Home / Browse projects / Pune, Maharashtra / Abhiruchi MHADA 3
Abhiruchi MHADA 3
By PARANJAPE SCHEMES (CONSTRUCTION) LTD
RG-MH-56897 · RERA P52100051322 · Last updated on MahaRERA portal: 30 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Abhiruchi MHADA 3 is a Residential / Group Housing project by PARANJAPE SCHEMES (CONSTRUCTION) LTD in Pune, Maharashtra, registered with MahaRERA as P52100051322 on 8 Jun 2023. Possession is promised by 1 May 2028. 58 of the 110 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameAbhiruchi MHADA 3
- TypeResidential / Group Housing
- Location
- Narhe Road
- Dhayari
- Dhayari (Part)
- Haveli
- Pune
- 411041
- Pincode411041
- RERA no.P52100051322
- ReraGenie IDRG-MH-56897
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Jun 2023
- Promised completion1 May 2028
- Revised completionNone
- Buildings1 building record
- Documents filed54 files
Current status
Figures as on 30 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| M3 | NA | 6 | 6 | 110 | 0 | 110 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.
M3: 49% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed330
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership21
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Kaluram Bala Pokale | Vileparle | Mumbai Suburban |
| Smt. Chandrabhaga Kaluram Pokale | Vileparle | Mumbai Suburban |
| Balasaheb Kaluram Pokale | Vileparle | Mumbai Suburban |
| Smt. Pushpa Balasaheb Pokale | Vileparle | Mumbai Suburban |
| Nilesh Balasaheb Pokale | Vileparle | Mumbai Suburban |
| Smt. Sakshi Nilesh Pokale | Vileparle | Mumbai Suburban |
| Shailesh Balasaheb Pokale | Vileparle | Mumbai Suburban |
| Smt. Vaishali Tukaram alias Baba Tupe | Vileparle | Mumbai Suburban |
| Smt. Rupali Vijay Dabhade | Vileparle | Mumbai Suburban |
| Rajaram Kaluram Pokale | Vileparle | Mumbai Suburban |
| Smt. Asha Rajaram Pokale | Vileparle | Mumbai Suburban |
| Dinesh Rajaram Pokale | Vileparle | Mumbai Suburban |
| Yogesh Rajaram Pokale | Vileparle | Mumbai Suburban |
| Smt. Dipali Nitin Balwadkar | Vileparle | Mumbai Suburban |
| Smt. Shaila Sunil Pokale | Vileparle | Mumbai Suburban |
| Smt. Parvati alias Kamal Subhash Ghule | Vileparle | Mumbai Suburban |
| Tarabai Kaluram Pokale | Vileparle | Mumbai Suburban |
| Smt. Sunita Shankar Mule | Vileparle | Mumbai Suburban |
| Mohaniraj Co-Operative Housing Society Ltd | Vileparle | Mumbai Suburban |
| Ritesh Sunil Pokale | Vileparle | Mumbai Suburban |
| Vrushali Sunil Pokale | Vileparle | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| M3 | NA | Rs 14.82 cr | Rs 4.32 cr |
| - | NA | Rs 2.03 cr | Rs 11.48 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aniruddha Vaidya & Associates |
| Architect | Aniruddha Vaidya And Associates |
| Engineer | Shekhar Pingale |
| Engineer | Deepali Desai |
| Chartered Accountant | CA Rutuja Narsingh and Associates |
| Chartered Accountant | Kapure and Kapure Chartered Accountant |
| Partner | Role in project |
|---|---|
| PARANJAPE SCHEMES (CONSTRUCTION) LTD | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 10040/2018/2018 | Bombay High Court | Matter is kept for hearing Matter will be as per sitting list |
| 10041/2018/2018 | Bombay High Court | Matter is kept for hearing Matter will be as per sitting list |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 May 2028
Documents filed54
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 30 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 30 May 2026 |
| Withdrawal Update Form 3File: Form 3 June 25 .pdf | 30 May 2026 |
| Form 5 (FY 2024-2025)File: Form 5_Abhiruchi Mhada 3.pdf | 8 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Abhiruchi Mhada 3-Mar'25-uploaded.pdf | 8 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Abhiruchi Parisar M3-Mar'25-uploaded.pdf | 8 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera form2 Abhiruchi Mhadha M3 DEC 24 Signoff-compressed-uploaded.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Reprt-Abhiruchi Mhada 3-Dec'24-uploaded.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Abhiruchi Mhada 3-Dec'24-uploaded.pdf | 15 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-Abhiruchi Mhada 3-Sept'24-uploaded.pdf | 24 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure-Abhiruchi Mhada-3-Sept'24-uploaded.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Abhiruchi Mhada 3-Sept'24-uploaded.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Abhiruchi Parisar M3-Sept'24-uploaded.pdf | 17 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 -Mhada 3-FY-'23-24-uploaded.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure-Sold-Unsold-Abhiruchi Mhada 3-June'24-uploaded.pdf | 15 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Form 2- Abhiruchi M3-June'24-uploaded.pdf | 6 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15 Abhiruchi Mhada 3-FORM 1-June'24-uploaded.pdf | 4 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Report-Abhiruchi MHADA 3-Mar'24-compressed-uploaded.pdf | 15 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Abhiruchi Mhada 3-Mar'24-uploaded.pdf | 12 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- ABHIRUCHI M3-Mar'24-uploaded.pdf | 4 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Abhiruchi MHADA 3-30Sept23.pdf | 7 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Abhiruchi Mhada -Dec 23.pdf | 7 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Abhiruchi Mhada 3-July to Sept'23.pdf | 27 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Abhiruchi Mhada 3-July to Sept'23.pdf | 27 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhiruchi MHADA 3-FORM 2-30June'23-uploaded.pdf | 21 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhiruchi MHADA 3-FORM 2-30Sept'23-uploaded.pdf | 21 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhiruchi MHADA 3-FORM 2-31December23-uploaded.pdf | 21 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Abhiruchi Mhada 3-Sept'23-uploaded.pdf | 20 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Abhiruchi Mhada 3- Dec'23-uploaded.pdf | 20 Feb 2024 |
| Other - LegalFile: Deed of Assignment_5077-2015_28-04-2015_PSCL_PEDPL_compressed.pdf | 31 May 2023 |
| Proforma of Agreement for saleFile: AFS_Abhiruchi Mhada 3 fINAL.pdf | 19 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: AFS -Deviation Report - Abhiruchi Mhada 3-17May2023-Scrutiny_11zon.pdf | 19 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (6).pdf | 15 May 2023 |
| Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (27).pdf | 18 Apr 2023 |
| Building plan approvalFile: Abhiruchi Plan 2nd page_compressed (1).pdf | 18 Apr 2023 |
| Building plan approvalFile: Abhiruchi Plan 3rd page_compressed.pdf | 18 Apr 2023 |
| Copy of the legal title reportFile: Title Report Abhiruchi Mhada 3.pdf | 18 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance- Finance-Abhiruchi MAHDA 3.pdf | 18 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrances-Legal-Abhiruchi Mhada 3.pdf | 18 Apr 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrance- Finance-Abhiruchi MAHDA 3.pdf | 18 Apr 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrances-Legal-Abhiruchi Mhada 3.pdf | 18 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (27).pdf | 18 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Abhiruchi Plan 2nd page_compressed (1).pdf | 18 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Abhiruchi Plan 3rd page_compressed.pdf | 18 Apr 2023 |
| Declaration in FORM BFile: Form B- Abhiruchi Mhada 3.pdf | 18 Apr 2023 |
| CERSAI detailsFile: CERSAI Declaration-Abhiruchi MHADA 3.pdf | 18 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 -Abhiruchi Mhada 3.pdf | 18 Apr 2023 |
| Proforma of Allotment letterFile: Allotment Letter_Abhiruchi Mhada 3_Paranjape schemes (constructions) ltd.pdf | 18 Apr 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report -Allotment-Abhiruchi MHADA 3.pdf | 18 Apr 2023 |
| Other - TechnicalFile: Plot Area confirmation-Abhiruchi MHADA 3.pdf | 18 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A -Delaration -Bank Account-Abhiruchi MHADA 3.pdf | 12 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_11zon.pdf | 7 Apr 2023 |
| Declaration about Commencement CertificateFile: Format D-Declartion about commencement-Abhiruchi MHADA 3.pdf | 7 Apr 2023 |
| PAN CardFile: PSCL-PAN.pdf | 5 Apr 2023 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| 127 UPPER EASTP51800000454 | Andheri, Mumbai Suburban | - | Jul 2017 | Completed | Jun 2024Registered original: Dec 2019 | Jan 1970 |
| PRATHAM RESIDENTIAL | 727 SADASHIV PETH KUMTHEKAR ROAD PUNE 411030 | 35 | - | Completed | Apr 2016 | Mar 2016 |
| THE BUSINESS HUB | SURVEY NO25 HISSA NO 29 HISSA NO 1 KOTHRUD PUNE 411029 | 86 | - | Completed | Jan 2016 | Nov 2015 |
| MADHUKOSH - III | SNo4 HISSA NO 2 SNO 16 AND 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune | 258 | - | Completed | Aug 2015 | Aug 2015 |
| PRATHAM COMMERCIAL | 727 SADASHIV PETH KUMTHEKAR ROAD PUNE 411030 | 32 | - | Completed | Jun 2015 | Apr 2015 |
| PUNARVASU | PRABHAT ROAD ERANDWANE PUNE 411004 | 10 | - | Completed | Dec 2014 | Late, Jun 2015 |
| MADHUKOSH - II | SNo4 HISSA NO 2 SNO 16 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune | 150 | - | Completed | Dec 2013 | Oct 2013 |
| MADHUKOSH - I | SNo 4 HISSA NO 2 SNO 16 AND 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune | 289 | - | Completed | Mar 2012 | Feb 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 28 other registrations, which the RERA portal never shows together
- All 54 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Abhiruchi MHADA 3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dhayari13,700+ in Pune
VYANA PHASE-I -T5, T6, T7
KOLTE-PATIL DEVELOPERS LIMITED
Pratham Vihar Phase I
LJR Constructions LLP
VYANA PHASE-I-T2,T3 AT THE RESERVE
KOLTE-PATIL DEVELOPERS LIMITED
MAITREE MEGA CITY
MAITREE INFRA
RAMANA MYRA
SAI AND SHANTISHOBHA VENTURE
Apple Regency
Sri Sidhievinayak associetes
Builder: PARANJAPE SCHEMES (CONSTRUCTION) LTD
PARANJAPE SCHEMES (CONSTRUCTION) LTD has 29 registrations on MahaRERA, including SWAPNASAMRAT and Blue Ridge Project C Land T18 and T19. Its filings disclose 17 earlier MahaRERA projects: declares 9 of 17 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Abhiruchi MHADA 3 is delayed beyond 1 May 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Abhiruchi MHADA 3?
The registered promoter entity is PARANJAPE SCHEMES (CONSTRUCTION) LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Abhiruchi MHADA 3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Abhiruchi MHADA 3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Abhiruchi MHADA 3?
The professionals named in the filing: Architect: Aniruddha Vaidya & Associates; Architect: Aniruddha Vaidya And Associates; Engineer: Shekhar Pingale; Engineer: Deepali Desai; Chartered Accountant: CA Rutuja Narsingh and Associates; Chartered Accountant: Kapure and Kapure Chartered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Abhiruchi MHADA 3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback