Home / Browse projects / Mumbai Suburban, Maharashtra / AJMERA ICONIC

Registered Litigation declared Residential / Group Housing project

AJMERA ICONIC

By M K GROUP

RG-MH-46765 · RERA P51800013436 · Last updated on MahaRERA portal: 26 Aug 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Excavation, 80%
66 of 98Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

AJMERA ICONIC is a Residential / Group Housing project by M K GROUP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800013436 on 5 Oct 2017. Possession is promised by 30 Dec 2031. 32 of the 98 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAJMERA ICONIC
  • TypeResidential / Group Housing
  • Location
    • Near Terapant Bhavan
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800013436
  • ReraGenie IDRG-MH-46765

Builder

  • NameM K GROUP
  • Entity typePartnership
  • PartnerJITEN KISHORE AJMERA

Key dates

this monthRegisteredOct 2017PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2017
  • Promised completion30 Dec 2031
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

33%32 of 98 units booked
42.0%Work done, per cost certificate

Figures as on 26 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLDG NO2NA555598098

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 80%.

BLDG NO2: 33% average across the applicable activities

ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)50%
Plinth100%
Stilt Floor60%
Slabs of Super Structure45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Closed/Covered46

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area942 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Aug 2026

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI200000.0
Proposed, not sanctioned7,611 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch22/25, Ashoka Shopp Centre, LT Marg, Crawford Mkt, Mumbai, Maharashtra 400001
Estimated costRs 123.98 cr
Cost incurredRs 52.06 cr
Work done42.0%
BuildingWingEstimatedIncurred
BLDG NO2NARs 123.98 crRs 52.06 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAAKAR ARCHITECTS and CONSULTANTS
EngineerJW CONSULTANTS LLP
EngineerRakesh Kumar Singh
Chartered AccountantKailas Shinare
Chartered AccountantDhirajlal Shamji Madhvani
PartnerRole in project
M K GROUP-

Litigation declared1

CaseCourtStatus
1799/2011High Court of MumbaiOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000344176Rahul DeM/S. M.K. Group16/02/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2031

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2017-2018)File: Form 2A - 2017-2018.pdf26 Aug 2026
Form 2A (FY 2018-2019)File: Form 2A - 2018-2019.pdf26 Aug 2026
Form 2A (FY 2019-2020)File: Form 2A - 2019-2020.pdf26 Aug 2026
Form 2A (FY 2020-2021)File: Form 2A - 2020-2021.pdf26 Aug 2026
Form 2A (FY 2021-2022)File: Form 2A - 2021-2022.pdf26 Aug 2026
Form 2A (FY 2022-2023)File: Form 2A - 2022-2023.pdf26 Aug 2026
Form 2A (FY 2023-2024)File: Form 2A - 2023-2024.pdf26 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A - 2024-2025.pdf26 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A - 2025-2026.pdf26 Aug 2026
Withdrawal Update Form 1File: Form - 1 Architect Certificate 01042025 to 30062025.pdf11 Aug 2026
Withdrawal Update Form 1File: Form - 1 Architect Certificate 01072025 to 30092025.pdf11 Aug 2026
Withdrawal Update Form 1File: Form - 1 Architect Certificate 01102025 to 31122025.pdf11 Aug 2026
Withdrawal Update Form 1File: Form - 1 Architect Certificate 01012026 to 31032026.pdf11 Aug 2026
Withdrawal Update Form 1File: Form - 1 Architect Certificate 01042026 to 30062026.pdf11 Aug 2026
Withdrawal Update Form 2File: Form 2 01042025 to 30062025.pdf11 Aug 2026
Withdrawal Update Form 2File: Form 2 01042025 to 30062025.pdf11 Aug 2026
Withdrawal Update Form 2File: Form 2 - 01102025 to 31122025.pdf11 Aug 2026
Withdrawal Update Form 2File: Form 2 - 01012026 to 31032026.pdf11 Aug 2026
Withdrawal Update Form 2File: From 2 - 01042026 to 30062026.pdf11 Aug 2026
Withdrawal Update Form 3File: Form 3 - 01042025 to 30062025.pdf11 Aug 2026
Withdrawal Update Form 3File: Form 3 - 01072025 to 30092025.pdf11 Aug 2026
Withdrawal Update Form 3File: Form 3 - 01072025 to 30092025.pdf11 Aug 2026
Withdrawal Update Form 3File: Form 3 - 01012026 to 31032026.pdf11 Aug 2026
Withdrawal Update Form 3File: Form 3 - 01042026 to 30062026.pdf11 Aug 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf7 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf7 Jul 2026
Withdrawal Update Form 3File: Form3.pdf7 Jul 2026
OtherFile: work status - M K Group.pdf14 Jan 2025
OtherFile: M K Group.pdf27 Nov 2024
OtherFile: Work Status - MKGroup.pdf8 Aug 2024
OtherFile: Form 1 Ajmera Manor.pdf9 May 2024
OtherFile: Form 1 M K Group.pdf9 May 2024
OtherFile: Works Status M K Group.pdf25 Jan 2024
OtherFile: Work Status.pdf10 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: M K GROUP.pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: M K GROUP.pdf5 Oct 2023
OtherFile: Work Status M K Group.pdf10 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-21.pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf11 Apr 2023
OtherFile: Work Status.pdf5 Apr 2023
OtherFile: Work Status.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf10 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf2 Nov 2022
OtherFile: Work Status.pdf12 Oct 2022
OtherFile: Work status.pdf19 Jul 2022
OtherFile: Work Status Ajmera Iconic.pdf27 Apr 2022
Details of Restarting of Construction work post lockdownFile: iconic.pdf11 Mar 2022
Certificates of CA (Form 3)File: Form 3 - Ajmera Iconic Oct 2021.pdf30 Oct 2021
Details of Restarting of Construction work post lockdownFile: Ajmera Iconic Work Status Oct 2021.pdf30 Oct 2021
Details of Restarting of Construction work post lockdownFile: Ajmera Iconic.pdf5 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Annual Report Ajmera Iconic.pdf24 Feb 2021
Details of Restarting of Construction work post lockdownFile: Ajmera Iconic work status.pdf16 Jan 2021
OtherFile: Status of work p.pdf19 Nov 2020
OtherFile: Work Status.pdf17 Jul 2020
OtherFile: Status of Work.pdf18 Jan 2020
OtherFile: Form 5.pdf14 Nov 2019
OtherFile: 09102019 Status of Work.pdf14 Oct 2019
OtherFile: 12062019 Status of Work.pdf13 Jun 2019
OtherFile: 28032019 Status of Work.pdf24 May 2019
Certificates of CA (Form 5)File: Form 5.pdf8 Feb 2019
OtherFile: 31122018 Status of Work.pdf10 Jan 2019
OtherFile: 12102018 Status of Work.pdf15 Oct 2018
OtherFile: 09072018 Status of Project.pdf12 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf6 Apr 2018
OtherFile: Status of Project.pdf5 Apr 2018
OtherFile: Ajmera Iconic Status of Work.pdf15 Jan 2018
PAN CardFile: Pan Card.pdf31 Jul 2017
Copy of the legal title reportFile: Title Report II.pdf31 Jul 2017
Layout approvalFile: Layout.pdf30 Jul 2017
Building plan approvalFile: IOD.pdf30 Jul 2017
Copy of the legal title reportFile: Title Report.pdf30 Jul 2017
Details of encumbrancesFile: Declaration.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout.pdf30 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf30 Jul 2017
Declaration in FORM BFile: Form B Ajmera Iconic.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Ajmera Iconic.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Ajmera Iconic.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA Certificate.pdf30 Jul 2017
Proforma of Allotment letterFile: Declaration for Agreement.pdf30 Jul 2017

How this compares with Mumbai Suburban

33%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AJMERA ICONIC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmAJMERA ICONICCompleted 136Lapsed / revoked 75Other 180Dot size: filed unitsN

Filed coordinates, straight-line distance. 391 registered projects within 2 km.

Builder: M K GROUP

M K GROUP has 1 registration on MahaRERA, including AJMERA ICONIC. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if AJMERA ICONIC is delayed beyond 30 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AJMERA ICONIC?

The registered promoter entity is M K GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AJMERA ICONIC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AJMERA ICONIC?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AJMERA ICONIC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AJMERA ICONIC?

The professionals named in the filing: Architect: AAKAR ARCHITECTS and CONSULTANTS; Engineer: JW CONSULTANTS LLP; Engineer: Rakesh Kumar Singh; Chartered Accountant: Kailas Shinare; Chartered Accountant: Dhirajlal Shamji Madhvani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AJMERA ICONIC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AJMERA ICONIC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AJMERA ICONIC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.