ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Alcon Mellows Wing B

Registered No litigation declared Others project

Alcon Mellows Wing B

By Alcon

RG-MH-05627 · RERA P52100076590 · Last updated on MahaRERA portal: 3 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 85%
8 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

Alcon Mellows Wing B is a Others project by Alcon in Pune, Maharashtra, registered with MahaRERA as P52100076590 on 18 Jun 2024. Possession is promised by 31 Dec 2027. 10 of the 18 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameAlcon Mellows Wing B
  • TypeOthers
  • Location
    • Sr. No. 51
    • Hissa No. 1/1A(P)
    • Kondhwa- Budruk
    • Pune- 411048.
    • Kondhwa- Budruk
    • kondhwa BK
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100076590
  • ReraGenie IDRG-MH-05627

Builder

  • NameAlcon
  • Entity typePartnership
  • PartnersVivek Sunil Agarwal, Vipul Sunil Agarwal
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredJun 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Jun 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed80 files

Current status

56%10 of 18 units booked
82.8%Work done, per cost certificate

Figures as on 3 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Alcon Mellows Wing BNA8018018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.

Alcon Mellows Wing B: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 3 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered6
Open Space14

Land and ownership29

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area207 sq m
Land owned byThe promoter, with other names on the file
Named landowners29
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Nov 2025
LandownerVillageDistrict
Mr Sopan Vitthal Tilekarkondhwa BKPune
Mrs Hausabai Sopan Tilekarkondhwa BKPune
Mr Ratan Sopan Tilekarkondhwa BKPune
Mrs Sunita Ratan Tilekarkondhwa BKPune
Mr mahesh Ratan Tilekarkondhwa BKPune
Mr Uttam Sopan Tilekarkondhwa BKPune
Mrs Baby Uttam Tilekarkondhwa BKPune
Miss Shraddha Uttam Tilekarkondhwa BKPune
Mr Tejas Uttam Tilekarkondhwa BKPune
Mr Ram Sopan Tilekarkondhwa BKPune
Miss Harshada Ram Tilekarkondhwa BKPune
Mr Kunal Ram Tilekarkondhwa BKPune
Mrs Savita Ram Tilekarkondhwa BKPune
Mr Laxman Sopan Tilekarkondhwa BKPune
Miss Diksha Laxman Tilekarkondhwa BKPune
Miss Pratiksha Laxman TIlekarkondhwa BKPune
Mr Prajwal Laxman Tilekarkondhwa BKPune
Mrs Deepali LaxmanTilekarkondhwa BKPune
Mrs Sangeeta Nandkumar Gaikwadkondhwa BKPune
Mrs Mangal Rajaram Holekondhwa BKPune
Mr Pandurang Vitthal Tilekarkondhwa BKPune
Mrs Rukmini Pandurang Tilekarkondhwa BKPune
Mr Haresh Pandurang Tilekarkondhwa BKPune
Miss Maithe;li Haresh Tilekarkondhwa BKPune
Mrs Sonali Haresh Tilekarkondhwa BKPune
Mrs Surekha Jalinder Waghkondhwa BKPune
Mrs Nanda Sharad Jagtapkondhwa BKPune
Mrs Vandana Sunil Dangmalikondhwa BKPune
Mrs Vaishali Subhash Gorekondhwa BKPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI1518.58
Proposed, not sanctioned1,519 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch2-A,ARORA TOWERS, 9 MOLEDINA ROAD,PUNE CAMP, Pune-411001
Estimated costRs 4.49 cr
Cost incurredRs 3.72 cr
Work done82.81%
BuildingWingEstimatedIncurred
Alcon Mellows Wing BNARs 3.65 crRs 2.92 cr
-NARs 84.21 lakhRs 80.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Vivek Agarwal
EngineerRohinee Badgujar
EngineerShabir Sayyed
Chartered AccountantCA Pravin Pise and Associates
Chartered AccountantVaibhav Bhise
PartnerRole in project
Alcon-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Jun 2026.pdf3 Jul 2026
Withdrawal Update Form 2File: Form 2 Jun 2026.pdf3 Jul 2026
Withdrawal Update Form 3File: Form 3 Jun 2026_compressed.pdf3 Jul 2026
Withdrawal Update Form 1File: Architect certificate_11zon (1).pdf6 Apr 2026
Withdrawal Update Form 2File: Form 2 engineers cert..pdf6 Apr 2026
Withdrawal Update Form 3File: c a pravin pise_compressed.pdf6 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A engineers.pdf4 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf6 Jan 2026
Withdrawal Update Form 2File: From 2.pdf6 Jan 2026
Withdrawal Update Form 3File: CA Form 3_compressed.pdf6 Jan 2026
Form 2A (FY 2024-2025)File: 2A Alcon Mellows wing 24-25.pdf3 Dec 2025
Form 5 (FY 2024-2025)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf3 Dec 2025
Form 1File: Alcon melows sep 2025 Form 1.pdf10 Oct 2025
Form 2File: Alcon melows sep 2025 Form 2.pdf10 Oct 2025
Form 3File: Alcon melows sep 2025 Form 3_compressed.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Alcon melows sep 2025 Sold Unsold.pdf10 Oct 2025
Form 1File: Architect Certificate (9).pdf12 Jul 2025
Form 2File: Alcon Mellows July 2025 RCC ENG (1).pdf12 Jul 2025
Form 3File: FORM-3 (ALCON).pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold (4).pdf12 Jul 2025
Form 1File: Form 1.pdf4 Jun 2025
Form 2File: Form 2.pdf4 Jun 2025
Form 3File: Form 3.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf4 Jun 2025
Form 1File: Form 1.pdf4 Jun 2025
Form 2File: Form 2.pdf4 Jun 2025
Form 3File: Form 3.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf4 Jun 2025
Form 1File: Form 1.pdf4 Jun 2025
Form 2File: Form 2.pdf4 Jun 2025
Form 3File: Form 3.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf4 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate -16-04-2025 (2)_compressed (1).pdf18 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FY 24-25 (1)_compressed (1).pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA (1).pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA (1).pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineer certificate.pdf12 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Site superviser certificate.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Site superviser certificate.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1- 04-01-2025_compressed (1).pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate form 2 - 07-01-2025_compressed.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 upload.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory - 04-01-2025.pdf7 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: engineer certificate form 2a - 04-01-2025.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate-7-10-2024 (1)_11zon.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 (1)_11zon.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Scan.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner Certificate_11zon.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: sold unsold-7-10-2024 (1).pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-7-10-2024 (6).pdf19 Oct 2024
Other - TechnicalFile: Form 50 Final.pdf24 May 2024
CERSAI detailsFile: cresai declaration 2024-05-16.pdf16 May 2024
Copy of the legal title reportFile: Alcon Legal.pdf15 May 2024
Commencement Certificates / NA Order for plotted developmentFile: DocScanner 15-May-2024 1-28 pm.pdf15 May 2024
Copy of the legal title reportFile: Format A- Alcon Mealows - (1).pdf10 May 2024
Building plan approvalFile: 21 parking statment.pdf12 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 21 parking statment.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate wing B 2024-03-22.pdf12 Apr 2024
Layout approvalFile: Main Layout Highlighted_rotated (1)_11zon.pdf10 Apr 2024
Building plan approvalFile: B Wing Elevation.pdf10 Apr 2024
Layout approvalFile: iOd and plinth certificate 2024-04-11.pdf10 Apr 2024
PAN CardFile: Alcon PAN.pdf10 Apr 2024
Details of encumbrances concerned to FinanceFile: encumbrances 2024-04-02.pdf10 Apr 2024
Details of encumbrances concerned to LegalFile: encumbrances 2024-04-02.pdf10 Apr 2024
Copy of Layout Approval (in case of layout)File: Main Layout Highlighted_rotated (1)_11zon.pdf10 Apr 2024
Copy of Layout Approval (in case of layout)File: iOd and plinth certificate 2024-04-11.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: B Wing Elevation.pdf10 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: 7 CC 2023 B wing.pdf10 Apr 2024
Declaration about Commencement CertificateFile: Alcon CC.pdf10 Apr 2024
Declaration in FORM BFile: promoter form b affidavite.pdf10 Apr 2024
CERSAI detailsFile: _CERSAI_Search_Report.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 (12)_11zon.pdf10 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure A vivek 2024-04-02.pdf10 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure A vipul 2024-04-02.pdf10 Apr 2024
Proforma of Allotment letterFile: 8 Model Form of Allotment Letter.pdf10 Apr 2024
Proforma of Agreement for saleFile: Agreement to sale Alcon B wing Final.pdf10 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Decleration .pdf10 Apr 2024
Deviation Report with respect to Allotment letterFile: deviation allotment 2024-04-02.pdf10 Apr 2024
Deviation Report with respect to model copy of AgreementFile: ilovepdf_merged (44) (1).pdf10 Apr 2024

How this compares with Pune

56%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Alcon Mellows Wing B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kondhwa- Budruk13,700+ in Pune

2 kmAlcon Mellows Wing BCompleted 66Lapsed / revoked 42Other 55Dot size: filed unitsN

Filed coordinates, straight-line distance. 163 registered projects within 2 km.

Builder: Alcon

ALCON has 4 registrations on MahaRERA, including ALCON MELLOWS and ALCON RITO. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Alcon Mellows Wing B is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Alcon Mellows Wing B?

The registered promoter entity is Alcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Alcon Mellows Wing B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Alcon Mellows Wing B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Alcon Mellows Wing B?

The professionals named in the filing: Architect: Ar Vivek Agarwal; Engineer: Rohinee Badgujar; Engineer: Shabir Sayyed; Chartered Accountant: CA Pravin Pise and Associates; Chartered Accountant: Vaibhav Bhise. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Alcon Mellows Wing B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Alcon Mellows Wing B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Alcon Mellows Wing B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.