Home / Browse projects / Pune, Maharashtra / AISHWARYA RESIDENCY

Completed No litigation declared Residential / Group Housing project

AISHWARYA RESIDENCY

By VYAS BUILDCON PVT. LTD.

RG-MH-08638 · RERA P52100002455 · Last updated on MahaRERA portal: 3 Mar 2020

Source: official MahaRERA filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2018Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Installation of Lifts, 96%
0Complaints at MahaRERAon this registration
Jump to the 23 documents Report an error

AISHWARYA RESIDENCY is a Residential / Group Housing project by VYAS BUILDCON PVT. LTD. in Pune, Maharashtra, registered with MahaRERA as P52100002455 on 1 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2018. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameAISHWARYA RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Baner
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100002455
  • ReraGenie IDRG-MH-08638

Builder

  • NameVYAS BUILDCON PVT. LTD.
  • Entity typeCompany
  • CINU45200PN2010PTC135713
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorVAISHALI RAJESH VYAS
  • Other registrations7 more →
  • Completed5 of 8
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2017First promiseMar 2018Revised toDec 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Aug 2017
  • Promised completion31 Dec 2018
  • Revised completionRevised to 31 Dec 2018 (originally 31 Mar 2018)
  • Buildings1 building record
  • Documents filed23 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AISHWARYA RESIDENCYNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Mar 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 96%.

AISHWARYA RESIDENCY: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%

Progress on shared amenities15

As on 3 Mar 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area909 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
MANJIRI VISHWAS JOSHIKothrudPune

Approvals and building plan

Permissible FSI662.44
Proposed, not sanctioned662 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHANKAR NAGARI PAUD ROAD KOTHRUD PUNE 411029

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRASAD D MAHAJAN
PartnerRole in project
VYAS BUILDCON PVT. LTD.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100000299Mar 2018 → Dec 2018

Reason as filed by the promoterAishwarya Residency’s Partly Completion is done, we have applied For Completion of remaining 1 (FLAT NO:-103) Flat, Society Formation is done. hence, we required permission for extension of project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Mar 2020

Documents filed23

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 55555555.pdf3 Mar 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3333333.pdf3 Mar 2020
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 AISHWARYA.pdf3 Mar 2020
Status of ConveyanceFile: Baner Coneyance Deed Index 2.pdf17 Feb 2020
OtherFile: OCCUPANCY CERTIFICATE PART.pdf19 Jul 2018
OtherFile: OCCUPANCY CERTIFICATE FINAL.pdf19 Jul 2018
Status of Formation of Legal EntityFile: Society formation certificate AISHWRYA RESIDENCY.pdf6 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aishwarya Resi Engineer Certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: Aishwrya resi CA Certificate.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AISHWARYA BANER ARCHITECT CERTIFICATE.pdf27 Jul 2017
Declaration in FORM BFile: affidavit cum declartion vyas buildcon baner site B form.pdf26 Jul 2017
Layout approvalFile: k prat baner.pdf24 Jul 2017
Details of encumbrancesFile: declaration of no encumbrance aishwarya residency.pdf24 Jul 2017
Copy of Layout Approval (in case of layout)File: k prat baner.pdf24 Jul 2017
Proforma of Allotment letterFile: Agreement Draft VBPL Aishwarya Residency.pdf24 Jul 2017
Proforma of Allotment letterFile: Allotment letter VBPL Aishwarya Residency.pdf24 Jul 2017
OtherFile: declaration regarding draft of agreement to sell.pdf24 Jul 2017
Building plan approvalFile: baner sanction plan pmc 1.pdf22 Jul 2017
Building plan approvalFile: baner sanction plan pmc.pdf22 Jul 2017
Building Plan Approval (IOD)File: baner sanction plan pmc 1.pdf22 Jul 2017
Building Plan Approval (IOD)File: baner sanction plan pmc.pdf22 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: baner commencemnet certificate.pdf22 Jul 2017
Copy of the legal title reportFile: LEGAL TITLE REPORT - BANER.pdf21 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SUDHENDU CO OP HSG SOCIETYP52100029983RAMBAUG COLONY, Pune32Jul 2021CompletedApr 2024Feb 2024
Aasawari CHSIdeal Colony Kothrud Pune 3835-CompletedDec 2023May 2022
Alankapurishree CHSKothrud Pune 3840-CompletedJun 2022Aug 2021
AISHWARY RESEDENCYYOGI PARK12-CompletedOct 2017Late, Jul 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 9 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AISHWARYA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Baner13,700+ in Pune

2 kmAISHWARYA RESIDENCYCompleted 174Lapsed / revoked 62Other 162Dot size: filed unitsN

Filed coordinates, straight-line distance. 398 registered projects within 2 km.

Builder: VYAS BUILDCON PVT. LTD.

VYAS BUILDCON PVT. LTD. has 8 registrations on MahaRERA, including AISHWARYA RESIDENCY and PRATIBHA SADAN CO. OP. HSG. SOC.. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AISHWARYA RESIDENCY is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AISHWARYA RESIDENCY?

The registered promoter entity is VYAS BUILDCON PVT. LTD., a company as per the filing. Its CIN U45200PN2010PTC135713 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AISHWARYA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AISHWARYA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AISHWARYA RESIDENCY?

The professionals named in the filing: Architect: PRASAD D MAHAJAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AISHWARYA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AISHWARYA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AISHWARYA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.