Home / Browse projects / Palghar, Maharashtra / AMBARAM

Registered Litigation declared Residential / Group Housing project

AMBARAM

By Shree Varad Builders and Developers LLP

RG-MH-05385 · RERA P99000052895 · Last updated on MahaRERA portal: 16 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jul 2029Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

AMBARAM is a Residential / Group Housing project by Shree Varad Builders and Developers LLP in Palghar, Maharashtra, registered with MahaRERA as P99000052895 on 5 Oct 2023. Possession is promised by 12 Jul 2029.

At a glance

Project

  • NameAMBARAM
  • TypeResidential / Group Housing
  • Location
    • Bhabhola-Chulne Road
    • Chulne
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401202
  • Pincode401202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000052895
  • ReraGenie IDRG-MH-05385

Builder

  • NameShree Varad Builders and Developers LLP
  • Entity typePartnership
  • GSTIN27ACOFS4487P1ZY
  • PartnersSandeep Keshav Vartak, Rajesh Keshav Vartak

Key dates

this monthRegisteredOct 2023PromisedJul 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion12 Jul 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed108 files

Current status

20.3%Work done, per cost certificate

Figures as on 16 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AMBARAMNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

AMBARAM: 27% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed226

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots226
Closed/Covered226

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,073 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jun 2025
LandownerVillageDistrict
Shree Mahalaxmi EnterprisesVasai-Virar City (M Corp)Palghar
Abhay Yashwant ChaudhariVasai-Virar City (M Corp)Palghar
Pritam Prabhakar PatilVasai-Virar City (M Corp)Palghar
Rohit Narendra RautVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai-Virar City Municipal Corporation
Permissible FSI28877.1
Proposed, not sanctioned12,427 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchParnaka, Vasai West
Estimated costRs 62.50 cr
Cost incurredRs 12.66 cr
Work done20.26%
BuildingWingEstimatedIncurred
AMBARAMNARs 58.50 crRs 12.66 cr
-NARs 4.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectENCON
EngineerSanjay S Narang
EngineerNilesh Yadav
Chartered AccountantAnupam Umesh Jagtap
Chartered AccountantAkshay Manohar Mhatre
Chartered AccountantSIDDHANT MUKESH SHAH
PartnerRole in project
Shree Varad Builders and Developers LLP-

Litigation declared3

CaseCourtStatus
53/2018/2018Civil Court S D VasaiClosed
03/2020/2020Civil Court S D VasaiClosed
53/2018/2018Civil Court S D VasaiClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 12 Jul 2029

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf16 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf16 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf16 Jun 2026
Commencement certificateFile: EC SHREE VARAD BUILDERS DEVELOPERS LLP.pdf30 Apr 2026
Commencement certificateFile: Fire NOC Maharashtra Fire Services.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1 - RERA - Shree Varad - Q4.pdf30 Apr 2026
Withdrawal Update Form 2File: Form 2 - RERA - Shree Varad - Q4.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3 - Ambaram - Q4.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1 - Q3.pdf27 Jan 2026
Withdrawal Update Form 2File: Form 2 - Ambaram - 30092025.pdf27 Jan 2026
Withdrawal Update Form 3File: Form 3 - Q3.pdf27 Jan 2026
Withdrawal Update Form 1File: Form 1 - Ambaram - 30092025.pdf25 Oct 2025
Withdrawal Update Form 2File: Form 2 - Ambaram - 30092025.pdf25 Oct 2025
Withdrawal Update Form 3File: Form 3 - Ambaram - 30092025 - Uploaded.pdf25 Oct 2025
Form 5 (FY 2024-2025)File: SVBD_Form 5_FY24-25.pdf30 Sep 2025
Form 5 (FY 2023-2024)File: SVBD_Form 5_FY23-24.pdf18 Aug 2025
Withdrawal Update Form 1File: Form 1 - Ambaram - 30062025.pdf18 Jul 2025
Withdrawal Update Form 1File: Form 1 - Ambaram - 30062025.pdf18 Jul 2025
Withdrawal Update Form 1File: Form 1 - Ambaram - 30062025.pdf18 Jul 2025
Withdrawal Update Form 2File: Form 2 - Ambaram - 30062025.pdf18 Jul 2025
Withdrawal Update Form 2File: Form 2 - Ambaram - 30062025.pdf18 Jul 2025
Withdrawal Update Form 2File: Form 2 - Ambaram - 30062025.pdf18 Jul 2025
Withdrawal Update Form 3File: Form 3 - Ambaram - 30062025-Uploaded.pdf18 Jul 2025
Withdrawal Update Form 3File: Form 3 - Ambaram - 30062025-Uploaded.pdf18 Jul 2025
Withdrawal Update Form 3File: Form 3 - Ambaram - 30062025-Uploaded.pdf18 Jul 2025
Form 1File: Form 1 dtd 10-1-2024.pdf24 Jun 2025
Form 2File: Form 2 dtd 10-1-2024.pdf24 Jun 2025
Form 3File: Form 3 dtd 10-1-2024.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure sold-unsold inventory_Dec23.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure sold-unsold inventory_Mar24.pdf24 Jun 2025
Form 1File: Form 1 dtd 30-3-2024.pdf24 Jun 2025
Form 2File: Form 2 dtd 30-3-2024.pdf24 Jun 2025
Form 3File: Form 3 dtd 15-04-2024.pdf24 Jun 2025
Form 1File: Form 1 30-06-2024.pdf24 Jun 2025
Form 2File: Form 2 30-06-2024.pdf24 Jun 2025
Form 3File: Form3 dtd 15-07-2024.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure sold-unsold inventory_Jun24.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure sold-unsold inventory_Sep24.pdf24 Jun 2025
Form 1File: Form 1 30-09-2024.pdf24 Jun 2025
Form 2File: Form 2 30-09-2024.pdf24 Jun 2025
Form 3File: Form 3 dtd 30-09-2024.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure sold-unsold inventory_Dec24.pdf24 Jun 2025
Form 1File: Form 1 dtd 31-12-2024.pdf24 Jun 2025
Form 2File: Form 2 dtd 31-12-2024.pdf24 Jun 2025
Form 3File: Form 3 dtd 31-12-2024.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure sold-unsold inventory_Mar25.pdf24 Jun 2025
Form 1File: Form 1.pdf24 Jun 2025
Form 2File: Form 2.pdf24 Jun 2025
Form 3File: Form 3 dtd 31Mar25.pdf24 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 dtd 31-12-2024.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 dtd 31-12-2025.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 dtd 31-12-2024.pdf13 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SVBD_Form 5_FY23-24.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-2024.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-2024.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 dtd 15-07-2024.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-09-2024.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-2024.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 dtd 30-09-2024.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-2024.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-09-2024.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 dtd 15-07-2024.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 dtd 30-09-2024.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-2024.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-2024.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 dtd 30-3-2024.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 dtd 30-3-2024.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 dtd 15-04-2024.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 dtd 10-1-2024.pdf19 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 dtd 10-1-2024.pdf14 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 dtd 10-1-2024.pdf14 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: RERA email screenshot.pdf13 Sep 2023
Details of encumbrances concerned to FinanceFile: Legal litigations 21-8-2023.pdf21 Aug 2023
Details of encumbrances concerned to LegalFile: Legal litigations 21-8-2023.pdf21 Aug 2023
Other - FinanceFile: Form 3 Working.pdf14 Aug 2023
Layout approvalFile: scan_compressed.pdf10 Aug 2023
Building plan approvalFile: scan0126_compressed.pdf10 Aug 2023
Building plan approvalFile: scan0127_compressed.pdf10 Aug 2023
Building plan approvalFile: scan0128_compressed.pdf10 Aug 2023
Building plan approvalFile: scan0129_compressed.pdf10 Aug 2023

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AMBARAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chulne3,200+ in Palghar

2 kmAMBARAMCompleted 46Lapsed / revoked 26Other 57Dot size: filed unitsN

Filed coordinates, straight-line distance. 129 registered projects within 2 km.

Builder: Shree Varad Builders and Developers LLP

Shree Varad Builders and Developers LLP has 1 registration on MahaRERA, including AMBARAM. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if AMBARAM is delayed beyond 12 Jul 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AMBARAM?

The registered promoter entity is Shree Varad Builders and Developers LLP, a partnership as per the filing. Its GSTIN 27ACOFS4487P1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AMBARAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AMBARAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AMBARAM?

The professionals named in the filing: Architect: ENCON; Engineer: Sanjay S Narang; Engineer: Nilesh Yadav; Chartered Accountant: Anupam Umesh Jagtap; Chartered Accountant: Akshay Manohar Mhatre; Chartered Accountant: SIDDHANT MUKESH SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMBARAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMBARAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMBARAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.