Aldea Annexo - C2
RG-MH-11091 · RERA P52100002665 · Last updated on MahaRERA portal: 22 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Aldea Annexo - C2 is a Others project by Puranik Builders Limited in Pune, Maharashtra, registered with MahaRERA as P52100002665 on 2 Aug 2017. Possession is promised by 30 Dec 2026. 1 complaint is on record with the regulator.
At a glance
Project
- NameAldea Annexo - C2
- TypeOthers
- Location
- Baner Road
- Near Puraniks Aldea Espanola
- Mahalunge
- Mulshi
- Pune
- 411045
- Pincode411045
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100002665
- ReraGenie IDRG-MH-11091
Builder
- NamePuranik Builders Limited
- Entity typeCompany
- CINU99999MH1990PLC056451
- GSTIN27AABCP0109R1Z9
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorShailesh Gopal Puranik
- DirectorsYogesh Govind Puranik, Shrikant Govind Puranik, Nilesh Ravindra Puranik
- Other registrations19 more →
- Completed5 of 20
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Aug 2017
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed95 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C2 - Marbella | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
C2 - Marbella: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed42
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/S. B.U. BHandari Ventures | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Crystal Arch |
| Architect | Vastushilpa Associates |
| Engineer | Sagar Abnave |
| Chartered Accountant | VMD & Co |
| Chartered Accountant | HDO & Associates |
| Chartered Accountant | VMD and Company |
| Partner | Role in project |
|---|---|
| Puranik Builders Limited | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000269375 | Pushpa Zhalamchand Jain | Puranik Builders Limited | 31/08/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Dec 2024
Documents filed95
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Architects Certificate - Annexo C2 31032025.pdf | 22 Jun 2026 |
| Form 2File: Form 2 Engineers Certificate_Annexo_C2 - 31032025.pdf | 22 Jun 2026 |
| Form 3File: CA_Certificates- Annexo_C2 - 31032025.pdf | 22 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Aldea Annexo C2 Jan -March 25.pdf | 22 Jun 2026 |
| Form 1File: Architects Certificate - Annexo C2 30062025.pdf | 22 Jun 2026 |
| Form 2File: Form 2 Engineers Certificate_Annexo_C2 - 08082025.pdf | 22 Jun 2026 |
| Form 3File: Form 3Annexo_C2_30062025.pdf | 22 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Aldea Annexo C2 April-June 25.pdf | 22 Jun 2026 |
| Form 1File: Architects Certificate - Annexo C2 30092025.pdf | 22 Jun 2026 |
| Form 2File: Form 2 Engineers Certificate_Annexo_C2 - 08082025.pdf | 22 Jun 2026 |
| Form 3File: CA_Certificates_-_Annexo_C2_30092025.pdf | 22 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Aldea Annnexo C2 July -Sep 25.pdf | 22 Jun 2026 |
| Form 1File: Architects Certificate - Annexo C2 31122025.pdf | 22 Jun 2026 |
| Form 2File: Form 2 Engineers Certificate_Annexo_C2 - 31122025.pdf | 22 Jun 2026 |
| Form 3File: CA_Certificates_-_Annexo_C2 31122025.pdf | 22 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Aldea Annexo C2-Oct-Dec 25.pdf | 22 Jun 2026 |
| Form 1File: Architects Certificate - Annexo C2 31032026.pdf | 22 Jun 2026 |
| Form 2File: Form 2 Engineers Certificate_Annexo_C2 - 31032026.pdf | 22 Jun 2026 |
| Form 3File: Form 3.pdf | 22 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Sales -Aldea Annexo C2 Jan -March 26.pdf | 22 Jun 2026 |
| Form 5 (FY 2024-2025)File: Rera Form 5 - Aldea Annexo C2 - sign.pdf | 29 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: New FORM 1 architect- Aldea Annexo Ph IV - C2 Bldg -30092024.pdf | 17 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate -C2.pdf | 17 Dec 2024 |
| Certificates of CA (Form 3)File: Aldea Annexo C2.pdf | 17 Dec 2024 |
| Certificates of CA (Form 3)File: CA_Certificates_-_Annexo_C2_till_30092024.pdf | 17 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_Annexo_C2 - 30062024.pdf | 17 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_Annexo_C2 - 30092024.pdf | 17 Dec 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: society certificate C2 Dt 22022024.pdf | 17 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate Anexo C2 Building.pdf | 17 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Annexo C2 _23-24.pdf | 17 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Aldea Annexo C2 - signed.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Aldea Annexo C2 - signed.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aldea Annexo- C2 - P51200002665.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: Aldea Annexo C2.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2024-03-31 Architects Certificate - Annexo C2.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_Annexo_C2.pdf | 26 Apr 2024 |
| Certificates of CA (Form 3)File: Annexo C2.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: New FORM 1 architect- Aldea Annexo Ph IV - C2 Bldg.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Annexo C2 31122023.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: Annexo C2.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_AnnexoC2 30092023.pdf | 14 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aldea Annexo Ph IV - C2 Bldg -30092023.pdf | 16 Nov 2023 |
| Certificates of CA (Form 3)File: Annexo C2 83.pdf | 16 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5 Annexo C2 - signed final.pdf | 30 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A- Annexo C2 21-22.pdf | 8 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aldea Annexo Ph IV C 30062023.pdf | 7 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Annexo C2 300623.pdf | 7 Aug 2023 |
| Certificates of CA (Form 3)File: HDO - ANNEXO C2 - 024.pdf | 7 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-Annexo C2 22 23.PDF | 10 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aldea Annexo Ph IV - C2 Bldg -31032023.pdf | 2 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_Annexo_C2 - 310323.pdf | 2 May 2023 |
| Certificates of CA (Form 3)File: Annexo C2_compressed.pdf | 2 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 architect- Aldea Annexo C2 Bldg 31122022.pdf | 25 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Annexo C2 31122022.pdf | 25 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Aldea Annexa-C2.pdf | 25 Mar 2023 |
| Certificates of CA (Form 3)File: Annexo C2.pdf | 31 Jan 2023 |
| Certificates of CA (Form 3)File: Annexo C2 Certificate.pdf | 12 Jan 2023 |
| Certificates of CA (Form 3)File: Annexo C2 31032019.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Annexo C2 30619.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificates - Annexo C2.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificates - Annexo C2.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Annexo C2 March 20.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Annexo C2 June 20.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificates - Annexo C2.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificates -Annexo C2.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Annexo C2.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Annexo C2.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificates - Annexo C2.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificates Annexo C2.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Annexo C2.pdf | 11 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aldea Annexo C2.pdf | 4 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: New FORM 1 architect Aldea Annexo C2 Bldg.pdf | 4 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA ARCH CERTIFICATE Annexo C2.pdf | 4 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Annexo C2.pdf | 4 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Annexo C2 30092022.pdf | 4 Jan 2023 |
| Certificates of CA (Form 3)File: ANNEXO C2.PDF | 4 Jan 2023 |
| Certificates of CA (Form 3)File: Annexo C2.pdf | 4 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annexo C2.pdf | 4 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annexo C2.pdf | 1 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Aldea Annexo C2.pdf | 30 Sep 2021 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Hometown Part C | Kasarvadavali Ghodbunder Road Thane west 400615 | 108 | Completed | Dec 2016 | Late, Apr 2017 |
| Aldea Annexo | Aldea Annexo Next to Hotel Vits Nr Balewadi Stadium Mhalunge Pune 411045 | 129 | Completed | Dec 2016 | Late, Apr 2017 |
| Hometown Part B | Kasarvadavali Ghodbunder Road Thane west 400615 | 159 | Completed | Aug 2014 | Late, Jan 2015 |
| Hometown Part A | Kasarvadavali Ghodbunder Road Thane west 400615 | 176 | Completed | Jun 2013 | Late, Nov 2013 |
| Puranik City Part A | Kasarvadavali Ghodbunder Road Thane west 400615 | 108 | Completed | Dec 2012 | Late, Feb 2013 |
| Puranik City Part B | Kasarvadavali Ghodbunder Road Thane west 400615 | 80 | Completed | Dec 2011 | Late, Apr 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 19 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 95 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Aldea Annexo - C2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near Puraniks Aldea Espanola13,700+ in Pune
Filed coordinates, straight-line distance. 296 registered projects within 2 km.
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: Puranik Builders Limited
Puranik Builders Limited has 20 registrations on MahaRERA, including Aldea Annexo -C1 and Rumahbali Phase 2. Its filings disclose 6 earlier MahaRERA projects: declares 0 of 6 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Aldea Annexo - C2 is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Aldea Annexo - C2?
The registered promoter entity is Puranik Builders Limited, a company as per the filing. Its CIN U99999MH1990PLC056451 and GSTIN 27AABCP0109R1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Aldea Annexo - C2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Aldea Annexo - C2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Aldea Annexo - C2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Aldea Annexo - C2?
The professionals named in the filing: Architect: Crystal Arch; Architect: Vastushilpa Associates; Engineer: Sagar Abnave; Chartered Accountant: VMD & Co; Chartered Accountant: HDO & Associates; Chartered Accountant: VMD and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Aldea Annexo - C2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback