ADITI
RG-MH-60013 · RERA P52100050632 · Last updated on MahaRERA portal: 18 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 3 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 8 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ADITI is a Residential / Group Housing project by Amol Ajit Ravetkar in Pune, Maharashtra, registered with MahaRERA as P52100050632 on 21 Apr 2023. Possession is promised by 31 Mar 2027. 8 of the 27 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameADITI
- TypeResidential / Group Housing
- Location
- S NO 137/4 CTS NO - 749
- PLOT NO 38+39+40
- TIMMAKA NIVAS+PRASAD CO-OP SOCIETY+ABHAYSHRI CO-OP SOCIETY KOTHRUD
- PUNE
- KOTHRUD
- Haveli
- Pune
- 411038
- Pincode411038
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100050632
- ReraGenie IDRG-MH-60013
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Apr 2023
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings1 building record
- Documents filed106 files
Current status
Figures as on 18 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ADITI | NA | 7 | 7 | 27 | 0 | 27 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 70%.
ADITI: 35% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed31
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| PRASAD CO-OPERATIVE HOUSING SOCIETY | Kothrud | Pune |
| ABHAYSHRI CO-OPERATIVE HOUSING SOCIETY | Kothrud | Pune |
| TIMAKKA NIVAS APARTMENTS CONDOMINIUM | Kothrud | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | A DESIGN STUDIO |
| Architect | Kaumudi Mathane |
| Engineer | NILESH GUJAR |
| Chartered Accountant | PHULE WAGH & ASSOCIATES LLP |
| Partner | Role in project |
|---|---|
| Amol Ajit Ravetkar | - |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12500176 | Ram Gawali | Amol Ajit Ravetkar | 14/11/2025 |
| SM12600258 | Ram Gawali | Amol Ajit Ravetkar | 07/04/2026 |
| SM12600264 | Ram Gawali | Amol Ajit Ravetkar | 07/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jan 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jan 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed106
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Architect Certificate Q1 FY 2025-26.pdf | 18 Jun 2026 |
| Form 2File: Form 2 Engineer Cartificate Q1 FY 2025-26.pdf | 18 Jun 2026 |
| Form 3File: Q1 final ADITI FORM 3 Chartered Accountant Certificate.pdf | 18 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory Q1 FY 2025-26.pdf | 18 Jun 2026 |
| Form 1File: Form 1 Architect Cartificate Q2 FY 2025-26.pdf | 18 Jun 2026 |
| Form 2File: Form 2 Engineer Cartificate Q2 FY 2025-26.pdf | 18 Jun 2026 |
| Form 3File: Q2 final ADITI FORM 3 Chartered Accountant Certificate.pdf | 18 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory Q2 FY 2025-26.pdf | 18 Jun 2026 |
| Form 1File: Form 1 Architect Certificate Q3 FY 2025-26.pdf | 18 Jun 2026 |
| Form 2File: Form 2 Engineer Cartificate Q3 FY 2025-26.pdf | 18 Jun 2026 |
| Form 3File: Q3 final ADITI FORM 3 Chartered Accountant Certificate.pdf | 18 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q3 FY 2025-26.pdf | 18 Jun 2026 |
| Form 1File: Form 1 Architect Certificate Q4.pdf | 18 Jun 2026 |
| Form 2File: Form 2 Engineer Certificate ADITI Q4.pdf | 18 Jun 2026 |
| Form 3File: Q4 final ADITI FORM 3 Chartered Accountant Certificate 31032026.pdf | 18 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q4 FY 2025-26.pdf | 18 Jun 2026 |
| Form 1File: Form 1.pdf | 20 May 2025 |
| Form 2File: FORM 2 Engineer Certificate- Updated.pdf | 20 May 2025 |
| Form 3File: final ADITI FORM 3 Chartered Accountant Certificate 31032025.pdf | 20 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory Sold Unsold Q4.pdf | 20 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 31 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: final ADITI FORM 3 Chartered Accountant Certificate 30062024.pdf | 31 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: final ADITI FORM 3 Chartered Accountant Certificate 30092024.pdf | 31 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: final ADITI FORM 3 Chartered Accountant Certificate 31122024.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 31 Jan 2025 |
| Layout approvalFile: Plan 1-5.pdf | 30 Jan 2025 |
| Building plan approvalFile: Plan 2-5.pdf | 30 Jan 2025 |
| Building plan approvalFile: Plan 3-5.pdf | 30 Jan 2025 |
| Building plan approvalFile: Plan 4-5.pdf | 30 Jan 2025 |
| Building plan approvalFile: Plan 5-5.pdf | 30 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: Plan 1-5.pdf | 30 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Final Revised CC.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2-5.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3-5.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 4-5.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 5-5.pdf | 30 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aditi.pdf | 20 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC revise Aditi.pdf | 15 Jun 2024 |
