AAIJI CASTLE
RG-MH-41693 · RERA P52100052317 · Last updated on MahaRERA portal: 28 May 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 19 months past the filed date
- Completion date moved by 3 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AAIJI CASTLE is a Others project by AAIJI DEVELOPERS in Dhanori, 411015, registered with MahaRERA as P52100052317 on 9 Aug 2023. Possession was promised by 31 Mar 2025 and is now 19 months past that date. The completion date has moved by 3 months from the original filing. 3 of the 19 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameAAIJI CASTLE
- TypeOthers
- Location
- 33/1A/73
- Dhanori
- 411015
- Pincode411015
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100052317
- ReraGenie IDRG-MH-41693
Builder
- NameAAIJI DEVELOPERS
- Entity typePartnership
- GSTIN27AAOFA2448J1Z7
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersHemant Jiwaram Choudhary, JIWARAM MAGAJI CHOUDHARY, SURESH JIWARAM CHOUDHARY
- Other registrations8 more →
- Completed3 of 9
- No longer live3 lapsed, de-registered or revoked
- Past their filed date2
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Aug 2023
- Promised completion31 Mar 2025
- Revised completionRevised to 31 Mar 2025 (originally 1 Dec 2024)
- Buildings1 building record
- Documents filed71 files
Current status
Figures as on 28 May 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AAIJI CASTLE | NA | 8 | 6 | 18 | 1 | 19 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.
AAIJI CASTLE: 80% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed12
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Somnath Kerur arch consultant and engineers |
| Engineer | Kahnu Katke |
| Chartered Accountant | Patel & Sharma Chartered Accountants |
| Chartered Accountant | Patel & Sharma |
| Chartered Accountant | Anuj Sushil Agrawal |
| Partner | Role in project |
|---|---|
| AAIJI DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe delay in completing the development works is primarily attributable to the overall slowdown in the economy, which has significantly impacted demand in the real estate sector. We have taken the consents of the allottee for extension. We are seeking extension only for 3 months
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Aaiji Castle_Form 1 Dec-24.pdf | 28 May 2025 |
| Form 2File: Aaiji Castle_Form 2_Dec 2024.pdf | 28 May 2025 |
| Form 3File: CA Aaiji Castle Form 3 Dec 2024.pdf | 28 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold dec 2024.pdf | 28 May 2025 |
| Form 1File: Aaiji Castle_Form 1_March 2025.pdf | 28 May 2025 |
| Form 2File: Aaiji Castle_Form 2_March 2025.pdf | 28 May 2025 |
| Form 3File: CA Aaiji Castle Form 3 Mar- 2025.pdf | 28 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold March 2025.pdf | 28 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA Form2A 24-25.pdf | 29 Apr 2025 |
| Building plan approvalFile: Sanction Plan No 4292-2025 Dt 26-03-2025_11zon.pdf | 26 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan No 4292-2025 Dt 26-03-2025_11zon.pdf | 26 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 24 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Aaiji Castle.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Aaiji Castle From Mar- 2025.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Castle Dec24_11zon.pdf | 17 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Aaiji Castle RERA Sold and Unsold Mar-2025 .pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaiji Castle Architect Certificate Dec-24 _11zon.pdf | 11 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaiji Castle_Form 1.pdf | 11 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Aaiji Castle From Dec 2024 .pdf | 17 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Unit Sold and Unsold jun 24.pdf | 9 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Unit Sold and Unsold sep24.pdf | 9 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Unit Sold and Unsold dec 24.pdf | 9 Jan 2025 |
| Declaration in FORM BFile: Form B (1).pdf | 24 Dec 2024 |
| Other - TechnicalFile: 11zon_JPEG-to-PDF (1).pdf | 24 Dec 2024 |
| Other - TechnicalFile: 11zon_JPEG-to-PDF.pdf | 24 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaiji Castle Architect Certificate June - 24 .pdf | 13 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaiji Castle Architect Certificate SEP - 24.pdf | 13 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaiji Castle Form 3 30062024_Signed.pdf | 13 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaiji Castle Form 3 30092024_Signed.pdf | 13 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aaiji Castle Form 2 30062024_Signed.pdf | 13 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aaiji_castle form 2 30092024_Signed.pdf | 13 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Aaiji Castle From 5 FY 2023-24 Dt 09-08-2024.pdf | 10 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Aaiji Castle From Mar 2024 .pdf | 2 Aug 2024 |
| Building plan approvalFile: Sanction Plan No 3267-2023 Dt 18-03-2024_11zon.pdf | 11 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan No 3267-2023 Dt 18-03-2024_11zon.pdf | 11 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC No 3267-2023 Dt 18-03-2024.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaiji Castle Arch Certificate March 2024 .pdf | 27 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Unit Sold and Unsold Mar 24.pdf | 27 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaiji Castle Architect Certificate Sep-23 Final.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaiji Castle Architect Certificate Dec-23 Final.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aaiji Castle Engineers Certificate Sep -23 Revised Final .pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aaiji Castle Engineers Certificate Dec -23 Revised Final pdf.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Aaiji Castle From 3 Sep 2023.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Aaiji Castle From 3 dec 2023.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Unit Sold and Unsold Sep 23.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Unit Sold and Unsold Dec 23.pdf | 20 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Aaiji Castle Application Preview.pdf | 11 Jul 2023 |
| Declaration about Commencement CertificateFile: Format D 03-07-2023.pdf | 4 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 03-07-2023.pdf | 4 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Organisation - Hemat Choudhary.pdf | 4 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Organisation - Suresh Choudhary.pdf | 4 Jul 2023 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT 23-5-23.pdf | 24 May 2023 |
| Details of encumbrances concerned to FinanceFile: CONCERNED TO FINANCE.pdf | 18 May 2023 |
| Details of encumbrances concerned to FinanceFile: CONCERNED TO LEGAL.pdf | 18 May 2023 |
| Details of encumbrances concerned to LegalFile: CONCERNED TO FINANCE.pdf | 18 May 2023 |
| Details of encumbrances concerned to LegalFile: CONCERNED TO LEGAL.pdf | 18 May 2023 |
| Declaration in FORM BFile: AFFIDAVIT DECLARATION.pdf | 18 May 2023 |
| CERSAI detailsFile: CHARGE ON PROJECT.pdf | 18 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK ACCOUNT.pdf | 18 May 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT LETTER.pdf | 18 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT SALE.pdf | 18 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Feb 2023 |
| Proforma of Agreement for saleFile: ATS.pdf | 4 Feb 2023 |
| Proforma of Allotment letterFile: Allotment_Letter (2).pdf | 4 Feb 2023 |
| Layout approvalFile: PLAN COPY_11zon.pdf | 17 Nov 2022 |
| Building plan approvalFile: PLAN COPY_11zon.pdf | 17 Nov 2022 |
| PAN CardFile: Aaiji Capital - AAIJI DEVELOPERS-PAN.pdf | 17 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: PLAN COPY_11zon.pdf | 17 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY_11zon.pdf | 17 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCMENT CERTIFICATE.pdf | 17 Nov 2022 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SOYAL PALACE | LOHEGAON | 31 | Completed | Feb 2017 | Feb 2017 |
| AAIJI PALACE | SR NO 36-2-2 TINGRE NAGAR AIRPORT ROAD | 55 | Completed | Jun 2016 | Jun 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep AAIJI CASTLE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dhanori
Filed coordinates, straight-line distance. 40 registered projects within 2 km.
Kohinoor Viva Pixel- Phase II
RISING ASSOCIATES
VIVACITY
REALCON LANDMARKS LLP
TRIAA VASANTAM CITY CENTER PHASE 1
Triaa Realtors LLP
QUE 101 PHASE I
ANNR Unique Realty LLP
NYATI ERA I
NYATI CONSTRUCTION PRIVATE LIMITED
ONE ARETHA PHASE 1
Triaa Landmarks LLP
Builder: AAIJI DEVELOPERS
AAIJI DEVELOPERS has 9 registrations on MahaRERA, including AAIJI DHAM BUILDING B and AAIJI DHAM BUILDING A. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record.
Frequently asked questions
What does it mean that AAIJI CASTLE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if AAIJI CASTLE is delayed beyond 31 Mar 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AAIJI CASTLE?
The registered promoter entity is AAIJI DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAOFA2448J1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AAIJI CASTLE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AAIJI CASTLE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AAIJI CASTLE?
The professionals named in the filing: Architect: Somnath Kerur arch consultant and engineers; Engineer: Kahnu Katke; Chartered Accountant: Patel & Sharma Chartered Accountants; Chartered Accountant: Patel & Sharma; Chartered Accountant: Anuj Sushil Agrawal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AAIJI CASTLE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback