ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Aim Horizon

Registered No litigation declared Others project

Aim Horizon

By A.M Enterprises

RG-MH-42189 · RERA P51800047046 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
8 of 11Construction stages donefurthest along: Installation of Lifts, 95%
49 of 127Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

Aim Horizon is a Others project by A.M Enterprises in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047046 on 26 Sep 2022. Possession is promised by 31 Dec 2028. 78 of the 127 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameAim Horizon
  • TypeOthers
  • Location
    • Natwar Nagar Road No.1
    • Jogeshwari east
    • Andheri
    • Mumbai Suburban
    • 400060
  • Pincode400060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800047046
  • ReraGenie IDRG-MH-42189

Builder

  • NameA.M Enterprises
  • Entity typePartnership
  • GSTIN27AARFA9672P1ZC
  • PartnerAadil Arif Hingora
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredSep 2022PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Sep 2022
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed107 files

Current status

61%78 of 127 units booked
79.6%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AIM HorizonNA20201216127

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

AIM Horizon: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Closed/Covered17

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area917 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Aug 2025
LandownerVillageDistrict
Om Sai Jogeshwari SRA CHS (Prop.)AndheriMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI3996.9
Proposed, not sanctioned2,961 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 4,5,9,10, Kesar Plaza, Caves Road, Jogeshwari East, 400060
Estimated costRs 35.50 cr
Cost incurredRs 28.25 cr
Work done79.57%
BuildingWingEstimatedIncurred
AIM HorizonNARs 35.50 crRs 28.25 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPunar Vikas Vastushshtra
EngineerMohamed Umer Malkani
Chartered AccountantRANK & Associates
Chartered AccountantPragnesh V Thakher
PartnerRole in project
A.M Enterprises-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: AIM Horizon Form 1 Q4 FY 25-26.pdf30 Apr 2026
Withdrawal Update Form 2File: AIM Horizon form 2 Q4 FY 25-26.pdf30 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4 FY 25-26 AIM Horizon.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1 AIM Horizon as on 31122025 Final.pdf7 Mar 2026
Withdrawal Update Form 2File: Form 2 AIM Horizon as on 31122025.pdf7 Mar 2026
Withdrawal Update Form 3File: AIM Horizon Form 3 as on 31122025.pdf7 Mar 2026
Withdrawal Update Form 1File: AIM Horizon Form 1 Q2.pdf7 Jan 2026
Withdrawal Update Form 2File: AIM Horizon Form 2 Q2.pdf7 Jan 2026
Withdrawal Update Form 3File: Signed AIM Horizon Form 3 Q2 FY 25-26.pdf7 Jan 2026
Form 5 (FY 2024-2025)File: Signed Aim Horizon form 5.pdf29 Sep 2025
Withdrawal Update Form 1File: Signed AIM HORIZON RERA Form1.pdf2 Sep 2025
Withdrawal Update Form 2File: Signed AIM HORIZON - FORM - 2.pdf2 Sep 2025
Withdrawal Update Form 3File: Sign_AIM Horizon form3 Q1.pdf2 Sep 2025
Withdrawal Update Form 1File: Form 1_AIM Horizon_Q4 of FY 24-25.pdf21 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf21 Aug 2025
Withdrawal Update Form 3File: Form 3_compressed.pdf21 Aug 2025
Form 1File: Form 1_AIM Horizon_Q4 of FY 24-25.pdf21 May 2025
Form 2File: Form 2.pdf21 May 2025
Disclosure of Sold and Booked InventoryFile: DOS.pdf21 May 2025
Form 3File: Form 3_compressed.pdf21 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_AIM Horizon.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_AIM Horizon as on 31122024.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_V2.pdf17 Feb 2025
Disclosure of sold/ booked inventoryFile: DOS.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Final_Compressed.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30092024.pdf4 Feb 2025
Disclosure of sold/ booked inventoryFile: Discl of sold unsold.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 30092024.pdf3 Feb 2025
Declaration about Commencement CertificateFile: Declaration about CC.pdf8 Jan 2025
Building plan approvalFile: IOD - PLAN_11zon (1).pdf7 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC - AIM HORIZON - 11-09-2024.pdf7 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: IOD - PLAN_11zon (1).pdf7 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_23-24.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: Disc of sold unsold as on 31032024.pdf19 Jun 2024
Disclosure of sold/ booked inventoryFile: Discl of sold unsold_AIM Horizon.pdf21 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aim Horizon - Edited_11zon.pdf21 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - AIM HORIZON - 09-10-2023.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_22-23.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_23-24.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold as on 31012024.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aim Horizon - Compressed.pdf3 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - AIM HORIZON - 09-10-2023.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_revised.pdf26 Apr 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2024
Layout approvalFile: Layout_09-10-2023.pdf18 Apr 2024
Building plan approvalFile: Layout_09-10-2023.pdf18 Apr 2024
Building plan approvalFile: floor and terrace PLAN_till 13th floor_09-10-2023.pdf18 Apr 2024
Building plan approvalFile: Refugee floor PLAN_till 13th floor_09-10-2023.pdf18 Apr 2024
Building plan approvalFile: FSI Calculation of floor_PLAN till 13th floor_09-10-2023.pdf18 Apr 2024
Building plan approvalFile: Section Plan_till 13th floor_09-10-2023.pdf18 Apr 2024
Copy of Layout Approval (in case of layout)File: Layout_09-10-2023.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout_09-10-2023.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: floor and terrace PLAN_till 13th floor_09-10-2023.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Refugee floor PLAN_till 13th floor_09-10-2023.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: FSI Calculation of floor_PLAN till 13th floor_09-10-2023.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Section Plan_till 13th floor_09-10-2023.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf18 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - AIM HORIZON.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aim Horizon.pdf15 Mar 2024
Disclosure of sold/ booked inventoryFile: AIM HorizonDisc of sold unsold as on 30092023.pdf9 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - AIM HORIZON_Signed.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: AIM Horizon revised Disclosure of sold unsold.pdf18 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: CC - AIM HORIZON.pdf8 Jun 2023
Declaration about Commencement CertificateFile: Declaration about cc.pdf8 Jun 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory as on 31032023.pdf8 May 2023
Layout approvalFile: Copy of Layout Approval Sheet no 1.pdf12 Sep 2022
Copy of Layout Approval (in case of layout)File: Copy of Layout Approval Sheet no 1.pdf12 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_need to upload on portal.pdf8 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow8 Sep 2022
Building plan approvalFile: IOA PLAN CTS NO 280 281 2.pdf3 Sep 2022
Building plan approvalFile: IOA PLAN CTS NO 280 281 3.pdf3 Sep 2022
Building plan approvalFile: IOA PLAN CTS NO 280 281 4.pdf3 Sep 2022
Building plan approvalFile: IOA PLAN CTS NO 280 281 5.pdf3 Sep 2022
Building plan approvalFile: IOA PLAN CTS NO 280 281 6.pdf3 Sep 2022
Building plan approvalFile: IOA PLAN CTS NO 280 281 7.pdf3 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: IOA PLAN CTS NO 280 281 2.pdf3 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: IOA PLAN CTS NO 280 281 3.pdf3 Sep 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
AIM PlatinumP51800023249Jogeshwari - East, Mumbai Suburban-Dec 2019Certificate SignedDec 2025Jan 2023
AIM AvenueP51800028763Jogeshwari East, Mumbai Suburban17Mar 2021CompletedSep 2024Mar 2023

How this compares with Mumbai Suburban

61%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aim Horizon on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jogeshwari east6,700+ in Mumbai Suburban

2 kmAim HorizonCompleted 101Lapsed / revoked 56Abeyance 1Other 126Dot size: filed unitsN

Filed coordinates, straight-line distance. 284 registered projects within 2 km.

Builder: A.M Enterprises

A M ENTERPRISES has 4 registrations on MahaRERA, including KEHKASHAN APARTMENT and AIM Residency Phase I. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Aim Horizon is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aim Horizon?

The registered promoter entity is A.M Enterprises, a partnership as per the filing. Its GSTIN 27AARFA9672P1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aim Horizon?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aim Horizon?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aim Horizon?

The professionals named in the filing: Architect: Punar Vikas Vastushshtra; Engineer: Mohamed Umer Malkani; Chartered Accountant: RANK & Associates; Chartered Accountant: Pragnesh V Thakher. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aim Horizon?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aim Horizon. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aim Horizon to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.