ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Adhish Residency

Completed No litigation declared Residential / Group Housing project

Adhish Residency

By A B Associates

RG-MH-55827 · RERA P52100048100 · Last updated on MahaRERA portal: 20 Sep 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 10 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
6 of 49Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 126 documents Report an error

Adhish Residency is a Residential / Group Housing project by A B Associates in Pune, Maharashtra, registered with MahaRERA as P52100048100 on 12 Dec 2022. The registration is recorded completed; possession was promised by 30 Oct 2025. The completion date has moved by 10 months from the original filing. 43 of the 49 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameAdhish Residency
  • TypeResidential / Group Housing
  • Location
    • Kondhwa
    • Pune
    • kondhwa BK
    • Haveli
    • 411048
  • Pincode411048
  • RERA no.P52100048100
  • ReraGenie IDRG-MH-55827

Builder

  • NameA B Associates
  • Entity typePartnership
  • PartnersBabaji Ramdas Narsale, Vinod Dasharath Danawale
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredDec 2022First promiseDec 2024Revised toOct 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Dec 2022
  • Promised completion30 Oct 2025
  • Revised completionRevised to 30 Oct 2025 (originally 15 Dec 2024)
  • Buildings1 building record
  • Documents filed126 files

Current status

88%43 of 49 units booked

Figures as on 20 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA8849049

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Building A: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed79

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots79
Closed/Covered79

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,400 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI3441.53
Proposed, not sanctioned3,442 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAmbegaon Pune 411046

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAWAN CHANDAK
EngineerKALYANI SUNIL JADHAV
Chartered AccountantGANESH PRABHAKAR DHINDLE
Chartered AccountantMILIND PADMAKAR TILWANKAR
PartnerRole in project
A B Associates-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025147Dec 2024 → May 2025

Reason as filed by the promoterWe M/s A B Associates hereby declare that the Extension of project status because Rera Project registered 2022 and the project was revised dated 14/02/2024 and that time extra floor work is added in the new revised sanction plan that’s why peoject was delay. and this time building painting work,internal work, fitting and installation works, Parking works are pending till date and the time period is not sufficient for completion of project that’s why project completion period is extended for completion of building. accordingly the information provided by us is true and correct. For your referen

EA10062501467Dec 2024 → Oct 2025

Reason as filed by the promoterWe M/s A B Associates project- Adhish Residency , PROJECT REGISTRATION NUMBER: P52100048100 Do hereby declare that the Extension of project status because of the time period is not sufficient for completion for project. Project was delayed because fund flow are shorted to complete construction and this time funds are available and work in process. building painting work, internal work, fitting and installation works, Parking works are pending till date and the time period is not sufficient for completion of project that’s why project completion period is extended for completion of building.. a

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed126

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC VERIFICATION MAIL.pdf20 Sep 2025
Occupational CertificateFile: FULL OCCUPANCY CERTIFICATE.pdf28 Jul 2025
Form 2A (FY 2022-2023)File: Form 2A -2022-23.pdf6 Jun 2025
Form 2A (FY 2023-2024)File: Form 2A -2023-24.pdf6 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A -2024-25.pdf6 Jun 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf5 Jun 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf5 Jun 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY 31-03-2025.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION QUATERLY PROGRESS.pdf5 Jun 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf5 Jun 2025
Form 2File: FORM 2 ENGINEER CERTIFCATE.pdf5 Jun 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY 31122024.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION QUATERLY PROGRESS.pdf5 Jun 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf5 Jun 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf5 Jun 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSLOD INVENTORY.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION QUATERLY PROGRESS.pdf5 Jun 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf5 Jun 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf5 Jun 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSLOD INVENTORY.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION QUATERLY PROGRESS.pdf5 Jun 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf5 Jun 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf5 Jun 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSLOD INVENTORY.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION QUATERLY PROGRESS.pdf5 Jun 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf5 Jun 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf5 Jun 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSLOD INVENTORY.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION QUATERLY PROGRESS.pdf5 Jun 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf5 Jun 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf5 Jun 2025
Form 1File: FORM 1-ARCHITECT CERTIFICATE.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION QUATERLY PROGRESS.pdf5 Jun 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf5 Jun 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf5 Jun 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION QUATERLY PROGRESS.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY 31-03-2023.pdf5 Jun 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf5 Jun 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf5 Jun 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY 31-03-2023.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION QUATERLY PROGRESS.pdf5 Jun 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE -01-10-2024.pdf5 Jun 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf5 Jun 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSLOD INVENTORY.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION QUATERLY PROGRESS.pdf5 Jun 2025
Form 5 (FY 2022-2023)File: FORM 5-2022-23.pdf5 Jun 2025
Form 5 (FY 2023-2024)File: FORM 5-2023-24.pdf5 Jun 2025
Form 5 (FY 2024-2025)File: Form-5-2024-25.pdf5 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY 31-03-2025.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE -A B ASSOCIATE.pdf26 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf28 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFCATE.pdf28 Feb 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY 25022025.pdf28 Feb 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY 31122024.pdf28 Feb 2025
Declaration in FORM BFile: AFFIDAVIT FORM B.pdf26 Nov 2024
Other - LegalFile: SCHEDULE OF BALANCE WORK COMPLETION.pdf26 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD AND UNSLOD INVENTORY.pdf22 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER CERTIFICATE QUALITY ASSURANCE 2023-24.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf6 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 CA CERTIFICATE.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD AND UNSLOD INVENTORY.pdf20 Jul 2024

How this compares with Pune

88%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 10 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Adhish Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

Builder: A B Associates

A B Associates has 2 registrations on MahaRERA, including Ganraya Heights and Adhish Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Adhish Residency is delayed beyond 30 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Adhish Residency?

The registered promoter entity is A B Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Adhish Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Adhish Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Adhish Residency?

The professionals named in the filing: Architect: SAWAN CHANDAK; Engineer: KALYANI SUNIL JADHAV; Chartered Accountant: GANESH PRABHAKAR DHINDLE; Chartered Accountant: MILIND PADMAKAR TILWANKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Adhish Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Adhish Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Adhish Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.