Completed No litigation declared Residential / Group Housing project

AARYA CASA

By RAJVEER INFRA PROJECTS

RG-MH-01014 · RERA P51500008230 · Last updated on MahaRERA portal: 31 Dec 2021

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 29 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
30 of 77Construction stages doneacross 7 buildings; furthest along: Installation of Lifts, 90%
1Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

AARYA CASA is a Residential / Group Housing project by RAJVEER INFRA PROJECTS in Aurangabad, Maharashtra, registered with MahaRERA as P51500008230 on 18 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 29 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAARYA CASA
  • TypeResidential / Group Housing
  • Location
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431005
  • Pincode431005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500008230
  • ReraGenie IDRG-MH-01014

Builder

  • NameRAJVEER INFRA PROJECTS
  • Entity typePartnership
  • PartnersARUN RAJENDRAKUMAR MUNOT, SARLA ARUN MUNOT, PIYUSH ARUN MUNOT, RISHABH ARUN MUNOT

Key dates

this monthRegisteredAug 2017First promiseJul 2019Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Jul 2019)
  • Buildings7 building records
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
APARTMENTNA90000
BUNGALOW NO 3 C1NA30000
BUNGALOW NO 4 C2NA30000
BUNGALOW NO 5 C3NA30000
BUNGALOW NO 6 C4NA30000
BUNGALOW NO 2 B2NA30000
BUNGALOW NO 1 B1NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 31 Dec 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Installation of Lifts, at 90%.

APARTMENT100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 3 C182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 4 C253%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 5 C319%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 6 C419%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor10%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 2 B28%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
BUNGALOW NO 1 B19%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 31 Dec 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes75%
Open ParkingYes100%

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered1
Open Space20
BuildingClosed/CoveredOpen SpaceTotal
APARTMENT123
BUNGALOW NO 3 C1033
BUNGALOW NO 4 C2033
BUNGALOW NO 5 C3033
BUNGALOW NO 6 C4033
BUNGALOW NO 2 B2033
BUNGALOW NO 1 B1033

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,895 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SHREEHARI ASSOCIATES PVT. LTD.Aurangabad (M Corp.)Aurangabad

Approvals and building plan

Permissible FSI3727.85
Proposed, not sanctioned3,728 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAAKASHWANI CHOWK AURANGABAD

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJAY PURI
ArchitectSUNIL BHALE
PartnerRole in project
RAJVEER INFRA PROJECTS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500002086Jul 2019 → Jul 2020

Reason as filed by the promoter1) Revised Permission got delayed by about 1 year 2) Sand/Metal use banned by Government 3) Dispute With Contractor & New Contractor Appointed 4) Delay in Booking 4) Lack of Water.

EXT51500009310Jul 2019 → Jun 2021

Reason as filed by the promoterSIR, WE REQUIRE AN EXTENSION OF RERA TILL JUNE 2021 AS THERE IS HARDLY ANY WORK LEFT TO COMPLETE BUT DUE TO LOCK DOWN AGAIN IN AURANGABAD CITY THERE ARE MANY AGENCIES WHO ARE NOT READY TO WORK. ALSO THIS PROJECT WAS HEADED BY MY FATHER LATE SHRI ARUN MUNOT, WHO HAPPENED TO EXPIRE ON 28TH OF FEB 2019.AFTER WHICH WE FACED A LOT OF FAMILY PROBLEMS. IN 2020 WE FACED ACCUTE SHORTAGE OF MATERAIL AND LABOUR DUE TO COVID -19. THE PRICES OF ALL MATERAIL HAS GONE HIGH AND ALSO MATERIAL NOT AVAILABLE. BUT NOW EVERYTHING IS IN CONTROL AND WE SHALL COMPLETE THE SITE ON THE GIVEN DATE OR BEFORE IT. PLEASE D

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC003000000000060Pawankumar Jaiprakash ManiyarPritesh Arun Munot10/10/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Sep 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Sep 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Dec 2021

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion certificate aarya casa pdf low res.pdf31 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE.pdf19 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE.pdf19 Nov 2018
Certificates of CA (Form 3)File: C A CERTIFICATE.pdf19 Nov 2018
Building plan approvalFile: DRAWINGS RERA.pdf29 Sep 2018
Building Plan Approval (IOD)File: DRAWINGS RERA.pdf29 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf29 Sep 2018
Certificates of CA (Form 5)File: FORM 5 2017-18.pdf29 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE.pdf14 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE.pdf14 Aug 2018
Certificates of CA (Form 3)File: C A CERTIFICATE.pdf14 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARHITECT.pdf15 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER.pdf15 May 2018
Certificates of CA (Form 3)File: CA.pdf15 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE 1 MB.pdf15 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIHIFIKATE 1MB.pdf15 Feb 2018
Certificates of CA (Form 3)File: CA CERTIFICTATE 1MB.pdf15 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE.pdf15 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER,S CERTIFICATE.pdf15 Nov 2017
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf15 Nov 2017
Proforma of Allotment letterFile: Revised Agreement to sale as per RERA 28-10-2017.pdf28 Oct 2017
OtherFile: 1.pdf28 Oct 2017
OtherFile: 3.pdf28 Oct 2017
OtherFile: 3.pdf28 Oct 2017
OtherFile: 2.pdf28 Oct 2017
OtherFile: 4.pdf28 Oct 2017
OtherFile: 5.pdf28 Oct 2017
OtherFile: 6.pdf28 Oct 2017
Details of encumbrancesFile: letter.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMECEMENT CERTIFICATE.pdf31 Jul 2017
Declaration in FORM BFile: bond.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: bhale sir.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: karanjikar sir.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA.pdf31 Jul 2017
Proforma of Allotment letterFile: AGREEMENT TO SALE Draft.pdf31 Jul 2017
Layout approvalFile: 1.pdf28 Jul 2017
Building plan approvalFile: 2.pdf28 Jul 2017
Building plan approvalFile: 3.pdf28 Jul 2017
Building plan approvalFile: 4.pdf28 Jul 2017
Building plan approvalFile: 5.pdf28 Jul 2017
Building plan approvalFile: 6.pdf28 Jul 2017
PAN CardFile: PAN CARD.pdf28 Jul 2017
Copy of the legal title reportFile: TITLE CUM SEARCH REPORT.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: 1.pdf28 Jul 2017
Building Plan Approval (IOD)File: 2.pdf28 Jul 2017
Building Plan Approval (IOD)File: 3.pdf28 Jul 2017
Building Plan Approval (IOD)File: 4.pdf28 Jul 2017
Building Plan Approval (IOD)File: 5.pdf28 Jul 2017
Building Plan Approval (IOD)File: 6.pdf28 Jul 2017

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one moved by 29 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is completed

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep AARYA CASA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Aurangabad (M Corp.)1,400+ in Aurangabad

Builder: RAJVEER INFRA PROJECTS

RAJVEER INFRA PROJECTS has 1 registration on MahaRERA, including AARYA CASA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if AARYA CASA is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AARYA CASA?

The registered promoter entity is RAJVEER INFRA PROJECTS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AARYA CASA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AARYA CASA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AARYA CASA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AARYA CASA?

The professionals named in the filing: Architect: SANJAY PURI; Architect: SUNIL BHALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AARYA CASA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AARYA CASA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AARYA CASA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.