Red flags
- Registration lapsed
- Possession 15 months past the filed date
- 11 complaints at MahaRERA
- Completion date moved by 10 months
- 1 extension taken
- Rs 92.95 crore secured on the land, in favour of State Bank of India
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
7 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AARAMBH WING A-B is a Residential / Group Housing project by SATELLITE DEVELOPERS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800028424 on 2 Mar 2021. Possession was promised by 31 Jul 2025 and is now 15 months past that date. The completion date has moved by 10 months from the original filing. 11 complaints are on record with the regulator.
At a glance
Project
- NameAARAMBH WING A-B
- TypeResidential / Group Housing
- Location
- Off Azad Chourasiya Road
- Appa Pada
- Gandhi Nagar
- Malad East
- Borivali
- Mumbai Suburban
- 400097
- Pincode400097
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800028424
- ReraGenie IDRG-MH-29442
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on2 Mar 2021
- Promised completion31 Jul 2025
- Revised completionRevised to 31 Jul 2025 (originally 30 Sep 2024)
- Buildings2 building records
- Documents filed89 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AARAMBH WING A | NA | 20 | 18 | 0 | 0 | 0 |
| AARAMBH WING B | NA | 20 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 23 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 45%.
AARAMBH WING A44%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 45% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 5% |
AARAMBH WING B53%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 45% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 5% |
Progress on shared amenities20
As on 23 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| Walking Track | Yes | 0% |
| Multipurpose room | Yes | 0% |
| Kids Play Area | Yes | 0% |
| Indoor Games Room | Yes | 0% |
| Gymnasium | Yes | 0% |
Parking filed36
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| AARAMBH WING A | 16 | 16 |
| AARAMBH WING B | 20 | 20 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KIRAN SHIRVATKAR |
| Engineer | Alpesh M Gandhi |
| Chartered Accountant | NORO & Co |
| Chartered Accountant | Gupta Jasoria & Associates |
| Partner | Role in project |
|---|---|
| SATELLITE DEVELOPERS PVT LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAarambh is bigger layout with multiple wings being developed. We got earlier wings delayed by 6-8 months time for which we sought RERA extention and delivered the OC (Wing C-D OC received in March 2023 and Wing E-F OC received in October 2023). Due to the cascading effect of time overrun on the completion of other wings in the same layout adversely affected the execution time for current project i.e. Wing A-B.
Complaints filed with MahaRERA11
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000500565 | SATELLITE DEVELOPERS PVT LTD SATELLITE DEVELOPERS PVT LTD | PRATAP NAVNATH NARSINGE | 25/05/2024 |
| CC006000000500567 | SATELLITE DEVELOPERS PVT LTD SATELLITE DEVELOPERS PVT LTD | ANAM MUJADDADI | 25/05/2024 |
| CC12500097 | VINAYAK ANKUSH GHADGE | SATELLITE DEVELOPERS PVT LTD | 10/01/2025 |
| CC12500321 | SATELLITE DEVELOPERS PVT LTD | Pranil Pangale | 29/01/2025 |
| CC12500553 | Swapnil Sawant | SATELLITE DEVELOPERS PVT LTD | 18/02/2025 |
| CC12502445 | kiran suraj sonawane | SATELLITE DEVELOPERS PVT LTD | 17/07/2025 |
| CC12503025 | Amar Devichand Mehta | - | 27/08/2025 |
| CC12503715 | Aniket Anil Prabhulkar | SATELLITE DEVELOPERS PVT LTD | 20/10/2025 |
| CC12503721 | Shobha Anil Patil | SATELLITE DEVELOPERS PVT LTD | 21/10/2025 |
| CC12504019 | Sanman Ramesh Sawant | SATELLITE DEVELOPERS PVT LTD | 14/11/2025 |
| CC12603473 | Rajababu Ramashankar Singh | SATELLITE DEVELOPERS PVT LTD | 05/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Feb 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Feb 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Feb 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Aarambh AB-Q3 FY 24-25.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Aarambh AB FY-24-25 Q3.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Aarambh AB-Q3 FY 24-25.pdf | 23 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Investory Status Aarambh AB-Dec 24.pdf | 23 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Aarambh A-B - Form 5 FY 23-24.pdf | 24 Oct 2024 |
| Declaration in FORM BFile: Form-B Promoter declaration for extension in time.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Aarambh AB- RERA Cert 30 Sep 24.pdf | 23 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aarambh A-B Form-3 Q2 FY 24-25.pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh A-B Form-2 Q2 FY 24-25.pdf | 23 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold or Booked Investory Status 29 of 2021.pdf | 23 Oct 2024 |
| Other - FinanceFile: SECURED LOAN.pdf | 23 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-Aarambh AB March 24.pdf | 23 Oct 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: SECURED LOAN.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Aarambh AB- RERA Cert Q E Jun-24.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aarambh A-B Form-3_Q1 Mar-25.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh A-B Form-2 Q1 FY 24-25.pdf | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aarambh A-B Form-1 Q4 FY 23-24.pdf | 31 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh A-B Form-2 Q4 FY 23-24.pdf | 31 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aarambh A-B Form-3_Q4 Mar-24.pdf | 31 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca fORM 3 ab.pdf | 28 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 02-Self Declaration of Bank Annexure-A Aarambh-AB Wing.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aarambh A-B Form-3 CA Cert-FY-23-24 Q3-Final.pdf | 13 May 2024 |
| Other - TechnicalFile: Justification for New Bank Account.pdf | 13 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aarambh A-B Form-1 Q3 FY 23-24.pdf | 21 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh A-B Form-2 Q3 FY 23-24.pdf | 21 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Details of sold and unsold inventory-December 23.pdf | 21 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aarambh A-B Form-3 CA Cert-FY-23-24 Q3.pdf | 21 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-Aarambh AB March 23.pdf | 19 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: 03-Aarambh AB-Legal and Finance Declaration.pdf | 18 Jan 2024 |
| Details of encumbrances concerned to LegalFile: 03-Aarambh AB-Legal and Finance Declaration.pdf | 18 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of seperate bank account.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aarambh A-B Form-1 Q4 FY 22-23.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aarambh A-B Form-1 Q1 FY 23-24.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aarambh A-B Form-1 Q2 FY 23-24.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh A-B Form-2 Q4 FY 22-23.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh A-B Form-2 Q1 FY 23-24.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh A-B Form-2 Q2 FY 23-24.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aarambh A-B Form-3 CA Cert-FY-23-24 Q1.pdf | 10 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 Form 3 FY 23-24.pdf | 10 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Aarambh A-B - Form 5 FY 22-23.pdf | 23 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aarambh A-B Form-3 CA Cert-FY-22-23 Q4.pdf | 5 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: Self-Certified Encumbrances Certificate.pdf | 13 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Self-Certified Encumbrances Certificate.pdf | 13 Feb 2023 |
| Declaration about Commencement CertificateFile: Declaration on CC.pdf | 13 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaambh AB Form-1 FY 20-21 Q4.pdf | 13 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaambh AB Form-1 FY 21-22 Q2.pdf | 13 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaambh AB Form-1 FY 21-22 Q3.pdf | 13 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaambh AB Form-1 FY 21-22 Q4.pdf | 13 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaambh AB Form-1 FY 22-23 Q1.pdf | 13 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaambh AB Form-1 FY 22-23 Q2.pdf | 13 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaambh AB Form-1 FY 22-23 Q3.pdf | 13 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh A-B Form 2 Q4 FY 20-21.pdf | 13 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh A-B Form 2 Q1 FY 21-22.pdf | 13 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh A-B Form 2 Q2 FY 21-22.pdf | 13 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh A-B Form 2 Q3 FY 21-22.pdf | 13 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh A-B Form 2 Q4 FY 21-22.pdf | 13 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh A-B Form 2 Q1 FY 22-23.pdf | 13 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh A-B Form 2 Q2 FY 22-23.pdf | 13 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh A-B Form 2 Q3 FY 22-23.pdf | 13 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Aaambh AB Form-2A FY 20-21.pdf | 13 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Aaambh AB Form-2A FY 21-22.pdf | 13 Feb 2023 |
| CERSAI detailsFile: CERSAI Details.pdf | 13 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaambh AB Form-3 FY 20-21 Q4.pdf | 13 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaambh AB Form-3 FY 21-22 Q2.pdf | 13 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaambh AB Form-3 FY 21-22 Q3.pdf | 13 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaambh AB Form-3 FY 21-22 Q4.pdf | 13 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaambh AB Form-3 FY 22-23 Q1.pdf | 13 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaambh AB Form-3 FY 22-23 Q2.pdf | 13 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5 Aarambh AB 2021.pdf | 13 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Aarambh wing A-B 21-22.pdf | 13 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration on Bank Account.pdf | 13 Feb 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Arambh AB Declaration.pdf | 23 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 Aarambh AB.pdf | 14 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AB Form No 1.pdf | 13 Aug 2021 |
| Layout approvalFile: Layout Plan_compressed_compressed (2).pdf | 24 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Plan_compressed_compressed (2).pdf | 24 Feb 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Copy-Colour (1).pdf | 24 Feb 2021 |
| Building plan approvalFile: Amended IOA.pdf | 19 Feb 2021 |
| Layout approvalFile: LOI-Developers.pdf | 19 Feb 2021 |
| PAN CardFile: Pan Card SDPL.PDF | 19 Feb 2021 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Satellite Gazebo | Satellite Gazebo Andheri Ghatkopar Link Road Chakala Andheri East Mumbai 400093 | 42 | Completed | Apr 2013 | Late, Jan 2015 |
| Solitaire - 14 | S 14 Andheri Ghatkopar Link Road Andheri East Mumbai 400 093 | 28 | Completed | Jun 2012 | Late, Jan 2013 |
| Satellite Royale | Satellite Royale Pankaj Shah Marg Off Film City Road Goregaon East Mumbai 400063 | 105 | Completed | Mar 2012 | Late, Dec 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 7 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 89 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep AARAMBH WING A-B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Appa Pada, Gandhi Nagar, Malad East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 174 registered projects within 2 km.
Alta Monte and Signet
ERA REALTORS PRIVATE LIMITED
MAULI OMKAR
MAULI SAI DEVELOPERS PVT LTD
HIVE 97
AMITY CONSTRUCTIONS
MAULI PRIDE
MAULI SAI DEVELOPERS PVT LTD
Aarambh Phase III by group Satellite
Satellite Developers Private Limited
Sethia Imperial Avenue
Sai Enterprises
See every Mumbai Suburban project, with the district possession charts
Builder: SATELLITE DEVELOPERS PVT LTD
SATELLITE DEVELOPERS PVT LTD has 5 registrations on MahaRERA, including SATELLITE GLORY and AARAMBH WING C -D. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that AARAMBH WING A-B shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if AARAMBH WING A-B is delayed beyond 31 Jul 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AARAMBH WING A-B?
The registered promoter entity is SATELLITE DEVELOPERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AARAMBH WING A-B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against AARAMBH WING A-B?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for AARAMBH WING A-B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AARAMBH WING A-B?
The professionals named in the filing: Architect: KIRAN SHIRVATKAR; Engineer: Alpesh M Gandhi; Chartered Accountant: NORO & Co; Chartered Accountant: Gupta Jasoria & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AARAMBH WING A-B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback