - WINGNA90000
AMRAPALI C - WINGNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 15 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

AMRAPALI A - WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
AMRAPALI B - WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
AMRAPALI C - WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered21
Open Space2
BuildingClosed/CoveredOpen SpaceTotal
AMRAPALI A - WING19221
AMRAPALI B - WING101
AMRAPALI C - WING101

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,416 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3823.3
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSUNCITY THEATRE VILE PARLE EAST MUMBAI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV V & Associates
EngineerDWIJEN BHATT
PartnerRole in project
MANGAL BUILDHOME PRIVATE LIMITED-

Litigation declared1

CaseCourtStatus
42/2017BOMBAY HIGH COURTCOURT RECEIVER APPOINTED

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jan 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jan 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jan 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed45

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrances concerned to FinanceFile: encumbrances.pdf15 Nov 2024
Disclosure of sold/ booked inventoryFile: disclosure inventory unsold.pdf15 Nov 2024
Disclosure of sold/ booked inventoryFile: disclosure inventory unsold.pdf15 Nov 2024
CERSAI detailsFile: CERSAI.pdf15 Nov 2024
Details of encumbrances concerned to LegalFile: encumbrances.pdf15 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest Mr Akshay Kulkarni.pdf15 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest Mr Vaibhav Desai.pdf15 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest .pdf15 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: disclosure unsecured finance.pdf15 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: vi) Architects Certificate.pdf13 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: CA Certificate Form march 2018.pdf13 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: v) Structural engineer FRAMES (Certificate of cost incurred ).pdf13 Nov 2024
Other - LegalFile: Order No 42 Annexure A and Bcompressed.pdf13 Nov 2024
Other - LegalFile: iv) Litigation Clarification.pdf13 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Sachin S Yadav Dt06092024 for fy 2020.pdf13 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA Certificate Form march 2019.pdf13 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Certificate Form march 2020.pdf13 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Certificate Form march 2021.pdf13 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sachin S Yadav D 06092024 for fy2021.pdf13 Nov 2024
Other - TechnicalFile: ii) BOARD RESOLUTION 2.pdf13 Nov 2024
Other - TechnicalFile: iii) Authority letter.pdf13 Nov 2024
Other - TechnicalFile: iv) Litigation Clarification.pdf13 Nov 2024
Other - TechnicalFile: Acknowlegment Copy (Submission of document Application).pdf13 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Certificate Form march 2022.pdf13 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Sachin S Yadav Dt 06092024 for2022.pdf13 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Sachin S Yadav Dt 06092024 for 2023.pdf13 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate Form march 2023.pdf13 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sachin S Yadav Dt 06092024 for 2024.pdf13 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate Form march 2024.pdf13 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Architects Letter for CC.pdf14 Dec 2018
Building plan approvalFile: IOD pg 1.pdf20 Jan 2018
Building plan approvalFile: Amended IOD 2015.pdf20 Jan 2018
Layout approvalFile: Layout Plan.pdf20 Jan 2018
PAN CardFile: PAN CARD.pdf20 Jan 2018
Copy of the legal title reportFile: Title Certificate.pdf20 Jan 2018
Details of encumbrancesFile: No Encumbrances.pdf20 Jan 2018
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf20 Jan 2018
Building Plan Approval (IOD)File: IOD pg 1.pdf20 Jan 2018
Building Plan Approval (IOD)File: Amended IOD 2015.pdf20 Jan 2018
Declaration in FORM BFile: Declaration Cum Affidavit.pdf20 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate FORM 1.pdf20 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate Amrapali.pdf20 Jan 2018
Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE AMRAPALI.pdf20 Jan 2018
Proforma of Allotment letterFile: ALLOTMENT LETTER AMRAPALI.pdf20 Jan 2018
Proforma of Allotment letterFile: AGREEMENT FOR SALE RERA.pdf20 Jan 2018

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise2 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
RoyaleP51800045406Vile Parle East, Mumbai Suburban-May 2022CompletedMay 2025Oct 2024
Mangal SmritiP51800028224NEAR DIAMOND GARDEN, Mumbai Suburban-Feb 2021Certificate SignedJun 2022Late, Apr 2023
SHREE MANGALP51800004380Andheri, Mumbai Suburban-Aug 2017CompletedDec 2017Late, Mar 2018
MANGAL VILLAS77 78 79 80 84 TUNGARLI LONAVALA DISTRICT PUNE6-CompletedDec 2015Sep 2015

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AMRAPALI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILE PARLE EAST6,700+ in Mumbai Suburban

2 kmAMRAPALICompleted 140Lapsed / revoked 66Other 145Dot size: filed unitsN

Filed coordinates, straight-line distance. 351 registered projects within 2 km.

Builder: MANGAL BUILDHOME PRIVATE LIMITED

MANGAL BUILDHOME PRIVATE LIMITED has 7 registrations on MahaRERA, including SHREE MANGAL and AMRAPALI. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that AMRAPALI shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if AMRAPALI is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AMRAPALI?

The registered promoter entity is MANGAL BUILDHOME PRIVATE LIMITED, a company as per the filing. Its CIN U45201MH2010PTC259841 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AMRAPALI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AMRAPALI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AMRAPALI?

The professionals named in the filing: Architect: V V & Associates; Engineer: DWIJEN BHATT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMRAPALI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMRAPALI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMRAPALI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.