ALTAMIRA BY VTP LUXE PHASE 1
By MERCULUS CONSTRUWELL PRIVATE LIMITED
RG-MH-31472 · RERA P52100079807 · Last updated on MahaRERA portal: 18 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 5 complaints at MahaRERA
- Rs 1,360.00 crore secured on the land, in favour of INDIA SPECIAL SITUATION SCHEME III
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ALTAMIRA BY VTP LUXE PHASE 1 is a Residential / Group Housing project by MERCULUS CONSTRUWELL PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100079807 on 27 Mar 2025. Possession is promised by 31 Jul 2030. 338 of the 479 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete. 5 complaints are on record with the regulator.
At a glance
Project
- NameALTAMIRA BY VTP LUXE PHASE 1
- TypeResidential / Group Housing
- Location
- PANCHSHIL TOWERS ROAD
- UBALE NAGAR
- WAGHOLI
- Haveli
- Pune
- 412207
- Pincode412207
- RERA no.P52100079807
- ReraGenie IDRG-MH-31472
Builder
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Mar 2025
- Promised completion31 Jul 2030
- Revised completionNone
- Buildings3 building records
- Documents filed81 files
Current status
Figures as on 18 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER 2 | NA | 38 | 35 | 204 | 0 | 204 |
| TOWER 3 | NA | 38 | 35 | 137 | 0 | 137 |
| TOWER 4 | NA | 38 | 35 | 138 | 0 | 138 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.
TOWER 20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 40%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANA CONSORTIUM PVT LTD |
| Engineer | SACHIN BHATKANDE |
| Engineer | G A BHILARE CONSULTANTS PVT LTD |
| Engineer | GIRISH AWINASHE |
| Chartered Accountant | SAC & CO LLP |
| Chartered Accountant | Priyanka Chordiya & Associates |
| Partner | Role in project |
|---|---|
| MERCULUS CONSTRUWELL PRIVATE LIMITED | - |
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12601092 | Rajat Chaudhary | MERCULUS CONSTRUWELL PRIVATE LIMITED | 27/02/2026 |
| CC12501983 | manish borse | MERCULUS CONSTRUWELL PRIVATE LIMITED | 18/06/2025 |
| CC12602036 | Rohit Bairagi | MERCULUS CONSTRUWELL PRIVATE LIMITED | 06/04/2026 |
| CC12603368 | MERCULUS CONSTRUWELL PRIVATE LIMITED | HARISCHANDRA DUBEY | 02/06/2026 |
| CC12603486 | MERCULUS CONSTRUWELL PRIVATE LIMITED | RUBANA BANO | 06/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Mar 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jul 2030
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A-Altamira phase 1.pdf | 18 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 ALtamira Ph 1 07042026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Altamira - Phase 1.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 ALTAMIRA 30032026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 Altamira Phase 1 07012026.pdf | 16 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 Altamira Phase 1 07012026.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 ALTAMIRA PHASE 1 31122025.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 ALTAMIRA PHASE 1 31122025.pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 ALTAMIRA PAHSE 1 31122025.pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 ALTAMIRA PAHSE 1 31122025.pdf | 16 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 ALTAMIRA PHASE 1 30092025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 ALtamira 30092025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 ALTAMIRA BY VTP LUXE PHASE 1.pdf | 17 Oct 2025 |
| Form 5 (FY 2024-2025)File: FORM 5- ALTAMIRA PH 1.pdf | 27 Aug 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A VTP ALTAMIRA.pdf | 27 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized.pdf | 26 Mar 2025 |
| Other - FinanceFile: Revised CERSAI Declaration 25032025.pdf | 25 Mar 2025 |
| Other - TechnicalFile: Gmail.pdf | 25 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Revised Disclosure Promoter Letterhead 25032025.pdf | 25 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Revised Disclosure CA Letterhead 25032025.pdf | 25 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Altair 3_Form 2 WITH STAMP.pdf | 20 Mar 2025 |
| Other - TechnicalFile: Revised Pro Rata Area Clarification.pdf | 20 Mar 2025 |
| Deviation Report with respect to model copy of AgreementFile: Final Deviation WRT AFS 20032025.pdf | 20 Mar 2025 |
| Proforma of Agreement for saleFile: Final AFS Altair 3 19032025.pdf | 20 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A 19030225.pdf | 19 Mar 2025 |
| Other - TechnicalFile: Annexure A.pdf | 18 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B FINAL 18032025.pdf | 18 Mar 2025 |
| Layout approvalFile: ALTAIR 3 - LAYOUT HIGHLIGHT.pdf | 12 Mar 2025 |
| Building plan approvalFile: 03-14 TOWER 2.pdf | 12 Mar 2025 |
| Building plan approvalFile: 08-14 TOWER 3.pdf | 12 Mar 2025 |
| Building plan approvalFile: 11-14 TOWER 4.pdf | 12 Mar 2025 |
| Building plan approvalFile: 02-14 Parkinglayout plan.pdf | 12 Mar 2025 |
| Building plan approvalFile: 04-14.pdf | 12 Mar 2025 |
| Building plan approvalFile: 05-14.pdf | 12 Mar 2025 |
| Building plan approvalFile: 06-14.pdf | 12 Mar 2025 |
| Building plan approvalFile: 07-14.pdf | 12 Mar 2025 |
| Building plan approvalFile: 09-14.pdf | 12 Mar 2025 |
| Building plan approvalFile: 10-14.pdf | 12 Mar 2025 |
| Building plan approvalFile: 12-14.pdf | 12 Mar 2025 |
| Building plan approvalFile: 13-14.pdf | 12 Mar 2025 |
| Building plan approvalFile: 14-14.pdf | 12 Mar 2025 |
| PAN CardFile: PAN Merculous.pdf | 12 Mar 2025 |
| Copy of the legal title reportFile: TSR Altair 3.pdf | 12 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUM WRT FINANCE.pdf | 12 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUM WRT LEGAL.pdf | 12 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: ALTAIR 3 - LAYOUT HIGHLIGHT.pdf | 12 Mar 2025 |
| Proforma of Allotment letterFile: Final Allotment Letter.pdf | 12 Mar 2025 |
| Declaration in FORM BFile: FORM B Altair 3.pdf | 12 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Altair 3.pdf | 12 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: MW R-17 Commencement certificate.pdf | 12 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 02-14 Parkinglayout plan.pdf | 12 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 14-14.pdf | 12 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 13-14.pdf | 12 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 12-14.pdf | 12 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 10-14.pdf | 12 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 09-14.pdf | 12 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 07-14.pdf | 12 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 06-14.pdf | 12 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 05-14.pdf | 12 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 04-14.pdf | 12 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 11-14 TOWER 4.pdf | 12 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 08-14 TOWER 3.pdf | 12 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 03-14 TOWER 2.pdf | 12 Mar 2025 |
| Other - LegalFile: 12860-2024_POA_11zon.pdf | 12 Mar 2025 |
| Other - LegalFile: वाघोली_1255_36_Satbara (1).pdf | 12 Mar 2025 |
| Other - LegalFile: वाघोली_1255_38_Satbara.pdf | 12 Mar 2025 |
| Other - LegalFile: वाघोली_1276_30_Satbara (1).pdf | 12 Mar 2025 |
| Other - LegalFile: 12859-2024_ Conveyance Deed_11zon.pdf | 12 Mar 2025 |
| Other - LegalFile: 5470_2025 Deed Of Conveyance_compressed_11zon.pdf | 12 Mar 2025 |
| Other - LegalFile: वाघोली_1255_34_Satbara.pdf | 12 Mar 2025 |
| Declaration about Commencement CertificateFile: CC DECLARATION.pdf | 12 Mar 2025 |
| CERSAI detailsFile: CERSAI SEARCH REPORT ALTAIR PHASE 3-1.pdf | 12 Mar 2025 |
| Deviation Report with respect to Allotment letterFile: Final Deviation WRT Allottment letter.pdf | 12 Mar 2025 |
| Details of encumbrances concerned to LegalFile: ENCUM WRT FINANCE.pdf | 12 Mar 2025 |
| Details of encumbrances concerned to LegalFile: ENCUM WRT LEGAL.pdf | 12 Mar 2025 |
| Other - TechnicalFile: PLOT DECLARATION.pdf | 12 Mar 2025 |
| Other - TechnicalFile: MCPL _CTC Maharera Regn VTP Altair.pdf | 12 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE- AYUSH.pdf | 12 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE-SUMIT.pdf | 12 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE- BVP.pdf | 12 Mar 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ALTAMIRA BY VTP LUXE PHASE 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near UBALE NAGAR13,700+ in Pune
Yashwin Enchante Phase 2
Vilas Javdekar Infinitee Developers Pvt. L
Godrej Greens
DREAM WORLD LANDMARKS LLP
Yashwin Enchante Phase 1
Vilas Javdekar Infinitee Developers Pvt. L
Kohinoor Kaleido
Intofinity Promoters Private Limited
VIJAY VIHAR
COL. RPS RAWAT
FLAMANTE BY VTP LUXE PHASE 1
INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMI
Builder: MERCULUS CONSTRUWELL PRIVATE LIMITED
MERCULUS CONSTRUWELL PRIVATE LIMITED has 2 registrations on MahaRERA, including ALTAMIRA BY VTP LUXE PHASE 1 and ALTAMIRA BY VTP LUXE PHASE 2. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if ALTAMIRA BY VTP LUXE PHASE 1 is delayed beyond 31 Jul 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ALTAMIRA BY VTP LUXE PHASE 1?
The registered promoter entity is MERCULUS CONSTRUWELL PRIVATE LIMITED, a company as per the filing. Its CIN U68100PN2023PTC222536 and GSTIN 27AARCM1074A1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ALTAMIRA BY VTP LUXE PHASE 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ALTAMIRA BY VTP LUXE PHASE 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ALTAMIRA BY VTP LUXE PHASE 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ALTAMIRA BY VTP LUXE PHASE 1?
The professionals named in the filing: Architect: ANA CONSORTIUM PVT LTD; Engineer: SACHIN BHATKANDE; Engineer: G A BHILARE CONSULTANTS PVT LTD; Engineer: GIRISH AWINASHE; Chartered Accountant: SAC & CO LLP; Chartered Accountant: Priyanka Chordiya & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ALTAMIRA BY VTP LUXE PHASE 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback