Home / Browse projects / Raigarh, Maharashtra / AMBER NIRVANA

Registered No litigation declared Others project

AMBER NIRVANA

By VN BUILDTECH

RG-MH-19108 · RERA P52000078152 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
105 of 121Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

AMBER NIRVANA is a Others project by VN BUILDTECH in Raigarh, Maharashtra, registered with MahaRERA as P52000078152 on 25 Nov 2024. Possession is promised by 31 Dec 2027. 16 of the 121 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameAMBER NIRVANA
  • TypeOthers
  • Location
    • NERAL 18 M DP ROAD
    • NERAL
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000078152
  • ReraGenie IDRG-MH-19108

Builder

  • NameVN BUILDTECH
  • Entity typePartnership

Key dates

this monthRegisteredNov 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Nov 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed66 files

Current status

13%16 of 121 units booked

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA8859463
WING BNA8058058

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

WING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed89

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots89
Closed/Covered20
Open Space69
BuildingClosed/CoveredOpen SpaceTotal
WING A193453
WING B13536

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,592 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jul 2025

Approvals and building plan

Sanctioning authorityRAIGAD ZILLA PARISHAD ALIBAG
Permissible FSI5575.06
Proposed, not sanctioned5,575 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSARADA BHAVAN, SHIV MANDIR ROAD, AMBERNATH,, PINCODE - 421501

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE DESIGN INDIA GROUP
EngineerTHE DESIGN INDIA GROUP
Chartered AccountantAJITHA THAMPAN
PartnerRole in project
VN BUILDTECH-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: VN Builtech Form 1.pdf15 May 2026
Form 2File: VN Builtech Form 2.pdf15 May 2026
Form 3File: Form 3 VN Buildtech.pdf15 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked invetory v n buildtech.pdf15 May 2026
Form 1File: v n Buildtech form 1.pdf31 Jan 2026
Form 2File: Vn buildtech form 2.pdf31 Jan 2026
Form 3File: Form 3-VN Buildtech.pdf31 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory september quater .pdf31 Jan 2026
Form 1File: form 1 v n buildtech dec 25.pdf31 Jan 2026
Form 2File: v n buildtech form 2 dec 25.pdf31 Jan 2026
Form 3File: VN BUILDTECH form 3 dec 25.pdf31 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold december quater .pdf31 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 vn buildtech March 25.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: V N Buildtech final.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 vn buildtech changes 25.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: vn buildtech form 1 8 1 25.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 vn buildtech 31 Dec 24_compressed.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 vn buildtech 8 1 25.pdf29 Jan 2025
Proforma of Agreement for saleFile: AGREEMENT FOR SALE VN BUILDTECH 18 11 2024.pdf18 Nov 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE VN BUILDTECH 18 11 2024.pdf18 Nov 2024
Proforma of Allotment letterFile: FINAL ALLOTMENT LETTER VN BUILDTECH_compressed.pdf14 Nov 2024
Proforma of Agreement for saleFile: FINAL AGREEMENT FOR SALE VN BUILDTECH_compressed.pdf14 Nov 2024
Other - TechnicalFile: RERA STATEMENT V N BUILD TECH_compressed.pdf29 Oct 2024
Declaration about Commencement CertificateFile: declaration commencement certificate v n buildtech_compressed.pdf28 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: format A rera bank statement v n buildtech amber nivana_compressed.pdf28 Oct 2024
Other - TechnicalFile: v n buildtech built-up justification statement123_compressed.pdf28 Oct 2024
Other - TechnicalFile: RERA AREA STATEMENT V N BUILDTECH (2)_compressed.pdf28 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B V N BUILDTECH BANK.pdf28 Oct 2024
Other - TechnicalFile: annexure A.pdf23 Oct 2024
Declaration in FORM BFile: FORM B VN.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VN.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA VN.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VN.pdf22 Oct 2024
Other - LegalFile: CC CONFORMATION.pdf22 Oct 2024
Other - LegalFile: vn buildtech partnership deed.pdf22 Oct 2024
Other - LegalFile: 1 Other - Technical.pdf22 Oct 2024
Other - TechnicalFile: CC CONFORMATION.pdf22 Oct 2024
Other - TechnicalFile: Certificate Of Membership_V N Buildtech.pdf22 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DIPEN ORDER 30.pdf22 Oct 2024
Building plan approvalFile: BUILDING PLAN VN.pdf21 Oct 2024
Layout approvalFile: LAYOUT PLAN VN.pdf21 Oct 2024
Copy of the legal title reportFile: SEARCH TITLE VN.pdf21 Oct 2024
Copy of the legal title reportFile: FLOW TITLE.pdf21 Oct 2024
Details of encumbrances concerned to FinanceFile: no encumbrances concern to finance(2).pdf21 Oct 2024
Details of encumbrances concerned to FinanceFile: no encumbrances concern to legal.pdf21 Oct 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN VN.pdf21 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC COPY VN.pdf21 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN VN.pdf21 Oct 2024
Other - LegalFile: vn buildtech agreement-1-10.pdf21 Oct 2024
Other - LegalFile: vn buildtech agreement-11-20.pdf21 Oct 2024
Other - LegalFile: vn buildtech agreement-21-30.pdf21 Oct 2024
Other - LegalFile: vn buildtech agreement-31-35.pdf21 Oct 2024
Other - LegalFile: vn buildtech agreement-31-35.pdf21 Oct 2024
CERSAI detailsFile: cersai report.pdf21 Oct 2024
Deviation Report with respect to Allotment letterFile: no deviation allotment letter.pdf21 Oct 2024
Details of encumbrances concerned to LegalFile: no encumbrances concern to finance(2).pdf21 Oct 2024
Details of encumbrances concerned to LegalFile: no encumbrances concern to legal.pdf21 Oct 2024
Deviation Report with respect to model copy of AgreementFile: deviation letter of agreemanetv n buildtech.pdf21 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: order 39 jitesh salva.pdf21 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: order 39 ankit nagada.pdf21 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: order 39 Bhavesh dedhia.pdf21 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: order 39 Bhavesh dedhia.pdf21 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: order 39 laxmichand nagada.pdf21 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: order 39 Vasant nagda.pdf21 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: disclosure for secured finance letter.pdf21 Oct 2024
PAN CardFile: vn buildtech pan card .pdf14 Oct 2024

How this compares with Raigarh

13%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AMBER NIRVANA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NERAL5,900+ in Raigarh

2 kmAMBER NIRVANACompleted 60Lapsed / revoked 33Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 136 registered projects within 2 km.

Builder: VN BUILDTECH

VN BUILDTECH has 1 registration on MahaRERA, including AMBER NIRVANA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if AMBER NIRVANA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AMBER NIRVANA?

The registered promoter entity is VN BUILDTECH, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AMBER NIRVANA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AMBER NIRVANA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AMBER NIRVANA?

The professionals named in the filing: Architect: THE DESIGN INDIA GROUP; Engineer: THE DESIGN INDIA GROUP; Chartered Accountant: AJITHA THAMPAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMBER NIRVANA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMBER NIRVANA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMBER NIRVANA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.