Akshardham Phase 2
RG-MH-55014 · RERA P52100052307 · Last updated on MahaRERA portal: 29 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Akshardham Phase 2 is a Residential / Group Housing project by Shreyan Ventures in Pune, Maharashtra, registered with MahaRERA as P52100052307 on 9 Aug 2023. Possession is promised by 30 Dec 2026. 56 of the 100 units on this registration are recorded sold or booked, and 11 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameAkshardham Phase 2
- TypeResidential / Group Housing
- Location
- Kondhwa Khurd
- Pune
- Haveli
- 411048
- Pincode411048
- RERA no.P52100052307
- ReraGenie IDRG-MH-55014
Builder
- NameShreyan Ventures
- Entity typeOthers
- Named personsMohit Dvelopers, Shreyan Infra and Power LLP
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Aug 2023
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed89 files
Current status
Figures as on 29 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B1 | NA | 14 | 12 | 48 | 0 | 48 |
| B2 | NA | 15 | 13 | 52 | 0 | 52 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 97%.
B180%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
B269%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 7% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 97% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
Progress on shared amenities15
As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 65% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 65% |
| Street Lighting | Yes | 80% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 70% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 70% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed314
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| B1 | 157 | 157 |
| B2 | 157 | 157 |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Shreyan Infra and Power LLP | Pune (M Corp.) | Pune |
| Mohit Developers | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| B2 | NA | Rs 13.37 cr | Rs 7.09 cr |
| B1 | NA | Rs 12.47 cr | Rs 10.62 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vilas Tarwadi Tarwadi |
| Engineer | Manjiri Desai Desai |
| Chartered Accountant | R D Kabra |
| Chartered Accountant | SAC & Co LLP |
| Partner | Role in project |
|---|---|
| Shreyan Ventures | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12603706 | Santosh Ramesh Mutha | Shreyan Ventures | 15/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 May 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Akshardham 31032026.pdf | 29 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Akshardham 31032026.pdf | 29 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Akshardham Phase 2 30032026 F sign_compressed.pdf | 29 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Akshardham 31122025.pdf | 18 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Akshardham 31122025.pdf | 18 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Akshardham Phase 2 31122025 F sign.pdf | 18 Feb 2026 |
| Withdrawal Update Form 1File: Form1 Akshardham Ph II June 2025.pdf | 11 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 Akshardham Phase 1.pdf | 11 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Akshardham June 2025.pdf | 11 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Akshardam Phase II.pdf | 11 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Akshardham Phase 2 30062024_compressed.pdf | 11 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Akshardham Phase 2 30092025 F sign_compressed.pdf | 11 Nov 2025 |
| Withdrawal Update Form 1File: Form1 Akshardham Ph II June 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 Akshardham June 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 Akshardham Phase 2 30062024_compressed.pdf | 1 Aug 2025 |
| Form 1File: Form1 Akshardham Ph II Mar 2025.pdf | 9 Jul 2025 |
| Form 2File: Form2 Akshardham Ph II Mar 2025.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Akshardham Phase II Inventory.pdf | 9 Jul 2025 |
| Form 3File: Form 3 Akshardham Phase II_c.pdf | 9 Jul 2025 |
| Copy of the legal title reportFile: Supplementary Title Report.pdf | 17 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Akshardham Ph II Mar 2025.pdf | 2 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Akshardham Phase 2 30032025_compressed.pdf | 2 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Akshardham Ph II Mar 2025.pdf | 2 May 2025 |
| Disclosure of sold/ booked inventoryFile: Akshardham Phase 2 Inventory till 31032025.pdf | 2 May 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory_Akshardham Ph 2 for June.pdf | 14 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory_Akshardham Ph 2.pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AKshardham Ph 2.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Akshardham phase 2 31-12-2024_compressed.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Akshardham Ph 2.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Shreyan Ventures.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ashardham PH2.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Akshardham Phase 2 compressed.pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Akshardham Ph 2.pdf | 12 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 Akshardham phaes 2 31-03-2024.pdf | 8 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Shreyan Ventures.pdf | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Akshardham Phase 2.pdf | 31 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Akshardham Phase 2 30062024_compressed.pdf | 31 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Shreyan VenturesSold Unsold Sept 23.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Shreyan VenturesSold Unsold Dec 23.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Shreyan VenturesSold Unsold Mar 24.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Akshardham Phase 2 31032024_compressed.pdf | 20 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Form regard AC_FORMAT_A.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Akshardham Phase 2.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Akshardham ph 2_compressed.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 23 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 for Akshardham Phase 2 Sept.pdf | 23 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 for Akshardham Phase 2-.pdf | 23 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Akshardham Phase 2 31-12-2023_compressed.pdf | 22 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Akshardham Phase 2.pdf | 21 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Akshardham Phase 2 31-12-2023.pdf | 21 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Akshardham phase 2 30-09-2023_compressed.pdf | 21 Mar 2024 |
| Proforma of Agreement for saleFile: Agreement to sale draft 28 July.pdf | 31 Jul 2023 |
| Deviation Report with respect to model copy of AgreementFile: 7-Deviation Report for ATS 28 July.pdf | 31 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure for MD.pdf | 6 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure for LLP.pdf | 6 Jul 2023 |
| Building plan approvalFile: B1-B2 1st floor plan - Copy.PDF | 24 Jun 2023 |
| Building plan approvalFile: B1-B2 1st floor plan.PDF | 24 Jun 2023 |
| Building plan approvalFile: B1-B2 Floor Plan - 2,4,6,10.PDF | 24 Jun 2023 |
| Building plan approvalFile: B1-B2 Floor Plan - 3,5,7.PDF | 24 Jun 2023 |
| Building plan approvalFile: B1-B2 Floor Plan - 13 and Terrace.PDF | 24 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: Encrumbrance Concerned to Finance.pdf | 24 Jun 2023 |
| Details of encumbrances concerned to LegalFile: Encrumbrance Concerned to Finance.pdf | 24 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: B1-B2 1st floor plan - Copy.PDF | 24 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: B1-B2 1st floor plan.PDF | 24 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: B1-B2 Floor Plan - 2,4,6,10.PDF | 24 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: B1-B2 Floor Plan - 3,5,7.PDF | 24 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: B1-B2 Floor Plan - 13 and Terrace.PDF | 24 Jun 2023 |
| Declaration about Commencement CertificateFile: Declaration about CC updated.pdf | 24 Jun 2023 |
| CERSAI detailsFile: 0_CERSAI_Search_Report.pdf | 13 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 0_Form 3_compressed.pdf | 13 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth Certificate Building B1-B2.pdf | 5 Jun 2023 |
| Declaration about Commencement CertificateFile: Plinth Certificate Building B1-B2.pdf | 5 Jun 2023 |
| Layout approvalFile: 0_Layout.PDF | 3 Jun 2023 |
| Building plan approvalFile: 0_Layout.PDF | 3 Jun 2023 |
| Building plan approvalFile: 0_B1-B2 Section and Elevation.PDF | 3 Jun 2023 |
| PAN CardFile: SHREYAN VENTURES PAN CARD new.pdf | 3 Jun 2023 |
| Copy of the legal title reportFile: 0_Legal Title Report.pdf | 3 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: 0_Declaration about Legal Encumberance.pdf | 3 Jun 2023 |
| Details of encumbrances concerned to LegalFile: 0_Declaration about Legal Encumberance.pdf | 3 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: 0_Layout.PDF | 3 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- All 89 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Akshardham Phase 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pune13,700+ in Pune
Dwarikadham
Yashodhan Affordable Landmark LLP
UNITAS FASHION CENTER
UNITATIS DEVELOPMENTS PVT. LTD
Millennium Park
Xrbia Epoch Creations LLP
BABAR CLASSIC VISTA WING E, F, G
Classic Properties
JITO NAGAR
JAIN ASHAPURI DEVELOPER UNIT II
Wellwisher West Views
Bhansali Infrastructure LLP
Builder: Shreyan Ventures
Shreyan Ventures has 1 registration on MahaRERA, including Akshardham Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Akshardham Phase 2 is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Akshardham Phase 2?
The registered promoter entity is Shreyan Ventures, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Akshardham Phase 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Akshardham Phase 2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Akshardham Phase 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Akshardham Phase 2?
The professionals named in the filing: Architect: Vilas Tarwadi Tarwadi; Engineer: Manjiri Desai Desai; Chartered Accountant: R D Kabra; Chartered Accountant: SAC & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Akshardham Phase 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback