AARYA ONE

By ARYAN DEVELOPERS

RG-MH-05141 · RERA P51700050409 · Last updated on MahaRERA portal: 27 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 10%
53 of 65Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

AARYA ONE is a Others project by ARYAN DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700050409 on 12 Apr 2023. Possession is promised by 30 Apr 2027. The completion date has moved by 12 months from the original filing. 12 of the 65 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameAARYA ONE
  • TypeOthers
  • Location
    • MANPADA ROAD NEAR STAR COLONY DOMBIVLI EAST
    • NEAR SHARDA MUKAMBIKA HOTEL NANDIVALI TARFE PANCHANAND
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700050409
  • ReraGenie IDRG-MH-05141

Builder

  • NameARYAN DEVELOPERS
  • Entity typePartnership
  • GSTIN27ABXFA9512B1ZA
  • PartnerSHWETA BABLI CHAVAN
  • Other registrations6 more →
  • Completed2 of 7
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredApr 2023First promiseApr 2026Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Apr 2023
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 30 Apr 2026)
  • Buildings1 building record
  • Documents filed70 files

Current status

18%12 of 65 units booked
49.6%Work done, per cost certificate

Figures as on 27 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AARYA ONENA151556965

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 10%.

AARYA ONE: 37% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered36

Land and ownership26

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,004 sq m
Land owned byThe promoter, with other names on the file
Named landowners26
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Jun 2026
LandownerVillageDistrict
PRAKASH MAVANIMumbai CityMumbai City
SHAILESH MAVANIDOMBIVLIThane
VEERCHAND MAVANIDOMBIVLIThane
MAHENDRA DAREKARDOMBIVLIThane
PARMINDAR HARJAIDOMBIVLIThane
NIRMALA BHANUSHALIDOMBIVLIThane
SANJEEV PETKARDOMBIVLIThane
ASHOK SHETTYDOMBIVLIThane
SUSHMA KHATAWKARDOMBIVLIThane
YOGESH KOTHARIDOMBIVLIThane
RAJENDRA UNDVIYADOMBIVLIThane
ANIL PETKARDOMBIVLIThane
SWATI PETKARDOMBIVLIThane
KUNAL KULKARNIDOMBIVLIThane
RAMESH NAGAMDOMBIVLIThane
PRITI MAHAJANDOMBIVLIThane
AMRUTA MAVANIDOMBIVLIThane
MEENA MAVANIDOMBIVLIThane
GAYATRI MAVANIDOMBIVLIThane
RASHMITA MAVANIDOMBIVLIThane
JAYANTI HALDIPURKARDOMBIVLIThane
SUHAS HALDIPURKARDOMBIVLIThane
SUSHMA PETKARDOMBIVLIThane
VIMAL BNHINDEDOMBIVLIThane
SMITA KOTHARIDOMBIVLIThane
RATANDEVI MEHETADOMBIVLIThane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVLI MUNICIPAL CORPORATION
Permissible FSI5150.0
Proposed, not sanctioned2,461 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCOMMERCE CENTRE TANDON ROAD OPP PARKAR SADAN DOMBIVLI EAST 421201
Estimated costRs 23.80 cr
Cost incurredRs 11.81 cr
Work done49.63%
BuildingWingEstimatedIncurred
AARYA ONENARs 23.62 crRs 11.81 cr
-NARs 17.50 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectU C ASSOCAITES UDAY MANSUKHLAL CHOPDA
EngineerAARNA STRUCTURAL CONSULTANTS J N CHAUDHARI CHAUDHARI
Chartered AccountantRISHIDESHMUKH RISHI MANGESH DESHMUKH
PartnerRole in project
ARYAN DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA29062621594Apr 2026 → Apr 2027

Reason as filed by the promoterSHORTAGE OF LABOUR AND MATERIAL AND PAPER WORK OF CORPORATION

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Aryan Developers Aarya One Architect certificate form 1.pdf27 Jun 2026
Withdrawal Update Form 1File: Aryan Developers Aarya One Architect certificate form 1.pdf27 Jun 2026
Withdrawal Update Form 2File: form 2 aryan developers.pdf27 Jun 2026
Withdrawal Update Form 2File: form 2 aryan developers.pdf27 Jun 2026
Withdrawal Update Form 3File: Form 3_0001.pdf27 Jun 2026
Withdrawal Update Form 3File: Form 3_0001.pdf27 Jun 2026
Form 1File: Form No 01 Aarya One.pdf13 Feb 2026
Form 2File: Aarya One Form 2.pdf13 Feb 2026
Form 3File: Aarya One Form 3.pdf13 Feb 2026
Disclosure of Sold and Booked InventoryFile: AARYA ONE SOLD UNSOLD.pdf13 Feb 2026
Form 1File: 30-09-2025 - RERA ARCHITECT CERTIFICATE - MOKASHI.pdf25 Nov 2025
Form 2File: Ref_77_72_791_ R-6_2025_ARUNI MIST MOKASHI UDAY CHOPDA NF_(30-09-2025).pdf25 Nov 2025
Form 3File: Aruni mist CA certificate Form 3_0001.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: arty.pdf25 Nov 2025
Form 1File: Form No 01 31-03-2025_0001.pdf20 Jul 2025
Form 2File: Form No 02 31-03-2025_0001.pdf20 Jul 2025
Form 3File: Form No 03 31-03-2025_0001.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31-03-2025.pdf20 Jul 2025
Form 1File: Form No 01 30-06-2025_0001.pdf20 Jul 2025
Form 2File: Form No 02 30-06-2025_0001.pdf20 Jul 2025
Form 3File: Form No 03 30-06-2025_0001.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30-06-2025.pdf20 Jul 2025
Layout approvalFile: MYSCAN_20240715_0001.pdf15 Jul 2024
Building plan approvalFile: MYSCAN_20240715_0002.pdf15 Jul 2024
Layout approvalFile: MYSCAN_20240715_0002.pdf15 Jul 2024
Building plan approvalFile: MYSCAN_20240715_0001.pdf15 Jul 2024
Building plan approvalFile: MYSCAN_20240715_0002.pdf15 Jul 2024
Building plan approvalFile: MYSCAN_20240715_0001.pdf15 Jul 2024
Copy of Layout Approval (in case of layout)File: MYSCAN_20240715_0001.pdf15 Jul 2024
Copy of Layout Approval (in case of layout)File: MYSCAN_20240715_0002.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240715_0002.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240715_0001.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240715_0002.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240715_0001.pdf15 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: REVISED CC - 22-03-2024 - converted.pdf15 Jul 2024
Declaration about Commencement CertificateFile: REVISED CC - 22-03-2024 - converted.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aryan developers form 2A.pdf30 Mar 2024
Disclosure of sold/ booked inventoryFile: aryan developers disclosure sold-booked inventary.pdf30 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 aryan developers.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aryan Developers Aarya One Architect certificate form 1.pdf19 Jan 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (2) (2 files merged).pdf31 Mar 2023
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (2) (2 files merged).pdf31 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Aryan Developers Annexure -A Shweta Babli Chavan_0001.pdf31 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Aryan Developers Annexure -A Babli Dattatray Chavan_0001.pdf31 Mar 2023
Proforma of Agreement for saleFile: DRAFT SALE AGREEMENT-ARYA ONE-AS PER RERA (2).pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ref_77_100_882_ R-0_2023_BABLI D CHAVAN TWINS CHS NF_(03-03-2023).pdf28 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aryan Developers CA certificate form 3__0001 (1).pdf28 Mar 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to model copy of Agreement (4).pdf28 Mar 2023
Layout approvalFile: MYSCAN_20230130_0002.pdf24 Mar 2023
Building plan approvalFile: MYSCAN_20230130_0002.pdf24 Mar 2023
Layout approvalFile: MYSCAN_20230130_0001.pdf24 Mar 2023
Building plan approvalFile: MYSCAN_20230130_0001.pdf24 Mar 2023
Copy of Layout Approval (in case of layout)File: MYSCAN_20230130_0002.pdf24 Mar 2023
Copy of Layout Approval (in case of layout)File: MYSCAN_20230130_0001.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230130_0002.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230130_0001.pdf24 Mar 2023
Other - LegalFile: KDMC REMARK.pdf24 Mar 2023
PAN CardFile: ARYAN DEVELOPERS PANCARD.pdf6 Mar 2023
Copy of the legal title reportFile: RERA Title Reports.pdf6 Mar 2023
Details of encumbrances concerned to FinanceFile: FINANCE 123.pdf6 Mar 2023
Details of encumbrances concerned to LegalFile: FINANCE 123.pdf6 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: RERA KDMC SANCTION LETTER (1) (1).pdf6 Mar 2023
Declaration about Commencement CertificateFile: COMMEC.pdf6 Mar 2023
Declaration in FORM BFile: Aryan Developers Form B Declaration Babli Dattatray Chavan_0001.pdf6 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA CERTIFICATE (1).pdf6 Mar 2023
CERSAI detailsFile: CERSAI_Search_Report_200262249312_For_Asset_Based_Search_06_03_2023_20_13_40_632.pdf6 Mar 2023
Proforma of Allotment letterFile: Document 94 (1).pdf6 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Document 95.pdf6 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Document 95 (1).pdf6 Mar 2023

How this compares with Thane

18%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AARYA ONE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SHARDA MUKAMBIKA HOTEL NANDIVALI TARFE PANCHANAND7,600+ in Thane

2 kmAARYA ONECompleted 74Lapsed / revoked 63Other 120Dot size: filed unitsN

Filed coordinates, straight-line distance. 257 registered projects within 2 km.

Builder: ARYAN DEVELOPERS

ARYAN DEVELOPERS has 7 registrations on MahaRERA, including Mayuri Gold Leaf and Mayuri Residency. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AARYA ONE is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AARYA ONE?

The registered promoter entity is ARYAN DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABXFA9512B1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AARYA ONE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AARYA ONE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AARYA ONE?

The professionals named in the filing: Architect: U C ASSOCAITES UDAY MANSUKHLAL CHOPDA; Engineer: AARNA STRUCTURAL CONSULTANTS J N CHAUDHARI CHAUDHARI; Chartered Accountant: RISHIDESHMUKH RISHI MANGESH DESHMUKH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AARYA ONE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AARYA ONE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AARYA ONE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.