ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Aapla Ghar Wagholi Annex Phase I

Registered No litigation declared Residential / Group Housing project

Aapla Ghar Wagholi Annex Phase I

By Maple Indus Developers

RG-MH-10926 · RERA P52100004818 · Last updated on MahaRERA portal: 24 Oct 2024

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 48 months from the original
16 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 99%
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

Aapla Ghar Wagholi Annex Phase I is a Residential / Group Housing project by Maple Indus Developers in Pune, Maharashtra, registered with MahaRERA as P52100004818 on 9 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 48 months from the original filing.

At a glance

Project

  • NameAapla Ghar Wagholi Annex Phase I
  • TypeResidential / Group Housing
  • Location
    • Wadebolai
    • Wade Bolhai
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004818
  • ReraGenie IDRG-MH-10926

Builder

  • NameMaple Indus Developers
  • Entity typePartnership
  • PartnerNavin Ashok Agarwal

Key dates

this monthRegisteredAug 2017First promiseDec 2022Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2022)
  • Buildings2 building records
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DNA100000
CNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 99%.

D82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%
C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%

Progress on shared amenities15

As on 24 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes75%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes40%
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes20%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered35
BuildingClosed/CoveredTotal
D2323
C1212

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,037 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
S N AssociatesPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI3989.4
Proposed, not sanctioned3,989 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Laukik apartment Bhandarkar Road Pune 411 004

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR Laxman Thite
ArchitectTKS Design Services
EngineerHansal Parikh And Associates
PartnerRole in project
Maple Indus Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018497Dec 2022 → Dec 2026

Reason as filed by the promoterDue to covid and non availability of material

EXT52100013599Dec 2022 → Dec 2023

Reason as filed by the promoterDue to 2nd wave of covid labour and raw material supply were not available and also because of that financial planning and work was affected.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Sep 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Aug 2024

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form4 Wadebolai.pdf24 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion CD Wadebolai.pdf14 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certi - maple indus developers.pdf16 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate - maple indus developers.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold List.pdf16 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Maple Indus Architect certificate.pdf30 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf30 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QAC INDUS.pdf30 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold List Mar 24.pdf30 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Maple Indus Developers Architect.pdf5 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Maple Indus Enginener Certificate.pdf5 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold List Dec 23.pdf5 Mar 2024
Declaration in FORM BFile: MID FOrmB.pdf12 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_page-0001.pdf12 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A 2022-2023.pdf5 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold List wadebolai.pdf25 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Maple Indus Wadebolai.pdf18 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Wadebolai.pdf18 Oct 2023
Certificates of CA (Form 3)File: Maple Indus Developers Form 3.pdf18 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Wadebolai Architech Certificate.pdf27 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: WADEBOLAI ENGG CERTIFICATE.pdf27 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Wadebolai march 2023.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate.pdf23 Sep 2023
Certificates of CA (Form 3)File: CA cerificate Indus.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Wadebolai Dec 2022.pdf9 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Wadebolai Engg Dec 2022.pdf9 Feb 2023
Certificates of CA (Form 3)File: MID.pdf9 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Wadebolai Engg Dec 2022.pdf8 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Aapla Ghar Wagholi Annex Phase I 2021-2022.pdf6 Feb 2023
Declaration about Commencement CertificateFile: Commencement disclosure.pdf26 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality2021.pdf26 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality2122.pdf26 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclusure of sold and unsold.pdf26 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 01-04-2018 to 31-03-2019.pdf26 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 01-04-2019 to 31-03-2020.pdf26 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 01-04-2020 to 31-03-2021.pdf26 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate Form 1.pdf15 Oct 2019
Certificates of CA (Form 3)File: CA.pdf14 Oct 2019
Layout approvalFile: Layout.pdf5 Sep 2019
Copy of Layout Approval (in case of layout)File: Layout.pdf5 Sep 2019
Proforma of Allotment letterFile: RERA Wadebolai.pdf5 Sep 2019
Form 2AFile: Form 2A Wadebolai.pdf30 Jul 2019
Building plan approvalFile: Layout Wadeboali 1.pdf8 Apr 2019
Layout approvalFile: Layout Wadebolai.pdf8 Apr 2019
Copy of Layout Approval (in case of layout)File: Layout Wadebolai.pdf8 Apr 2019
Building Plan Approval (IOD)File: Layout Wadeboali 1.pdf8 Apr 2019
Certificates of CA (Form 5)File: Maple Indus.pdf30 Sep 2018
OtherFile: Maple Indus Developers.pdf29 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 1.pdf6 Mar 2018
OtherFile: C Bldg plinth checking .pdf6 Mar 2018
OtherFile: Plinth D Bldg.pdf6 Mar 2018
Layout approvalFile: WADEBOLAI.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: WADEBOLAI.pdf29 Jul 2017
Certificates of CA (Form 3)File: Maple Indus Wagholi.pdf26 Jul 2017
Declaration in FORM BFile: Form B Maple Indus Developers.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate.pdf25 Jul 2017
Building plan approvalFile: wadeboli plan.pdf24 Jul 2017
Copy of the legal title reportFile: Wadebolai-1-15.pdf24 Jul 2017
Copy of the legal title reportFile: Wadebolai-16-31.pdf24 Jul 2017
Details of encumbrancesFile: Declaration.pdf24 Jul 2017
Building Plan Approval (IOD)File: wadeboli plan.pdf24 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Form 2 Wadebolai.pdf24 Jul 2017
Proforma of Allotment letterFile: WADEBOALI RERA DRAFT.pdf24 Jul 2017
Proforma of Allotment letterFile: Allotment letter Draft.pdf24 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aapla Ghar Wagholi Annex Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wade Bolhai13,700+ in Pune

2 kmAapla Ghar Wagholi AnnexCompleted 23Lapsed / revoked 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: Maple Indus Developers

Maple Indus Developers has 1 registration on MahaRERA, including Aapla Ghar Wagholi Annex Phase I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Aapla Ghar Wagholi Annex Phase I is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aapla Ghar Wagholi Annex Phase I?

The registered promoter entity is Maple Indus Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aapla Ghar Wagholi Annex Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aapla Ghar Wagholi Annex Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aapla Ghar Wagholi Annex Phase I?

The professionals named in the filing: Architect: AR Laxman Thite; Architect: TKS Design Services; Engineer: Hansal Parikh And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aapla Ghar Wagholi Annex Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aapla Ghar Wagholi Annex Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aapla Ghar Wagholi Annex Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.