Home / Browse projects / Nashik, Maharashtra / Aashirwad
Aashirwad
RG-MH-36990 · RERA P51600051638 · Last updated on MahaRERA portal: 8 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Aashirwad is a Others project by Malpure Group in Nashik, Maharashtra, registered with MahaRERA as P51600051638 on 27 Jun 2023. Possession is promised by 1 May 2027. 11 of the 27 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameAashirwad
- TypeOthers
- Location
- Dadasaheb Vadnagare Road
- Thatte Nagar
- Opp. DS Tailors
- Patil Colony
- Nashik (M Corp.)
- Nashik
- 422005
- Pincode422005
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600051638
- ReraGenie IDRG-MH-36990
Builder
- NameMalpure Group
- Entity typePartnership
- PartnersAbhishek Shashikant Malpure, Shashikant Jagannath Wani, Aditya Shashikant Malpure, Sunita Shashikant Wani
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Jun 2023
- Promised completion1 May 2027
- Revised completionNone
- Buildings1 building record
- Documents filed117 files
Current status
Figures as on 8 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Aashirwad | NA | 4 | 4 | 0 | 27 | 27 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
Aashirwad: 77% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed69
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Mr. Sunil V Khune | Nashik (M Corp.) | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Aashirwad | NA | Rs 8.00 cr | Rs 7.60 cr |
| - | NA | Rs 2.00 cr | Rs 1.90 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. Shruti Malpure-Shirode |
| Engineer | Er. Audumber Wani |
| Engineer | Abhishek Shashikant Malpure |
| Chartered Accountant | CA Paresh Sabadra |
| Chartered Accountant | S S MAntri & Co |
| Chartered Accountant | P H Mehta & Co. |
| Partner | Role in project |
|---|---|
| Malpure Group | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 May 2027
Documents filed117
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate_Sept 25.pdf | 8 May 2026 |
| Withdrawal Update Form 1File: Architect Certificate_Sept 25.pdf | 8 May 2026 |
| Withdrawal Update Form 2File: Engineer Certificate_Sept 25.pdf | 8 May 2026 |
| Withdrawal Update Form 2File: Engineer Certificate_Sept 25.pdf | 8 May 2026 |
| Withdrawal Update Form 3File: CA Sept 25.pdf | 8 May 2026 |
| Withdrawal Update Form 3File: CA Sept 25.pdf | 8 May 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 26 1.pdf | 8 May 2026 |
| Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf | 8 May 2026 |
| Withdrawal Update Form 1File: Architect Certificate_Sept 25.pdf | 31 Oct 2025 |
| Withdrawal Update Form 2File: Engineer Certificate_Sept 25.pdf | 31 Oct 2025 |
| Withdrawal Update Form 3File: CA Sept 25.pdf | 31 Oct 2025 |
| Form 1File: Architect.pdf | 14 Jul 2025 |
| Form 2File: Engineer March 24.pdf | 14 Jul 2025 |
| Form 3File: March 24 CA.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf | 14 Jul 2025 |
| Form 1File: Architect.pdf | 14 Jul 2025 |
| Form 2File: Engineer.pdf | 14 Jul 2025 |
| Form 3File: CA.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 14 Jul 2025 |
| Form 1File: Architect.pdf | 14 Jul 2025 |
| Form 2File: engineer.pdf | 14 Jul 2025 |
| Form 3File: CA.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 14 Jul 2025 |
| Form 1File: Architect Certificate_June 24.pdf | 12 Jul 2025 |
| Form 2File: Engineer Certificate_June 24.pdf | 12 Jul 2025 |
| Form 3File: CA Certificate Signed_June 2024.pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Aashirwad - June 2024.pdf | 12 Jul 2025 |
| Form 1File: Architect Certificate_Sept 24.pdf | 12 Jul 2025 |
| Form 2File: ER - Sept 24.pdf | 12 Jul 2025 |
| Form 3File: CA - Sept 24.pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Aashirwad - Sept 2024.pdf | 12 Jul 2025 |
| Form 1File: Architect Certificate_Dec 24 OK.pdf | 12 Jul 2025 |
| Form 2File: Engineer Certificate_Dec 24.pdf | 12 Jul 2025 |
| Form 3File: Form 3 31122024.pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Aashirwad.pdf | 12 Jul 2025 |
| Form 1File: Architect Certificate_Mar 25 - Signed.pdf | 12 Jul 2025 |
| Form 2File: Engineer Certificate_Mar 25 - Signed.pdf | 12 Jul 2025 |
| Form 3File: CA Certificate.pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Aashirwad Mar 2025 - Signed.pdf | 12 Jul 2025 |
| Form 5 (FY 2023-2024)File: Form 5 Malpure.pdf | 12 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 5 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Mar 25 - Signed.pdf | 2 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 2 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Mar 25 - Signed.pdf | 2 May 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Aashirwad Mar 2025 - Signed.pdf | 2 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Mar 25 - Signed.pdf | 26 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 26 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Mar 25 - Signed.pdf | 26 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Aashirwad Mar 2025 - Signed.pdf | 26 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Dec 24 OK.pdf | 6 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122024.pdf | 6 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Dec 24.pdf | 6 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Aashirwad.pdf | 6 Feb 2025 |
| Layout approvalFile: Final Plan - Aashirwad(MALPURE GROUP).pdf | 27 Nov 2024 |
| Building plan approvalFile: Final Plan - Aashirwad(MALPURE GROUP).pdf | 27 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Final Plan - Aashirwad(MALPURE GROUP).pdf | 27 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Oct 24.pdf | 27 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Sept 2024 Revised.pdf | 27 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Oct 2024.pdf | 27 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Oct 24.pdf | 27 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Final Commencement Letter (Aashirwad - Malpure Group).pdf | 27 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Final Plan - Aashirwad(MALPURE GROUP).pdf | 27 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure -Sep 24.pdf | 27 Nov 2024 |
| Declaration about Commencement CertificateFile: Form D.pdf | 27 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A -Quality Assurance Certificate.pdf | 27 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Malpure F Y 23-24.pdf | 27 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Sept 24.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Signed_Sept 2024.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Sept 24.pdf | 18 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Malpure F Y 23-24.pdf | 18 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Aashirwad - Sept 2024.pdf | 13 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_June 24.pdf | 18 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Signed_June 2024.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_June 24.pdf | 18 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Aashirwad - June 2024.pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Dec 23.pdf | 23 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Mar 24.pdf | 23 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Dec 23.pdf | 23 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Mar 24.pdf | 23 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec 2023 - Signed.pdf | 23 Apr 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 117 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Aashirwad on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Opp. DS Tailors, Patil Colony4,100+ in Nashik
Filed coordinates, straight-line distance. 133 registered projects within 2 km.
SHREEJI EXCELENCIA
SHREEJI DEVELOPERS
HARI VASANT
Hari Vasant Association of Allottees
NATHSEETA YEOLEKAR COMPLEX
DEEPAK INFRA AND HOMES PRIVATE LIMITED
Aaradhya Nakshatra
SHREYASH BUILDCON
Shri Ram Kunj
shree balaji developers
SAI COURT
JAY WIN DEVELOPERS
See every Nashik project, with the district possession charts
Builder: Malpure Group
Malpure Group has 1 registration on MahaRERA, including Aashirwad. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Aashirwad is delayed beyond 1 May 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Aashirwad?
The registered promoter entity is Malpure Group, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Aashirwad?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Aashirwad?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Aashirwad?
The professionals named in the filing: Architect: Ar. Shruti Malpure-Shirode; Engineer: Er. Audumber Wani; Engineer: Abhishek Shashikant Malpure; Chartered Accountant: CA Paresh Sabadra; Chartered Accountant: S S MAntri & Co; Chartered Accountant: P H Mehta & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Aashirwad?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback