ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / AARAV PALM SPRINGS

Completed No litigation declared Residential / Group Housing project

AARAV PALM SPRINGS

By DIKSHIT RAJAN AGARWAL

RG-MH-70437 · RERA P52100051910 · Last updated on MahaRERA portal: 11 Nov 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
6 of 10Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

AARAV PALM SPRINGS is a Residential / Group Housing project by DIKSHIT RAJAN AGARWAL in Pune, Maharashtra, registered with MahaRERA as P52100051910 on 12 Jul 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 4 of the 10 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameAARAV PALM SPRINGS
  • TypeResidential / Group Housing
  • Location
    • Na
    • Wagholi
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051910
  • ReraGenie IDRG-MH-70437

Builder

  • NameDIKSHIT RAJAN AGARWAL
  • Entity typeIndividual
  • Other registrations4 more →
  • Completed2 of 5
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Jul 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed80 files

Current status

40%4 of 10 units booked
100.0%Work done, per cost certificate

Figures as on 11 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA63505
BNA63505

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered10
BuildingClosed/CoveredTotal
A55
B55

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area930 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Aug 2025
LandownerVillageDistrict
HARISH SUNDERDAS VASWANIPune (M Corp.)Pune
DIKSHIT RAJAN AGARWALPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGIONAL DEVELOPMENT AUTHORITY (PMRDA)
Permissible FSI917.36
Proposed, not sanctioned917 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPune Maharashtra 411060
Estimated costRs 3.00 cr
Cost incurredRs 3.00 cr
Work done100.0%
BuildingWingEstimatedIncurred
ANARs 1.50 crRs 1.50 cr
BNARs 1.50 crRs 1.50 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectWALHEKAR & ASSOCIATES
EngineerVIJAY RAJPUT
Chartered AccountantK S BENDRE
PartnerRole in project
DIKSHIT RAJAN AGARWAL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 SEP 2025.pdf11 Nov 2025
Withdrawal Update Form 2File: FORM 2 SEP 2025.pdf11 Nov 2025
Withdrawal Update Form 3File: FORM 3 SEP 2025.pdf11 Nov 2025
Occupational CertificateFile: OC - PLOT NO 23- WAGHOLI -DIKSHIT AGARWAL.pdf11 Nov 2025
Withdrawal Update Form 1File: Form-1 aarav plamspring.pdf3 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf3 Sep 2025
Withdrawal Update Form 3File: Form-3 aarav palmspring.pdf3 Sep 2025
Form 1File: Form 1.pdf12 Aug 2025
Form 2File: Form 2.pdf12 Aug 2025
Form 3File: Form 3.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Sep 2023.pdf12 Aug 2025
Form 1File: Form 1.pdf12 Aug 2025
Form 2File: Form 2.pdf12 Aug 2025
Form 3File: FORM 3.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Dec 2023.pdf12 Aug 2025
Form 1File: FORM 1.pdf12 Aug 2025
Form 2File: FORM 2.pdf12 Aug 2025
Form 3File: Form 3.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure March 2024.pdf12 Aug 2025
Form 1File: Form 1.pdf12 Aug 2025
Form 2File: Form 2.pdf12 Aug 2025
Form 3File: Form 3.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure June 2024.pdf12 Aug 2025
Form 1File: FORM 1.pdf12 Aug 2025
Form 2File: FORM 2.pdf12 Aug 2025
Form 3File: FORM 3.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Sep 2024.pdf12 Aug 2025
Form 1File: Form 1.pdf12 Aug 2025
Form 2File: Form 2.pdf12 Aug 2025
Form 3File: Form 3.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Dec 2024.pdf12 Aug 2025
Form 1File: Form 1.pdf12 Aug 2025
Form 2File: Form 2.pdf12 Aug 2025
Form 3File: Form 3.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure March 2025.pdf12 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf10 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf10 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form- 2.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 SEP24.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 SEP24.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 SEP24.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 aarav plamspring.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 aarav palmspring.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 aarav palmspring.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aarav Palmspring Form-3.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 AARAV PALM APRING MARCH 24.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 AARAV PALM SPRING MARCH 24.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf27 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf27 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf27 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form-1.pdf28 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate form-2.pdf28 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed.pdf28 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration new.pdf22 May 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER -FINANCE 2.pdf18 May 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER -FINANCE 2.pdf18 May 2023
CERSAI detailsFile: UNDERTAKINGS FOR CERSAI.pdf18 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3.pdf18 May 2023
Layout approvalFile: Layout Approval1.pdf3 May 2023
Building plan approvalFile: Building Plan (1).pdf3 May 2023
Copy of the legal title reportFile: Legal Title Report.pdf3 May 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER -FINANCE.pdf3 May 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER -LEGAL.pdf3 May 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER -FINANCE.pdf3 May 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER -LEGAL.pdf3 May 2023
Copy of Layout Approval (in case of layout)File: Layout Approval1.pdf3 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan (1).pdf3 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf3 May 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf3 May 2023
Declaration in FORM BFile: FORM B DIKSHIT.pdf3 May 2023
Declaration in FORM BFile: FORM B VASWANI.pdf3 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST.pdf3 May 2023
Proforma of Agreement for saleFile: Agreement for sale.pdf3 May 2023
Proforma of Allotment letterFile: Aarav-allotment letter.pdf3 May 2023
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT.pdf3 May 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT.pdf3 May 2023
PAN CardFile: PANCARD.pdf26 Apr 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
AARAV BLOSSOMSurvey No 849 to 854 Wagholi Pune 4122079-OngoingDec 2027Dec 2027
AARAV ARCACIASurvey No 849 to 854 Plot No 61 Wagholi 41220714-OngoingDec 2027Dec 2027
AARAV BLISSP52100013258WAGHOLI, Pune-Sep 2017CompletedDec 2019Late, Jun 2022

How this compares with Pune

40%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AARAV PALM SPRINGS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi13,700+ in Pune

2 kmAARAV PALM SPRINGSCompleted 24Lapsed / revoked 12Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 55 registered projects within 2 km.

Builder: DIKSHIT RAJAN AGARWAL

DIKSHIT RAJAN AGARWAL has 5 registrations on MahaRERA, including AARAV BLISS and AARAV BLOSSOM. Its filings disclose 6 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AARAV PALM SPRINGS is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AARAV PALM SPRINGS?

The registered promoter entity is DIKSHIT RAJAN AGARWAL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AARAV PALM SPRINGS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AARAV PALM SPRINGS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AARAV PALM SPRINGS?

The professionals named in the filing: Architect: WALHEKAR & ASSOCIATES; Engineer: VIJAY RAJPUT; Chartered Accountant: K S BENDRE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AARAV PALM SPRINGS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AARAV PALM SPRINGS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AARAV PALM SPRINGS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.