Red flags

  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 15.00 crore secured on the land, in favour of Aditya Birla Capital Limited

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
71 of 154Construction stages doneacross 14 buildings; furthest along: External plumbing and external plaster, 99%
4 of 10Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

ACE VILLAS is a Residential / Group Housing project by JHAMTANI REALTY PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100048327 on 26 Dec 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 6 of the 10 units on this registration are recorded sold or booked, and 71 of 154 construction stages are filed complete.

At a glance

Project

  • NameACE VILLAS
  • TypeResidential / Group Housing
  • Location
    • Ghorpadi Road
    • Mundhwa
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100048327
  • ReraGenie IDRG-MH-68425

Builder

  • NameJHAMTANI REALTY PRIVATE LIMITED
  • Entity typeCompany
  • CINU70200PN2018PTC176558
  • GSTIN27AAECJ2550P1Z7
  • DirectorsANUP PARMANAND JHAMTANI, PARMANAND MELHUMAL JHAMTANI
  • DirectorDAYAL SHYAMLAL JESWANI
  • Other registrations12 more →
  • Completed5 of 13
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredDec 2022First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Dec 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings14 building records
  • Documents filed129 files

Current status

60%6 of 10 units booked
78.6%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Row House No 01NA64101
Row House No 02NA66101
Row House No 03NA66101
Row House No 04NA66101
Row House No 05NA66101
Row House No 06NA66101
Row House No 07NA66101
Row House No 08NA60101
Row House No 09 and Row House No 10NA50101
Villa No 0NA00000
Row House No 11 and Row House No 12NA50101
Villa No 0NA00000
Villa No 0NA00000
Villa No 0NA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building14

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

71 of 154 construction stages are filed complete across 14 buildings. The stage furthest along is External plumbing and external plaster, at 99%.

Row House No 0169%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.56%
Row House No 0279%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Row House No 0367%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.61%
Row House No 0478%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.62%
Row House No 0578%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.62%
Row House No 0678%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.62%
Row House No 0769%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.61%
Row House No 0869%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.61%
Row House No 09 and Row House No 1077%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises88%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.56%
Villa No 00%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Row House No 11 and Row House No 1266%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%
Villa No 00%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Villa No 00%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Villa No 00%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered11
Open Space21
BuildingClosed/CoveredOpen SpaceTotal
Row House No 01123
Row House No 02123
Row House No 03123
Row House No 04123
Row House No 05123
Row House No 06123
Row House No 07123
Row House No 08123
Row House No 09 and Row House No 10123
Row House No 11 and Row House No 12235

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,961 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 15.00 crore
CERSAI search filedYes
Declared on22 May 2026
LandownerVillageDistrict
DUSK REALTY LLPMundhawaPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI9190.54
Proposed, not sanctioned5,191 sq m
Buildings approved14
Buildings sanctioned14

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShow Room Office No 4 Gr Floor And Mezzanine Floor B Wing G O Square Wakad Pimpri Chinchwad 411057
Estimated costRs 43.58 cr
Cost incurredRs 34.27 cr
Work done78.63%
BuildingWingEstimatedIncurred
Row House No 01NARs 39.98 crRs 33.48 cr
-NARs 3.61 crRs 78.45 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVKa Architecture
EngineerPRANAV SHANTARAM PATIL
EngineerNARENDRA GOSAVI
Chartered AccountantRavi Talreja and Associates
Chartered AccountantCMRS & ASSOCIATESS LLP
PartnerRole in project
JHAMTANI REALTY PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA18122518751Dec 2025 → Dec 2026

Reason as filed by the promoterWe are on the verge of Completing the work for all the Sold Villas in the Project, but some internal work for the Unsold Villas are still pending. Hence, an extension is required.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Ace Villas Form 1.pdf20 Jul 2026
Withdrawal Update Form 2File: Ace Villas Form 2.pdf20 Jul 2026
Withdrawal Update Form 3File: ACE VILLAS FORM-3 26-27 Q1.pdf20 Jul 2026
Withdrawal Update Form 1File: Ace Villas Form-1.pdf22 Apr 2026
Withdrawal Update Form 2File: Ace Villas Form-2.pdf22 Apr 2026
Withdrawal Update Form 3File: Ace Villas Form-3 Q4 25-26..pdf22 Apr 2026
Withdrawal Update Form 1File: Ace Villas Form 1 Q3 25-26.pdf20 Jan 2026
Withdrawal Update Form 2File: Ace Villas Form 2 Q3 25-26.pdf20 Jan 2026
Withdrawal Update Form 3File: ACE VILLAS FORM 3 Q3.pdf20 Jan 2026
Form 2A (FY 2022-2023)File: Form 2A 22-23.pdf19 Dec 2025
Form 5 (FY 2022-2023)File: Form 5 22-23 Ace Villas.pdf19 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf18 Dec 2025
Form 5 (FY 2024-2025)File: ACE VILLAS FORM5 2024-25 (1).pdf17 Dec 2025
Withdrawal Update Form 1File: Ace Villas Form 1.pdf20 Oct 2025
Withdrawal Update Form 1File: ACE_Scanner_2025_10_20[1].pdf20 Oct 2025
Withdrawal Update Form 2File: Ace Villas.pdf20 Oct 2025
Withdrawal Update Form 2File: Ace Villas.pdf20 Oct 2025
Withdrawal Update Form 3File: ACE VILLAS FORM 3 Q2.pdf20 Oct 2025
Withdrawal Update Form 3File: ACE VILLAS FORM 3 Q2.pdf20 Oct 2025
Withdrawal Update Form 1File: Ace Villas Form 1.pdf22 Jul 2025
Withdrawal Update Form 2File: Ace Villas Form 2.pdf22 Jul 2025
Withdrawal Update Form 3File: Ace Villas Form 3.pdf22 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ace Villas.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ACE VILLAS FORM 3 Q3 24-25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ace Villa_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ace Villas.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: 8) ACE VILLAS -.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ACE VILLAS.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ACE VILLAS.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ACE VILLAS.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Ace Villas.pdf18 Jan 2025
Layout approvalFile: 1 of 7.pdf13 Jan 2025
Building plan approvalFile: 1 of 7.pdf13 Jan 2025
Building plan approvalFile: 2 of 7.pdf13 Jan 2025
Building plan approvalFile: 3 of 7.pdf13 Jan 2025
Building plan approvalFile: 4 of 7.pdf13 Jan 2025
Building plan approvalFile: 5 of 7.pdf13 Jan 2025
Building plan approvalFile: 6 of 7.pdf13 Jan 2025
Building plan approvalFile: 7of 7.pdf13 Jan 2025
Copy of Layout Approval (in case of layout)File: 1 of 7.pdf13 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf13 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 2 of 7.pdf13 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 7of 7.pdf13 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 6 of 7.pdf13 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 5 of 7.pdf13 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 4 of 7.pdf13 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 3 of 7.pdf13 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 1 of 7.pdf13 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ACE VILLAS FORM 5 2023-24.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ACE VILLAS.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ACE VILLAS FORM-3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ACE VILLAS.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: ACE VILLAS.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: ACE VILLAS.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ace Villas.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ACE VILLAS.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ACE VILLAS.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Ace Villas.pdf24 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ace Villas.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ACE VILAS.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Ace Villas.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ACE VILAS.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Ace Villas.pdf3 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ace Villas Form 3.pdf27 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ACE Villas Form 1.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ACE Villas Form 1.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ace Villas Form 1.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ACE VILLAS FORM - 1.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ACE VILLAS.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ACE VILLAS FORM 3.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ACE VILLAS MAR 23.pdf27 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JRPL ACE VILLAS DSC_11zon.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ace Villa.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Villas.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ACE Villas.pdf7 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ace Villas.pdf7 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ace Villas.pdf6 Jul 2023
Details of encumbrances concerned to FinanceFile: Self Declaration Regarding Encumbrance 14 06 2023.pdf26 Jun 2023
Details of encumbrances concerned to LegalFile: Self Declaration Regarding Encumbrance 14 06 2023.pdf26 Jun 2023
Building plan approvalFile: SHEET 1-7 DT 04 05 23_11zon.pdf3 Jun 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ACE AURUM III TOWER 01SURVEY NO 45 HISSA NO 1 OF 1 RAVET28CompletedDec 2024Apr 2024

How this compares with Pune

60%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ACE VILLAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mundhwa13,700+ in Pune

2 kmACE VILLASCompleted 71Lapsed / revoked 24Other 102Dot size: filed unitsN

Filed coordinates, straight-line distance. 197 registered projects within 2 km.

Builder: JHAMTANI REALTY PRIVATE LIMITED

JHAMTANI REALTY PRIVATE LIMITED has 13 registrations on MahaRERA, including ACE AURUM III TOWER 04 and ACE AURUM III TOWER 05. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ACE VILLAS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ACE VILLAS?

The registered promoter entity is JHAMTANI REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U70200PN2018PTC176558 and GSTIN 27AAECJ2550P1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ACE VILLAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ACE VILLAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ACE VILLAS?

The professionals named in the filing: Architect: VKa Architecture; Engineer: PRANAV SHANTARAM PATIL; Engineer: NARENDRA GOSAVI; Chartered Accountant: Ravi Talreja and Associates; Chartered Accountant: CMRS & ASSOCIATESS LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ACE VILLAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ACE VILLAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ACE VILLAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.