Home / Browse projects / Nashik, Maharashtra / AL SAFA HEIGHTS

Registered No litigation declared Residential / Group Housing project

AL SAFA HEIGHTS

By MUZAMMIL FARIDODDIN KHATIB

RG-MH-43496 · RERA P51600055384 · Last updated on MahaRERA portal: 14 Feb 2025

Source: official MahaRERA filing

Red flags

  • Possession 2 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Aug 2026Possession promised2 months past this date
4 of 11Construction stages donefurthest along: Staircases, 90%
0Complaints at MahaRERAon this registration
Jump to the 40 documents Report an error

AL SAFA HEIGHTS is a Residential / Group Housing project by MUZAMMIL FARIDODDIN KHATIB in Nashik, Maharashtra, registered with MahaRERA as P51600055384 on 22 Mar 2024. Possession was promised by 31 Aug 2026 and is now 2 months past that date.

At a glance

Project

  • NameAL SAFA HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • PAKHAL ROAD
    • JAY NAGAR
    • Nashik
    • 422011
  • Pincode422011
  • RERA no.P51600055384
  • ReraGenie IDRG-MH-43496

Builder

  • NameMUZAMMIL FARIDODDIN KHATIB
  • Entity typeIndividual

Key dates

2 months past promisethis monthRegisteredMar 2024PromisedAug 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Mar 2024
  • Promised completion31 Aug 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed40 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AL SAFA HEIGHTSNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

AL SAFA HEIGHTS: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 14 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes40%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed65

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots65
Open Space65

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area731 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1431.73
Proposed, not sanctioned1,432 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDWARKA NASHIK

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKAPIL THAKKAR AND ASSOCIATES
EngineerDELTACOM STRUCTURAL CONSULTANTS
Chartered AccountantP R DESHPANDE & CO CHARTERED ACCOUNTANTS
PartnerRole in project
MUZAMMIL FARIDODDIN KHATIB-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed40

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 24.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 24.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 24.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 24.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Khatib buildcon March 24.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Khatib buildcon June 24.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Khatib buildcon Sept 24.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Khatib buildcon Dec 24.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 24.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 24.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 24.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 24.pdf14 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf14 Feb 2025
Details of encumbrances concerned to FinanceFile: No encumbrance.pdf2 Dec 2023
Details of encumbrances concerned to LegalFile: No encumbrance.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-New_compressed.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-New_compressed.pdf2 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank declaration.pdf2 Dec 2023
Other - FinanceFile: FINANCE ENCUMBARANCE.pdf2 Dec 2023
Details of encumbrances concerned to FinanceFile: No encumbrance.pdf23 Oct 2023
Details of encumbrances concerned to LegalFile: No encumbrance.pdf23 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Extension.pdf23 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf23 Oct 2023
Other - LegalFile: Sale Deed-COMPRESSED.pdf23 Oct 2023
CERSAI detailsFile: cersai.pdf15 Sep 2023
Proforma of Agreement for saleFile: Agreement to Sale_compressed.pdf15 Sep 2023
Layout approvalFile: LAND LAYOUT.pdf11 Aug 2023
Building plan approvalFile: BUILDING PLAN.pdf11 Aug 2023
Copy of Layout Approval (in case of layout)File: LAND LAYOUT.pdf11 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf11 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement.pdf11 Aug 2023
Declaration about Commencement CertificateFile: Muzammil.pdf11 Aug 2023
Declaration in FORM BFile: Form B- Builder.pdf11 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST.pdf11 Aug 2023
Proforma of Allotment letterFile: Allotment Letter_compressed.pdf11 Aug 2023
Deviation Report with respect to Allotment letterFile: No deviation - Allotment letter.pdf11 Aug 2023
Deviation Report with respect to model copy of AgreementFile: No deviation - ATS.pdf11 Aug 2023
PAN CardFile: PAN.pdf4 Aug 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf4 Aug 2023

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AL SAFA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JAY NAGAR4,100+ in Nashik

Builder: MUZAMMIL FARIDODDIN KHATIB

MUZAMMIL FARIDODDIN KHATIB has 1 registration on MahaRERA, including AL SAFA HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if AL SAFA HEIGHTS is delayed beyond 31 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AL SAFA HEIGHTS?

The registered promoter entity is MUZAMMIL FARIDODDIN KHATIB, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AL SAFA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AL SAFA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AL SAFA HEIGHTS?

The professionals named in the filing: Architect: KAPIL THAKKAR AND ASSOCIATES; Engineer: DELTACOM STRUCTURAL CONSULTANTS; Chartered Accountant: P R DESHPANDE & CO CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AL SAFA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AL SAFA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AL SAFA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.