| Declaration about Commencement CertificateFile: Format D-Commencement Plan.pdf | 15 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate 31032024.pdf | 12 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-FY 2023-24.pdf | 12 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: final ADITI FORM 3 Chartered Accountant Certificate 31032024.pdf | 12 Jun 2024 |
| Layout approvalFile: Plan 1.pdf | 3 Jun 2024 |
| Building plan approvalFile: Plan 2.pdf | 3 Jun 2024 |
| Building plan approvalFile: Plan 3.pdf | 3 Jun 2024 |
| Building plan approvalFile: Plan 4.pdf | 3 Jun 2024 |
| Building plan approvalFile: Plan 5.pdf | 3 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plan 1.pdf | 3 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 3 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf | 3 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf | 3 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf | 3 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: Financial Encumburance aditi.pdf | 13 May 2024 |
| Details of encumbrances concerned to LegalFile: Financial Encumburance aditi.pdf | 13 May 2024 |
| Proforma of Agreement for saleFile: AFS Final.pdf | 13 May 2024 |
| Details of encumbrances concerned to FinanceFile: Aditi financial encumbrance 15042024.pdf | 15 Apr 2024 |
| Details of encumbrances concerned to LegalFile: Aditi financial encumbrance 15042024.pdf | 15 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: aditi form 1 31122023 scan.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aditi 30623.pdf | 12 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aditi 30923.pdf | 12 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate 30062023.pdf | 8 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - 30092023.pdf | 8 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - 31122023.pdf | 8 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Discloser of sold booked inventory q3 scan.pdf | 8 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: final ADITI FORM 3 Chartered Accountant Certificate 30062023.pdf | 8 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: final ADITI FORM 3 Chartered Accountant Certificate 30092023.pdf | 8 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: final ADITI FORM 3 Chartered Accountant Certificate 31122023.pdf | 8 Jan 2024 |
| Copy of the legal title reportFile: Aditi NEW Search and tittle report 07042023.pdf | 7 Apr 2023 |
| Other - LegalFile: Aditi NEW Search and tittle report 07042023.pdf | 7 Apr 2023 |
| Other - LegalFile: Concent of Gururaj society.pdf | 7 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Revised scan 04042023.pdf | 4 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Consent gururaj.pdf | 22 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 22 Mar 2023 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Manali | Parvati Sahakar Nagar Pune 411009 | 11 | Completed | Feb 2021 | Oct 2020 |
| Suvarna | Lane no 19 Dahanukar Colony Kothrud Pune 411038 | 20 | Completed | Mar 2020 | Jan 2020 |
| Piyusha | Off. law college road Erandwane Pune 411004 | 18 | Completed | Mar 2019 | Jan 2019 |
| Anusha Residency | Parvati | 10 | Completed | Jan 2017 | Dec 2016 |
| Rahul Vihar - A | Lane 18 Dhanukar Colony Kothrud Pune | 15 | Completed | Oct 2016 | Oct 2016 |
| Om Bramha | Dhanukar Colony | 15 | Completed | Mar 2015 | Mar 2015 |
| Tulips | Lane no 14 Rajwade Path Bhandarkar Road Pune 411004 | 21 | Completed | Apr 2013 | Apr 2013 |
| Poornima | Gultekdi | 18 | Completed | Dec 2012 | Dec 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 15 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 106 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ADITI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KOTHRUD13,700+ in Pune
Filed coordinates, straight-line distance. 301 registered projects within 2 km.
Pratik Nagar Palladio Kothrud Central
Vilas Javdekar Infinitee Developers Pvt. L
NEW FRIENDS
MAJESTIQUE DUROPOLIS PRIVATE LIMITED
SARVATRA CO-OP HSG SOCIETY LTD
Suryakant Kakade
Kshitij Residency
Yash Buildcon
MAYUK
MAYUR CORPORATION
Pune Baner Project-Tower 4 and 5
Goel Ganga Ventures India Private Limited
Builder: Amol Ajit Ravetkar
Amol Ajit Ravetkar has 16 registrations on MahaRERA, including Piyusha and Sukhniwas. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if ADITI is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ADITI?
The registered promoter entity is Amol Ajit Ravetkar, an individual as per the filing. Its GSTIN 27AGTPR5446G1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ADITI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ADITI?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ADITI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ADITI?
The professionals named in the filing: Architect: A DESIGN STUDIO; Architect: Kaumudi Mathane; Engineer: NILESH GUJAR; Chartered Accountant: PHULE WAGH & ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ADITI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback