ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / ADISHAKTI

Registered No litigation declared Residential / Group Housing project

ADISHAKTI

By ADIMAYA ENTERPRISE

RG-MH-68987 · RERA P51700031649 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 43 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedmoved 43 months from the original
9 of 11Construction stages donefurthest along: Basement (if any), 0%
27 of 43Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

ADISHAKTI is a Residential / Group Housing project by ADIMAYA ENTERPRISE in Thane, Maharashtra, registered with MahaRERA as P51700031649 on 3 Nov 2021. Possession is promised by 31 Jan 2027. The completion date has moved by 43 months from the original filing. 16 of the 43 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameADISHAKTI
  • TypeResidential / Group Housing
  • Location
    • DR. R P ROAD
    • DOMBIVLI EAST
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700031649
  • ReraGenie IDRG-MH-68987

Builder

  • NameADIMAYA ENTERPRISE
  • Entity typePartnership
  • PartnersPOPATLAL KESHARMAL BHANDARI, YUVRAJ POPATLAL BHANDARI

Key dates

this monthRegisteredNov 2021First promiseJun 2023Revised toJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Nov 2021
  • Promised completion31 Jan 2027
  • Revised completionRevised to 31 Jan 2027 (originally 3 Jun 2023)
  • Buildings1 building record
  • Documents filed105 files

Current status

37%16 of 43 units booked
52.3%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ADISHAKTINA9734943

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

ADISHAKTI: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area856 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Jun 2025
LandownerVillageDistrict
SURESH PANDHARINATH SHINDEDOMBIVLIThane
ASHOK PANDHARINATH SHINDEDOMBIVLIThane
RAMESH PANDHARINATH SHINDEDOMBIVLIThane
ANIL PANDHARINATH SHINDEDOMBIVLIThane
SHAKUNTALA SHASHIKANT SHINDEDOMBIVLIThane
AMOL SHASHIKANT SHINDEDOMBIVLIThane
SANGEETA PADMAKAR CHAUDHARIDOMBIVLIThane
SHILPA PRAKASH CHAUDHARIDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKalyan Dombivali Municipal Corporaion
Permissible FSI2660.1
Proposed, not sanctioned2,660 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDOMBIVLI EAST
Estimated costRs 15.15 cr
Cost incurredRs 7.93 cr
Work done52.3%
BuildingWingEstimatedIncurred
ADISHAKTINARs 15.15 crRs 7.93 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSthapatya Nirmaan
EngineerRahul B Hedulkar
Chartered AccountantR H Pothiwal & Associates
Chartered AccountantSachin K. Mishra & Co.
PartnerRole in project
ADIMAYA ENTERPRISE-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700016900Jun 2023 → Aug 2024

Reason as filed by the promoterDue to COVID-19 pandemic, the regular flow of work is hampered on account of unavailability of labour on regular basis

EXT51700024889Jun 2023 → May 2025

Reason as filed by the promoterWe applied for an Occupancy Certificate but have not yet received it from the Municipal Corporation. Therefore, we need an extension for the project until May 31, 2025.

EA11062501548Jun 2023 → Jan 2027

Reason as filed by the promoterWe have applied for the Occupancy Certificate, but it has not yet been issued by the Municipal Corporation. Therefore, we are requesting a third extension for the project until January 31, 2027. We have proposed this extended date as a precaution, considering the uncertainty regarding the time it may take to obtain the Occupancy Certificate from the corporation. We would be sincerely grateful to RERA for granting this extension.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jan 2027

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: RERA Audit Report_FY 2024-25.pdf15 May 2026
Withdrawal Update Form 1File: Form-1 Adishakti - Mar-26.pdf12 May 2026
Withdrawal Update Form 1File: Form-1 Adishakti - Mar-26.pdf12 May 2026
Withdrawal Update Form 2File: Form 2_Mar 26.pdf12 May 2026
Withdrawal Update Form 2File: Form 2_Mar 26.pdf12 May 2026
Withdrawal Update Form 3File: Form 3_Mar 26.pdf12 May 2026
Withdrawal Update Form 3File: Form 3_Mar 26.pdf12 May 2026
Withdrawal Update Form 1File: Architect Certificate Adishakti - Dec 25.pdf4 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate Adishakti - Dec 25.pdf4 Apr 2026
Withdrawal Update Form 3File: CA Certificate _Dec 25.pdf4 Apr 2026
Withdrawal Update Form 1File: Architech Certificate - Adishakti Sep 25.pdf18 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate - Adishakti Sep 25.pdf18 Nov 2025
Withdrawal Update Form 3File: CA Certificate_Sep 25_Adishakti.pdf18 Nov 2025
Withdrawal Update Form 1File: Architect Certificate - Adishakti - June 25.pdf9 Sep 2025
Withdrawal Update Form 2File: Engineer Certificate - June 25.pdf9 Sep 2025
Withdrawal Update Form 3File: CA Certificate_Adishakti_June-25.pdf9 Sep 2025
Form 1File: Architect Certificate - Adishakti - Mar 25.pdf23 Jun 2025
Form 2File: Engineer Certificate - Adishakti - Mar 25.pdf23 Jun 2025
Form 3File: CA Certificate_Adishakti_Mar-25-pages-deleted.pdf23 Jun 2025
Self-declaration of Quarterly ProgressFile: Self-Declaration for Quarterly Progress.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Adishakti - Mar 25.pdf23 Jun 2025
Form 2A (FY 2022-2023)File: Form 2A FY 2021-22.pdf23 Jun 2025
Form 2A (FY 2021-2022)File: Form 2A FY 2021-22.pdf23 Jun 2025
Form 2A (FY 2023-2024)File: Form 2A FY 2023-24.pdf23 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf23 Jun 2025
Form 5 (FY 2021-2022)File: Form 5 FY 2021-22.pdf23 Jun 2025
Form 5 (FY 2022-2023)File: Form 5 FY 2022-23.pdf23 Jun 2025
Form 5 (FY 2023-2024)File: Form 5 FY 2023-24.pdf23 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Adishakti - Dec 24.pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Adishakti_Dec-24.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Adishakti - Dec 24.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Adishakti_Dec-24.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Adishakti - Dec 24.pdf6 Feb 2025
Declaration in FORM BFile: Form_B.pdf9 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Audit Report_2023-24.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf7 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Adishakti - June 24.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Adishakti - Sep 24.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certifiacte-June 24.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_APR Group_Sep-24.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Adishakti - June 24.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Adishakti - Sep 24.pdf6 Nov 2024
Declaration in FORM BFile: Form B.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 AR Cert Mar 24.pdf22 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 ER Cert Dec 23.pdf22 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 ER Cert Mar 24.pdf22 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 CA Cert Dec 23.pdf22 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 CA Cert Mar 24.pdf22 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit-Final.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (December - 2021).pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (March - 2022).pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (June - 2022).pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (September - 2022).pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (December - 2022).pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (March - 2023).pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (June - 2023).pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (September - 2023).pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (December - 2023).pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - DEC 2021.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - MARCH 2022.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - JUNE 2022.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - SEP 2022.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - DEC 2022.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - MARCH 2023.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - June 2023.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - SEP 2023.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate_Dec 21.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Certificate_March 22.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate_June 22.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate_Sept 22.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 CA Certificate_Dec 22.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adimaya_ CA Cert_ March 23_signed.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sign CA Certifiate - June 23.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sign CA Certificate - Sep 23.pdf21 Feb 2024
Declaration in FORM BFile: Developers Form B_1 (3 files merged).pdf23 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate.pdf23 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Adimaya_RA_21 22_signed.pdf22 Jun 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal-Adishakti.pdf13 Jun 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal-Adishakti.pdf13 Jun 2023

How this compares with Thane

37%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 43 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ADISHAKTI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DOMBIVLI EAST7,600+ in Thane

2 kmADISHAKTICompleted 91Lapsed / revoked 81Other 146Dot size: filed unitsN

Filed coordinates, straight-line distance. 318 registered projects within 2 km.

Builder: ADIMAYA ENTERPRISE

ADIMAYA ENTERPRISE has 1 registration on MahaRERA, including ADISHAKTI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ADISHAKTI is delayed beyond 31 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ADISHAKTI?

The registered promoter entity is ADIMAYA ENTERPRISE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ADISHAKTI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ADISHAKTI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ADISHAKTI?

The professionals named in the filing: Architect: Sthapatya Nirmaan; Engineer: Rahul B Hedulkar; Chartered Accountant: R H Pothiwal & Associates; Chartered Accountant: Sachin K. Mishra & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ADISHAKTI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ADISHAKTI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ADISHAKTI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.