Home / Browse projects / Pune, Maharashtra / AJMERA EXOTICA

Completed No litigation declared Residential / Group Housing project

AJMERA EXOTICA

By Gopinath Developers LLP

RG-MH-35572 · RERA P52100015618 · Last updated on MahaRERA portal: 17 Apr 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Feb 2023Possession promisedregistration recorded completed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 95%
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

AJMERA EXOTICA is a Residential / Group Housing project by Gopinath Developers LLP in Pune, Maharashtra, registered with MahaRERA as P52100015618 on 15 Mar 2018. The registration is recorded completed; possession was promised by 23 Feb 2023.

At a glance

Project

  • NameAJMERA EXOTICA
  • TypeResidential / Group Housing
  • Location
    • Nagar Road
    • Wagholi gaonthan
    • WAGHOLI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100015618
  • ReraGenie IDRG-MH-35572

Builder

  • NameGopinath Developers LLP
  • Entity typePartnership
  • Other registrations2 more →
  • Completed3 of 3

Key dates

this monthRegisteredMar 2018PromisedFeb 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Mar 2018
  • Promised completion23 Feb 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ajmera Exotica A WingNA140000
Ajmera Exotica B WingNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

Ajmera Exotica A Wing46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor60%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Ajmera Exotica B Wing49%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)60%
Plinth100%
Stilt Floor70%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises3%
Sanitary Fittings within the flats / premises3%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 17 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
CLUB HOUSEYes0%

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered57
Open Space15
BuildingClosed/CoveredOpen SpaceTotal
Ajmera Exotica A Wing291544
Ajmera Exotica B Wing28028

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7536.43
Proposed, not sanctioned7,536 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNorth Main Road, Kore gaon Park, Pune 411001

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMalwadkar Architects
EngineerMs Strudcom Consultants
PartnerRole in project
Gopinath Developers LLP-

Litigation declared1

CaseCourtStatus
1771 /2012Civil Judge Sr Division Pune at PunePending Gopinath Developers LLP is not a Party to the Suit

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Mar 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Oct 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Sep 2021

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Gopinath Developers LLP Exotica Phase I Form 5 2017-2018.pdf17 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 56_5556_gopinath devlopers _Phase I Exotica 2018-2019.pdf17 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: GOPINATH DEVELOPERS LLP EXOTICA PHASE I FORM 5 2019-2020.pdf17 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GDPLL Exotica Phase I 2021-2022 Form 5.pdf17 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Architects fORM 4.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4778_001.pdf14 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 EXOTICA.pdf11 Oct 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Exotica OC_compressed.pdf6 Sep 2021
Certificates of CA (Form 3)File: EXOTICA.pdf3 Sep 2021
Certificates of CA (Form 3)File: form 3 exotica.pdf18 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 exotica.pdf18 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EXOTICA ENGINEER CERTIFICATE.pdf15 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EXOTICA 30 03 2021 FORM 2.pdf15 Jun 2021
Certificates of CA (Form 3)File: EXOTICA.pdf12 Mar 2021
Certificates of CA (Form 3)File: EXOTICA ca.pdf11 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Ar Cert.pdf5 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert - Rera 21-12- 2020.pdf5 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 0821_001.pdf11 Aug 2020
Certificates of CA (Form 3)File: Gopinath_0000281.pdf19 Dec 2019
Proforma of Allotment letterFile: EXOTICA REVISED AGGREMENT.pdf30 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: exotica form 1.pdf25 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Certificates.pdf25 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: exotica form 2.pdf13 Nov 2019
Layout approvalFile: HPSC0076 new.pdf4 Oct 2019
Layout approvalFile: HPSC0077 new.pdf4 Oct 2019
Layout approvalFile: HPSC0078 new.pdf4 Oct 2019
Layout approvalFile: HPSC0069 new.pdf4 Oct 2019
Layout approvalFile: HPSC0071 new.pdf4 Oct 2019
Layout approvalFile: HPSC0072 new.pdf4 Oct 2019
Layout approvalFile: HPSC0073 new.pdf4 Oct 2019
Layout approvalFile: HPSC0074 new.pdf4 Oct 2019
Layout approvalFile: HPSC0075 new.pdf4 Oct 2019
Copy of Layout Approval (in case of layout)File: HPSC0069 new.pdf4 Oct 2019
Copy of Layout Approval (in case of layout)File: HPSC0071 new.pdf4 Oct 2019
Copy of Layout Approval (in case of layout)File: HPSC0072 new.pdf4 Oct 2019
Copy of Layout Approval (in case of layout)File: HPSC0073 new.pdf4 Oct 2019
Copy of Layout Approval (in case of layout)File: HPSC0074 new.pdf4 Oct 2019
Copy of Layout Approval (in case of layout)File: HPSC0075 new.pdf4 Oct 2019
Copy of Layout Approval (in case of layout)File: HPSC0078 new.pdf4 Oct 2019
Copy of Layout Approval (in case of layout)File: HPSC0076 new.pdf4 Oct 2019
Copy of Layout Approval (in case of layout)File: HPSC0077 new.pdf4 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate new.pdf4 Oct 2019
Certificates of CA (Form 3)File: form 3 Exotica.pdf31 Aug 2019
Certificates of CA (Form 3)File: Form 3.pdf22 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf8 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate.pdf1 Jul 2019
Certificates of CA (Form 3)File: scan1062.pdf22 Mar 2019
Certificates of CA (Form 3)File: scan0992.pdf22 Mar 2019
Proforma of Allotment letterFile: ajmera exotica sale agreement draft.pdf14 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf17 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf17 Oct 2018
Certificates of CA (Form 3)File: Ajmera Exotica CA Certificate.pdf9 Mar 2018
Building plan approvalFile: Ajmera Exotica NA ORDER.pdf7 Mar 2018
Layout approvalFile: Floor Plans.pdf7 Mar 2018
Layout approvalFile: Area Statement after Amalgamation.pdf7 Mar 2018
Layout approvalFile: Elevation Plans.pdf7 Mar 2018
Layout approvalFile: Floor Plan and area calculation.pdf7 Mar 2018
Layout approvalFile: Floor Plans 4th 8th 10th floor.pdf7 Mar 2018
Layout approvalFile: Open space area and layout plan.pdf7 Mar 2018
Layout approvalFile: Podium Floor Plan.pdf7 Mar 2018
Layout approvalFile: Terrace Floor Plan.pdf7 Mar 2018
PAN CardFile: GOPINATH DEVELOPERS LLP PAN CARD.pdf7 Mar 2018
Copy of the legal title reportFile: Title Certificate Ajmera Exotica.pdf7 Mar 2018
Copy of the legal title reportFile: SupplementaryTitle Certificate Ajmera Exotica.pdf7 Mar 2018
Copy of Layout Approval (in case of layout)File: Floor Plans.pdf7 Mar 2018
Copy of Layout Approval (in case of layout)File: Area Statement after Amalgamation.pdf7 Mar 2018
Copy of Layout Approval (in case of layout)File: Elevation Plans.pdf7 Mar 2018
Copy of Layout Approval (in case of layout)File: Floor Plan and area calculation.pdf7 Mar 2018
Copy of Layout Approval (in case of layout)File: Floor Plans 4th 8th 10th floor.pdf7 Mar 2018
Copy of Layout Approval (in case of layout)File: Open space area and layout plan.pdf7 Mar 2018
Copy of Layout Approval (in case of layout)File: Podium Floor Plan.pdf7 Mar 2018
Copy of Layout Approval (in case of layout)File: Terrace Floor Plan.pdf7 Mar 2018
Building Plan Approval (IOD)File: Ajmera Exotica NA ORDER.pdf7 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: Ajmera Exotica CC.pdf7 Mar 2018
Declaration in FORM BFile: Affidavit cum Declaration Ajmera Exotica.pdf7 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ajmera Exotica Architect Certificate.pdf7 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ajmera Exotica Engineer's Certificate.pdf7 Mar 2018
OtherFile: PAN CARD Sanjay C Ajmera.pdf7 Mar 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AJMERA EXOTICA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi gaonthan13,700+ in Pune

2 kmAJMERA EXOTICACompleted 66Lapsed / revoked 28Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 136 registered projects within 2 km.

Builder: Gopinath Developers LLP

Gopinath Developers LLP has 3 registrations on MahaRERA, including AJMERA EXOTICA and Ajmera Exotica Phase-II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AJMERA EXOTICA is delayed beyond 23 Feb 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AJMERA EXOTICA?

The registered promoter entity is Gopinath Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AJMERA EXOTICA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AJMERA EXOTICA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AJMERA EXOTICA?

The professionals named in the filing: Architect: Malwadkar Architects; Engineer: Ms Strudcom Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AJMERA EXOTICA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AJMERA EXOTICA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AJMERA EXOTICA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.