ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / AARC RESIDENCY

Registration lapsed No litigation declared Residential / Group Housing project

AARC RESIDENCY

By AARC HOUSING CO

RG-MH-24206 · RERA P51800006940 · Last updated on MahaRERA portal: 7 Jul 2022

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 67 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2021Possession promised67 months past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
0Complaints at MahaRERAon this registration
Jump to the 31 documents Report an error

AARC RESIDENCY is a Residential / Group Housing project by AARC HOUSING CO in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006940 on 16 Aug 2017. Possession was promised by 30 Mar 2021 and is now 67 months past that date.

At a glance

Project

  • NameAARC RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Vira Desai Road
    • Andheri
    • Mumbai Suburban
    • 400053
  • Pincode400053
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800006940
  • ReraGenie IDRG-MH-24206

Builder

  • NameAARC HOUSING CO
  • Entity typePartnership
  • PartnersGULAM RASUL M A SHAIKH, PREM MATASEVAK MISHRA

Key dates

67 months past promisethis monthRegisteredAug 2017PromisedMar 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on16 Aug 2017
  • Promised completion30 Mar 2021
  • Revised completionNone
  • Buildings1 building record
  • Documents filed31 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AARC RESIDENCYNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Jul 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

AARC RESIDENCY: 34% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Jul 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area672 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2058.0
Proposed, not sanctioned2,058 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUNION BANK OF INDIA, BORIVALI EAST BRANCH, CARTER ROAD NO 7, BORIVALI EAST

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS VETURKAR & ASSOCIATES
EngineerVEXUS PROJECT SOLUTIONS PVT LTD
PartnerRole in project
AARC HOUSING CO-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Jul 2022

Documents filed31

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate of AARC Residency.pdf7 Jul 2022
Declaration about Commencement CertificateFile: Declaration About CC.pdf30 May 2022
Disclosure of sold/ booked inventoryFile: Sold and Unsold Flat.pdf30 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 FY 1718.pdf30 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 1819.pdf30 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 1920.pdf30 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2021.pdf30 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect ARC certificate 99 completion.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2AQuality Assurance Certificate June 2019.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2AQuality Assurance Certificate September 2019.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2AQuality Assurance Certificate December 2019.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2AQuality Assurance Certificate March 2019.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2AQuality Assurance Certificate June 2020.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2AQuality Assurance Certificate September 2020.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2AQuality Assurance Certificate December 2020.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2AQuality Assurance Certificate March 2021.pdf11 Oct 2021
Layout approvalFile: Plan.pdf1 Nov 2018
Copy of Layout Approval (in case of layout)File: Plan.pdf1 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf1 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: New CC.pdf22 Mar 2018
Building plan approvalFile: I_O_D new.pdf31 Jul 2017
Layout approvalFile: AARC Plan.pdf31 Jul 2017
Copy of the legal title reportFile: Title_Certificate new.pdf31 Jul 2017
Details of encumbrancesFile: Encumbrances.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: AARC Plan.pdf31 Jul 2017
Building Plan Approval (IOD)File: I_O_D new.pdf31 Jul 2017
Declaration in FORM BFile: Form B 1.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_Certifcate 1.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: C C.pdf31 Jul 2017
Proforma of Allotment letterFile: Allotment Letter.pdf31 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AARC RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmAARC RESIDENCYCompleted 30Lapsed / revoked 19Other 62Dot size: filed unitsN

Filed coordinates, straight-line distance. 111 registered projects within 2 km.

Builder: AARC HOUSING CO

AARC HOUSING CO has 1 registration on MahaRERA, including AARC RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that AARC RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if AARC RESIDENCY is delayed beyond 30 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AARC RESIDENCY?

The registered promoter entity is AARC HOUSING CO, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AARC RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AARC RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AARC RESIDENCY?

The professionals named in the filing: Architect: MS VETURKAR & ASSOCIATES; Engineer: VEXUS PROJECT SOLUTIONS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AARC RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AARC RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AARC RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.