Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
May 2023Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

AARAMBH RESIDENCY is a Residential / Group Housing project by RAKESH RAMESH TAPKIR in DIGHI, 411015, registered with MahaRERA as P52100026872 on 31 Oct 2020. The registration is recorded completed; possession was promised by 30 May 2023. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameAARAMBH RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • DIGHI
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100026872
  • ReraGenie IDRG-MH-16721

Builder

  • NameRAKESH RAMESH TAPKIR
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredOct 2020First promiseNov 2022Revised toMay 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Oct 2020
  • Promised completion30 May 2023
  • Revised completionRevised to 30 May 2023 (originally 30 Nov 2022)
  • Buildings1 building record
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BUILDINGNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

A BUILDING: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered8

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area707 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1120.6
Proposed, not sanctioned1,121 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMEZ FLOOR SLIVANA COUNTRY S NO 1 SHOP NO 1 CHOVISAWADI CHAROLI BK PUNE 412105

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR HRUSHIKESH DEORE
EngineerK P BADGUJAR CONSULTANTS PVT LTD
Chartered AccountantM P TILWANKAR AND CO
PartnerRole in project
RAKESH RAMESH TAPKIR-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012920Nov 2022 → May 2023

Reason as filed by the promoterDue to Covid 19

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Sep 2023

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Document 23.pdf25 Jan 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Document 45.pdf25 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Architect completion cert.pdf5 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Architect completion cert.pdf5 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Architect completion cert.pdf5 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion cert.pdf1 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 19-Jul-2023 (1)_compressed.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarmbh residency jun 23.pdf3 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold.pdf3 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 11 Apr 2023 (1) (1)_compressed.pdf13 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arambh residency form 2.pdf10 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf6 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf6 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Scan 15-Feb-2023.pdf15 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA CERTIFICATE.pdf14 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AARAMBH RESIDENCY.pdf14 Jan 2023
Disclosure of sold/ booked inventoryFile: img20221220_13312088 (1).pdf14 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: scan0014 (1)_compressed.pdf14 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf15 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aarambh Residency_compressed.pdf15 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf15 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf15 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf15 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aarambh Residency_compressed.pdf4 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed (3).pdf4 Aug 2022
Layout approvalFile: Planpass1_compressed.pdf10 Jun 2022
Building plan approvalFile: Planpass2_compressed.pdf10 Jun 2022
Copy of Layout Approval (in case of layout)File: Planpass1_compressed.pdf10 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: Planpass2_compressed.pdf10 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: CommencementR_compressed.pdf10 Jun 2022
Declaration about Commencement CertificateFile: Format D.pdf10 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate (Form 1)rera.pdf10 Jun 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf10 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Aarambh Residency_compressed.pdf10 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA CERTIFICATE.pdf19 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - AARAMBH RESIDENCY.pdf19 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Aarambh Residency_compressed.pdf19 Jan 2022
Declaration about Commencement CertificateFile: FORMAT D.pdf14 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf14 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf14 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf14 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (2)_compressed.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf14 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf14 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf3 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1_compressed.pdf3 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2_compressed.pdf3 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: arambh residency form 2 jan 21.pdf3 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed.pdf3 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 20-21.pdf3 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM3.pdf28 Oct 2020
Copy of the legal title reportFile: Power of attorney compressed.pdf9 Oct 2020
Copy of the legal title reportFile: Owner affidavit.pdf9 Oct 2020
Copy of the legal title reportFile: Development agreement_compressed-1-10.pdf9 Oct 2020
Copy of the legal title reportFile: Development agreement_compressed-11-20.pdf9 Oct 2020
Copy of the legal title reportFile: Development agreement_compressed-21-30.pdf9 Oct 2020
Copy of the legal title reportFile: Development agreement_compressed-31-40.pdf9 Oct 2020
Copy of the legal title reportFile: Development agreement_compressed-41-50.pdf9 Oct 2020
Copy of the legal title reportFile: Development agreement_compressed-51-59.pdf9 Oct 2020
Layout approvalFile: Layout compressed.pdf8 Oct 2020
Building plan approvalFile: Layout compressed.pdf8 Oct 2020
PAN CardFile: RAKESH JI PAN CARD.pdf8 Oct 2020
Copy of the legal title reportFile: Search title report compressed.pdf8 Oct 2020
Details of encumbrancesFile: Encumbrances certificate.pdf8 Oct 2020
Copy of Layout Approval (in case of layout)File: Layout compressed.pdf8 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: Layout compressed.pdf8 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: commencement certifictate compressed.pdf8 Oct 2020
Declaration in FORM BFile: Form B.pdf8 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf8 Oct 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AARAMBH RESIDENCY compressed.pdf8 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf8 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf8 Oct 2020
Proforma of Allotment letterFile: ALLOTMENT LETTER - 2020.pdf8 Oct 2020
Proforma of Allotment letterFile: Agreeement to sale.pdf8 Oct 2020
OtherFile: SHOP ACT.pdf8 Oct 2020

Keep AARAMBH RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DIGHI

2 kmAARAMBH RESIDENCYCompleted 22Lapsed / revoked 13Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 47 registered projects within 2 km.

Builder: RAKESH RAMESH TAPKIR

RAKESH RAMESH TAPKIR has 2 registrations on MahaRERA, including AARAMBH RESIDENCY and Aranyam. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if AARAMBH RESIDENCY is delayed beyond 30 May 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AARAMBH RESIDENCY?

The registered promoter entity is RAKESH RAMESH TAPKIR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AARAMBH RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AARAMBH RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AARAMBH RESIDENCY?

The professionals named in the filing: Architect: AR HRUSHIKESH DEORE; Engineer: K P BADGUJAR CONSULTANTS PVT LTD; Chartered Accountant: M P TILWANKAR AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AARAMBH RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AARAMBH RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AARAMBH RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.