ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / Amaresha

Registered No litigation declared Others project

Amaresha

By Inconel Developers & Builders Private Limited

RG-MH-54257 · RERA P51900046922 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
May 2029Possession promisedmoved 36 months from the original
1 of 11Construction stages donefurthest along: Basement (if any), 20%
44 of 47Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

Amaresha is a Others project by Inconel Developers & Builders Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900046922 on 20 Sep 2022. Possession is promised by 31 May 2029. The completion date has moved by 36 months from the original filing. 3 of the 47 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameAmaresha
  • TypeOthers
  • Location
    • Deshpande Road
    • Shivaji Park
    • GNorth-400028
    • Ward GNorth
    • Mumbai City
    • 400028
  • Pincode400028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900046922
  • ReraGenie IDRG-MH-54257

Builder

  • NameInconel Developers & Builders Private Limited
  • Entity typeCompany
  • DirectorsKiran Narendra Patkar, Kahini Kiran Patkar

Key dates

this monthRegisteredSep 2022First promiseMay 2026Revised toMay 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Sep 2022
  • Promised completion31 May 2029
  • Revised completionRevised to 31 May 2029 (originally 31 May 2026)
  • Buildings1 building record
  • Documents filed113 files

Current status

6%3 of 47 units booked
26.0%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AmareshaNA232244347

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 20%.

Amaresha: 11% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)20%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes30%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered20

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area390 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jun 2025
LandownerVillageDistrict
Marudhar EnterprisesABCD-400001Mumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2308.48
Proposed, not sanctioned1,936 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchoff Veer Savarkar Marg Mahim Mumbai
Estimated costRs 17.68 cr
Cost incurredRs 4.60 cr
Work done26.01%
BuildingWingEstimatedIncurred
AmareshaNARs 14.22 crRs 4.60 cr
-NARs 3.45 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAakar Architects
EngineerSanjay Ahire
Chartered AccountantShavarin K Nisar & Co
Chartered AccountantGujar And Kulkarni
PartnerRole in project
Inconel Developers & Builders Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03072621665May 2026 → May 2029

Reason as filed by the promoterAs prescribed under circular no 07/2019 dated 8 Feb 2019, the consent of 100% of the allottees-is enclosed herewith Construction of the proposed building was delayed due to certain issues of efstry and exit to the proposed project site. Firstly, access to D. V. Deshpande Marg was not available due to BMC carrying out concretization of the above mention road, for which period of more than 6 months was lost Subsequently, work was stalled for another period of 6 months due to concretization of Dadasaheb Rege Marg which connects to D. V Deshpande marg as movement of trucks supplying material was r

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2029

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Amaresha Form-1 June 2026.pdf20 Jul 2026
Withdrawal Update Form 2File: Amaresha Form-2 June 2026.pdf20 Jul 2026
Withdrawal Update Form 3File: Amaresha Form-3 June 2026.pdf20 Jul 2026
Withdrawal Update Form 1File: Amaresh Form 1 May 2026.pdf2 Jul 2026
Withdrawal Update Form 2File: Amaresha Form 2 May 2026.pdf2 Jul 2026
Withdrawal Update Form 3File: Amaresha Form 3 May 2026.pdf2 Jul 2026
Form 2A (FY 2023-2024)File: Form -2A -2024.pdf2 Jul 2026
Form 2A (FY 2025-2026)File: Form-2A-2026.pdf2 Jul 2026
Form 2A (FY 2024-2025)File: Form- 2A -2025.pdf2 Jul 2026
Withdrawal Update Form 1File: Amaresha Form-1 Mar 2026.pdf22 Jun 2026
Withdrawal Update Form 2File: Amaresha Form-2 Mar 2026.pdf22 Jun 2026
Withdrawal Update Form 3File: Amaresha Form-3 Mar 2026.pdf22 Jun 2026
Form 5 (FY 2024-2025)File: Form - 5 FY 2024-25.pdf22 Jun 2026
Form 5 (FY 2025-2026)File: Form - 5 FY 2025-26.pdf22 Jun 2026
Withdrawal Update Form 1File: Amaresha Form-1 Dec 2025.pdf12 Jun 2026
Withdrawal Update Form 2File: Amaresha Form-2 Dec 2025.pdf12 Jun 2026
Withdrawal Update Form 3File: Amaresha Form-3 Dec 2025.pdf12 Jun 2026
Withdrawal Update Form 1File: Amaresha Form-1 Sep 2025.pdf1 Jun 2026
Withdrawal Update Form 2File: Amaresha Form-2 Sep 2025.pdf1 Jun 2026
Withdrawal Update Form 3File: Amaresha Form-3 Sep 2025.pdf1 Jun 2026
Withdrawal Update Form 1File: Inconel Form-1 June 2025.pdf5 May 2026
Withdrawal Update Form 2File: Inconel Form-2 June 2025.pdf5 May 2026
Withdrawal Update Form 3File: Amaresha Form-3 June 2025.pdf5 May 2026
Form 1File: 202212_Ar.pdf6 Oct 2025
Form 2File: 202212_Er.pdf6 Oct 2025
Form 3File: 202212_CA.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: 202212_Sold.pdf6 Oct 2025
Form 1File: 202303_Ar.pdf6 Oct 2025
Form 2File: 202303_Er.pdf6 Oct 2025
Form 3File: 202303_CA.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: 202303_Sold.pdf6 Oct 2025
Form 1File: 202306_Ar.pdf6 Oct 2025
Form 2File: 202306_Er.pdf6 Oct 2025
Form 3File: 202306_CA.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: 202306_Sold.pdf6 Oct 2025
Form 1File: 202309_Ar.pdf6 Oct 2025
Form 2File: 202309_Er.pdf6 Oct 2025
Form 3File: 202309_CA.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: 202309_Sold.pdf6 Oct 2025
Form 1File: 202403_Ar.pdf6 Oct 2025
Form 2File: 202403_Er.pdf6 Oct 2025
Form 3File: 202403_CA.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: 202403_Sold.pdf6 Oct 2025
Form 1File: 202406_Ar.pdf6 Oct 2025
Form 2File: 202406_Er.pdf6 Oct 2025
Form 3File: 202406_CA.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: 202406_Sold.pdf6 Oct 2025
Form 1File: Inconel Form 1 _Arct.pdf6 Oct 2025
Form 2File: Inconel Form 2_Engr comprs.pdf6 Oct 2025
Form 3File: Inconel Form 3_CA.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: SoldUnsold Disclouser Dec24.pdf6 Oct 2025
Form 1File: Inconel Form 1 202503.pdf6 Oct 2025
Form 2File: Inconel Form 2 202503 Compres.pdf6 Oct 2025
Form 3File: Inconel Form 3 202503 Compres.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inconel Disclosure of SoldUnsold inventory 202503.pdf6 Oct 2025
Form 1File: Inconel Form 1 202409.pdf6 Oct 2025
Form 2File: Inconel Form 2 202409.pdf6 Oct 2025
Form 3File: Inconel Form 3 202409.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inconel Disclosure of Sold Unsold Inventory 202409.pdf6 Oct 2025
Form 5 (FY 2023-2024)File: Form 5 Revised 01072025 Signed.pdf1 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Inconel Arct Certi as on 31122024.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Inconel CA Cert as on 31122024.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclouser invent 31122024.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 202406_Ar.pdf21 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 202406_Er.pdf21 Jul 2024
Disclosure of sold/ booked inventoryFile: 202406_Sold.pdf21 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202406_CA.pdf21 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 202403_Ar.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 202403_Er.pdf30 May 2024
Disclosure of sold/ booked inventoryFile: 202212_Sold.pdf30 May 2024
Disclosure of sold/ booked inventoryFile: 202303_Sold.pdf30 May 2024
Disclosure of sold/ booked inventoryFile: 202306_Sold.pdf30 May 2024
Disclosure of sold/ booked inventoryFile: 202309_Sold.pdf30 May 2024
Disclosure of sold/ booked inventoryFile: 202403_Sold.pdf30 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202309_CA.pdf30 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202403_CA.pdf30 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 202309_Ar.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 202309_Er.pdf22 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-23_Inconel Form 2A.pdf22 Nov 2023

How this compares with Mumbai City

6%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 36 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Amaresha on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shivaji Park780+ in Mumbai City

2 kmAmareshaCompleted 86Lapsed / revoked 70Other 100Dot size: filed unitsN

Filed coordinates, straight-line distance. 256 registered projects within 2 km.

Builder: Inconel Developers & Builders Private Limited

Inconel Developers & Builders Private Limited has 1 registration on MahaRERA, including Amaresha. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Amaresha is delayed beyond 31 May 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Amaresha?

The registered promoter entity is Inconel Developers & Builders Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Amaresha?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Amaresha?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Amaresha?

The professionals named in the filing: Architect: Aakar Architects; Engineer: Sanjay Ahire; Chartered Accountant: Shavarin K Nisar & Co; Chartered Accountant: Gujar And Kulkarni. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Amaresha?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Amaresha. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Amaresha to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.