Home / Browse projects / Aurangabad, Maharashtra / ABK AURIX

Registered No litigation declared Others project

ABK AURIX

By Gopal Balaprasad Ajmera

RG-MH-18941 · RERA P51500077895 · Last updated on MahaRERA portal: 9 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
11 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
88 of 95Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

ABK AURIX is a Others project by Gopal Balaprasad Ajmera in Aurangabad, Maharashtra, registered with MahaRERA as P51500077895 on 13 Nov 2024. Possession is promised by 31 Dec 2027. 7 of the 95 units on this registration are recorded sold or booked, and 11 of 33 construction stages are filed complete.

At a glance

Project

  • NameABK AURIX
  • TypeOthers
  • Location
    • Gut no. 22/Part
    • Mauje Shahnoorwadi
    • Shahnoorwadi
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431005
  • Pincode431005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500077895
  • ReraGenie IDRG-MH-18941

Builder

  • NameGopal Balaprasad Ajmera
  • Entity typeIndividual
  • GSTIN27AAJPA2111R2ZQ

Key dates

this monthRegisteredNov 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Nov 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed48 files

Current status

7%7 of 95 units booked
31.9%Work done, per cost certificate

Figures as on 9 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK CNA8828028
BLOCK BNA9928028
BLOCK ANA8803939

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

BLOCK C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLOCK B46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLOCK A75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed103

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots103
Closed/Covered103
BuildingClosed/CoveredTotal
BLOCK C3030
BLOCK B5858
BLOCK A1515

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,961 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Sep 2025

Approvals and building plan

Sanctioning authorityAurangabad Municipal Corporation
Permissible FSI8975.59
Proposed, not sanctioned8,976 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR PLOT NO 8 AND 9 JANKI AVENUE LAXMI NAGAR SHIVAJI NAGAR ROAD NEAR SUTGIRINI CHOWK GARKHEDA AURANGABAD 431001
Estimated costRs 16.50 cr
Cost incurredRs 5.26 cr
Work done31.87%
BuildingWingEstimatedIncurred
BLOCK ANARs 6.00 crRs 4.35 cr
BLOCK CNARs 4.25 cr-
BLOCK BNARs 4.25 crRs 45.87 lakh
-NARs 2.00 crRs 45.29 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANOJ KALA
EngineerSAMEER SANJAY KUMAWAT SANJAY KUMAWAT
EngineerShripad Deshmukh And Associates
Chartered AccountantSONAM NAGAR
Chartered AccountantYASH NAGAR
Chartered AccountantAlkesh Rawka And Associates
PartnerRole in project
Gopal Balaprasad Ajmera-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 2026-27 Q1.pdf9 Jul 2026
Withdrawal Update Form 2File: Form 2 2026-27 Q1.pdf9 Jul 2026
Withdrawal Update Form 3File: Form 3 2026-27 Q1.pdf9 Jul 2026
Withdrawal Update Form 1File: abk FORM 1.pdf30 Jun 2026
Withdrawal Update Form 1File: abk FORM 1.pdf30 Jun 2026
Withdrawal Update Form 1File: abk FORM 1.pdf30 Jun 2026
Withdrawal Update Form 2File: ABK FROM 2.pdf30 Jun 2026
Withdrawal Update Form 2File: ABK FROM 2.pdf30 Jun 2026
Withdrawal Update Form 2File: ABK FROM 2.pdf30 Jun 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q1.pdf30 Jun 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q1.pdf30 Jun 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q1.pdf30 Jun 2026
Withdrawal Update Form 1File: abk FORM 1.pdf2 Sep 2025
Withdrawal Update Form 2File: ABK FROM 2.pdf2 Sep 2025
Withdrawal Update Form 3File: Form 3 2025-26 Q1.pdf2 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_UPLOAD.pdf25 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: REVISED APPENDIX F.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf22 Oct 2024
Declaration about Commencement CertificateFile: FINAL CC DECLARATION.pdf22 Oct 2024
CERSAI detailsFile: Promoter of self undertaking regarding non creation of security interest.pdf21 Oct 2024
Other - TechnicalFile: Annexure A.pdf21 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Screenshot.pdf14 Oct 2024
Copy of the legal title reportFile: format A Legal Report.pdf11 Oct 2024
Details of encumbrances concerned to FinanceFile: Details of encomburance concerned to legal_1.pdf11 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbarance certificate_page-0001.pdf11 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: format A bank.pdf11 Oct 2024
Details of encumbrances concerned to LegalFile: Details of encomburance concerned to legal_1.pdf11 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbarance certificate_page-0001.pdf11 Oct 2024
Proforma of Agreement for saleFile: Model Aggrement to sale with annex_1.pdf11 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: format B Bank Account.pdf11 Oct 2024
Building plan approvalFile: Building Plan 3.pdf10 Oct 2024
Building plan approvalFile: Building Plan 2_UPLOAD.pdf10 Oct 2024
Building plan approvalFile: Building Plan 1_UPLOAD.pdf10 Oct 2024
Layout approvalFile: Layout.pdf10 Oct 2024
PAN CardFile: Gopal Ajmera PAN.pdf10 Oct 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf10 Oct 2024
Proforma of Allotment letterFile: Model form of Allotment letter_New_upload.pdf10 Oct 2024
Declaration in FORM BFile: Form B.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: final form 2.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Comencement Cerificate.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2_UPLOAD.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1_UPLOAD.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 3.pdf10 Oct 2024
CERSAI detailsFile: CERSAI_Search_Report_200323688061_For_Asset_Based_Search_10_10_2024_14_49_55_675.pdf10 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation report with respect to allotment letter.pdf10 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report with respect to model copy agreement.pdf10 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouse of interest in other real estasted oraganation.pdf10 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Secured unsceured.pdf10 Oct 2024

How this compares with Aurangabad

7%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep ABK AURIX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shahnoorwadi1,400+ in Aurangabad

2 kmABK AURIXCompleted 25Lapsed / revoked 19Other 49Dot size: filed unitsN

Filed coordinates, straight-line distance. 93 registered projects within 2 km.

Builder: Gopal Balaprasad Ajmera

Gopal Balaprasad Ajmera has 1 registration on MahaRERA, including ABK AURIX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if ABK AURIX is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ABK AURIX?

The registered promoter entity is Gopal Balaprasad Ajmera, an individual as per the filing. Its GSTIN 27AAJPA2111R2ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ABK AURIX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ABK AURIX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ABK AURIX?

The professionals named in the filing: Architect: MANOJ KALA; Engineer: SAMEER SANJAY KUMAWAT SANJAY KUMAWAT; Engineer: Shripad Deshmukh And Associates; Chartered Accountant: SONAM NAGAR; Chartered Accountant: YASH NAGAR; Chartered Accountant: Alkesh Rawka And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ABK AURIX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ABK AURIX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ABK AURIX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.