ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / AADHAYAY

Registration lapsed No litigation declared Residential / Group Housing project

AADHAYAY

By Sheth Creators and Harileela Projects Pvt Ltd

RG-MH-03136 · RERA P51800020623 · Last updated on MahaRERA portal: 29 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 29 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 60%
29Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

AADHAYAY is a Residential / Group Housing project by Sheth Creators and Harileela Projects Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800020623 on 26 Apr 2019. Possession was promised by 30 Dec 2024 and is now 22 months past that date. 29 complaints are on record with the regulator.

At a glance

Project

  • NameAADHAYAY
  • TypeResidential / Group Housing
  • Location
    • MHADA Layout
    • D N Nagar
    • Andheri
    • Mumbai Suburban
    • 400053
  • Pincode400053
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800020623
  • ReraGenie IDRG-MH-03136

Builder

  • NameSheth Creators and Harileela Projects Pvt Ltd
  • Entity typeCompany
  • DirectorsMOHAMED ALI SHAKIL KOCHRA, MOINUDDIN SHAKIL KOCHRA

Key dates

22 months past promisethis monthRegisteredApr 2019PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on26 Apr 2019
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AADHAYAYNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 60%.

AADHAYAY: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities24

As on 29 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Outdoor Media WallYes0%
Party HallYes0%
Seating and reflexology cornerYes0%
Yoga Pavilion / Free Stretching ZoneYes0%
Outdoor Event LoungeYes0%
Kids Play AreaYes0%
GymYes0%
Gathering PlazaYes0%
Alcove reading / SittingsYes0%

Parking filed96

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots96
Closed/Covered96

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area926 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
D. N. Nagar Visawa Sahakari Grihnirman Sanstha LtdAndheriMumbai Suburban

Approvals and building plan

Permissible FSI6057.0
Proposed, not sanctioned3,017 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI BANK LTD, SHIRIN MANZIL CO-OP HOUSING SOCIETY, GROUND FLOOR, SHOP NO 3 TO 6, 18/24, ST MARRY R

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Sheth Creators and Harileela Projects Pvt Ltd-

Complaints filed with MahaRERA29

Case no.ComplainantRespondentFiled
CC006000000220869Capt Paresh Hemant NerurkarSheth Creators and Harileela Projects Pvt Ltd20/04/2022
CC006000000220892Purnima Paresh NerurkarSheth Creators and Harileela Projects Pvt Ltd21/04/2022
CC006000000220872Hemant NerurkarSheth Creators and Harileela Projects Pvt Ltd21/04/2022
CC006000000220897Sumitra Hemant NerurkarSheth Creators and Harileela Projects Pvt Ltd21/04/2022
CC006000000231157Uday DongreSheth Creators and Harileela Projects Pvt Ltd20/05/2022
CC006000000231158Shubha Shailesh ShettySheth Creators and Harileela Projects Pvt Ltd25/05/2022
CC006000000251564Baban WadghareSheth Creators and Harileela Projects Pvt Ltd27/06/2022
CC006000000303764Syed Manzoor ZaidiKOCHRA DEVELOPERS PRIVATE LIMITED26/12/2022
CC006000000395599Vaibhav Desai-08/05/2023
CC006000000395836Ashish MittalKOCHRA DEVELOPERS PRIVATE LIMITED19/05/2023
CC006000000396093MANOJ SHARMAKochra Developers Pvt. Ltd.09/08/2023
CC12400087Ispita Byomkesh PatiSheth Creators and Harileela Projects Pvt Ltd12/09/2024
CC12400644Eepsita Himadri GuhaSheth Creators and Harileela Projects Pvt Ltd04/11/2024
CC12502101Sudhir Kumar TripathiSheth Creators and Harileela Projects Pvt Ltd26/06/2025
CC12502102Sudhir Kumar TripathiSheth Creators and Harileela Projects Pvt Ltd26/06/2025
CC12502138Anuj Kamal KanodiaSheth Creators and Harileela Projects Pvt Ltd28/06/2025
CC12502228MAYA LAXMISHANKAR PANDEYSheth Creators and Harileela Projects Pvt Ltd04/07/2025
CC12502788Ganesh Harji KavatraSheth Creators and Harileela Projects Pvt Ltd08/08/2025
CC12503768Deep Kumar BanerjeeSheth Creators and Harileela Projects Pvt Ltd28/10/2025
CC12503769Nikhil BanerjeeSheth Creators and Harileela Projects Pvt Ltd28/10/2025
CC12504294Viren ChamariaSheth Creators and Harileela Projects Pvt Ltd05/12/2025
CC12600149Kavita Kirti AsherSheth Creators and Harileela Projects Pvt Ltd09/01/2026
CC12600715Jeh GagratSheth Creators and Harileela Projects Pvt Ltd07/02/2026
CC12600716Jeh GagratSheth Creators and Harileela Projects Pvt Ltd07/02/2026
CC12601006Rahul Mahendra SuraniSheth Creators and Harileela Projects Pvt Ltd24/02/2026
CC12601198Sheth Creators and Harileela Projects Pvt LtdBABAN W ADGHARE05/03/2026
CC12601628PADMA SRINIVASANSheth Creators and Harileela Projects Pvt Ltd23/03/2026
CC12603938ABHISHEK SINGH SAINGERSheth Creators and Harileela Projects Pvt Ltd25/06/2026
CC12603944ABHISHEK SINGH SAINGERSheth Creators and Harileela Projects Pvt Ltd25/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Apr 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Jan 2025

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B Affidavit Cum Declaration on 500 Stamp paper Scan.pdf29 Apr 2025
CERSAI detailsFile: CERSAI Declaration Scan Copy.pdf29 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format 'A' Declaration about separate bank account Scan copy.pdf29 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure 'A' Disclosure of Interest in Other Real Estate Org Scan Copy.pdf29 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Qaulity assuarance certificate Rera.pdf29 Apr 2025
Certificates of CA (Form 3)File: Form 3 - Aadhayay as on Dec 2023.pdf25 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Aadhayay as on March 2024.pdf25 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Aadhayay as on June 2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aadhayay as on Dec 2023.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aadhayay as on March 2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aadhayay as on June 2024.pdf25 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC list.pdf29 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate .pdf29 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A- 2019-20.pdf6 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A- 2020-21.pdf6 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A- 2021-22.pdf6 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- 2022-23.pdf6 Dec 2023
PAN CardFile: SHETH PAN.pdf30 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aadhayay as on March 2020.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aadhayay as on March 2021.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aadhayay as on December 2021.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aadhayay as on March 2022.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aadhayay as on September 2022.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aadhayay as on December 2022.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aadhayay as on March 2023.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aadhayay as on June 2023.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aadhayay as on September 2023.pdf29 Nov 2023
Certificates of CA (Form 3)File: Form 3- Aadhayay as on March 2020_compressed.pdf29 Nov 2023
Certificates of CA (Form 3)File: Form 3- Aadhayay as on March 2021_compressed.pdf29 Nov 2023
Certificates of CA (Form 3)File: Form 3- Aadhayay as on December 2021_compressed.pdf29 Nov 2023
Certificates of CA (Form 3)File: Form 3- Aadhayay as on March 2022.pdf29 Nov 2023
Certificates of CA (Form 3)File: Form 3 Aadhayay as on 30-09-2022.pdf29 Nov 2023
Certificates of CA (Form 3)File: Form 3 Aadhayay as on 31-12-2022.pdf29 Nov 2023
Certificates of CA (Form 3)File: Form 3 Aadhayay as on 31-03-2023.pdf29 Nov 2023
Certificates of CA (Form 3)File: Form 3 Aadhayay as on 30-06-2023.pdf29 Nov 2023
Certificates of CA (Form 3)File: Final Form 3 Aadhayay as on 30-09-2023.pdf29 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Aadhayay for FY 2019-20.pdf29 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Aadhayay for FY 2020-21.pdf29 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Aadhayay for FY 2021-22.pdf29 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Aadhayay-FY 2022-23.pdf29 Nov 2023
Declaration about Commencement CertificateFile: Format D.pdf27 Nov 2023
Disclosure of sold/ booked inventoryFile: Circilar 29.pdf27 Nov 2023
Certificates of CA (Form 3)File: CA Certificate- July 2022.pdf27 Jul 2023
Proforma of Agreement for saleFile: Final Draft Agreemnt- Aadhayay NP.pdf27 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CC till 15th floor.pdf5 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-AADHAYAY.pdf30 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-AADHAYAY.pdf30 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form -2A.pdf30 Sep 2022
Other - TechnicalFile: New IOD_compressed.pdf4 Jul 2022
Building plan approvalFile: IOD- IOA Page 1.pdf9 Apr 2022
Building plan approvalFile: IOD - IOA Page 2.pdf9 Apr 2022
Building plan approvalFile: IOD -IOA Page 3.pdf9 Apr 2022
Building plan approvalFile: Approved Plan.pdf9 Apr 2022
Building plan approvalFile: Approved Plan.pdf9 Apr 2022
Building Plan Approval (IOD)File: IOD- IOA Page 1.pdf9 Apr 2022
Building Plan Approval (IOD)File: IOD - IOA Page 2.pdf9 Apr 2022
Building Plan Approval (IOD)File: IOD -IOA Page 3.pdf9 Apr 2022
Building Plan Approval (IOD)File: Approved Plan.pdf9 Apr 2022
Building Plan Approval (IOD)File: Approved Plan.pdf9 Apr 2022
Building plan approvalFile: IOD - IOA Page 2.pdf7 Apr 2022
Building Plan Approval (IOD)File: IOD - IOA Page 2.pdf7 Apr 2022
Declaration about Commencement CertificateFile: Further CC Copy.pdf7 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate.pdf31 Jan 2022
Proforma of Allotment letterFile: Execution Version_Agreement for Sale_Aadhayay_04-09-2021-Revised.pdf12 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Aadhayay - Cc till 6th floor-compressed.pdf13 Sep 2021
Certificates of CA (Form 3)File: RERA Form-3 Aadhayay March 19.pdf24 Dec 2019
Certificates of CA (Form 3)File: CA Certificate no 3 Plot 30 dt 18 apr 19.pdf18 Apr 2019
Building plan approvalFile: IOA Plot 30 New Apr 19.pdf12 Apr 2019
Layout approvalFile: DN Nagar 30 - layout plan compressed.pdf12 Apr 2019
Copy of the legal title reportFile: DN Nagar 30 - Title Certificate dated 24 09 2018 Reduced size.pdf12 Apr 2019
Details of encumbrancesFile: Index-II-D N NAGAR Plot 30 for RERA.pdf12 Apr 2019
Copy of Layout Approval (in case of layout)File: DN Nagar 30 - layout plan compressed.pdf12 Apr 2019
Building Plan Approval (IOD)File: IOA Plot 30 New Apr 19.pdf12 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: Plot 30 - PLINTH CC Dec 18 zero FSI- REDUCED SIZE.pdf12 Apr 2019
Declaration in FORM BFile: DN Nagar 30 Form B for RERA.pdf12 Apr 2019
Declaration in FORM BFile: DN Nagar 30 Authority Letter for RERA.pdf12 Apr 2019
Proforma of Allotment letterFile: DN Nagar 30 Performa for Sale Agreement for RERA.pdf12 Apr 2019

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AADHAYAY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near D N Nagar6,700+ in Mumbai Suburban

2 kmAADHAYAYCompleted 100Lapsed / revoked 62Other 126Dot size: filed unitsN

Filed coordinates, straight-line distance. 288 registered projects within 2 km.

Builder: Sheth Creators and Harileela Projects Pvt Ltd

Sheth Creators and Harileela Projects Pvt Ltd has 1 registration on MahaRERA, including AADHAYAY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that AADHAYAY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if AADHAYAY is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AADHAYAY?

The registered promoter entity is Sheth Creators and Harileela Projects Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AADHAYAY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AADHAYAY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AADHAYAY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in AADHAYAY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AADHAYAY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AADHAYAY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.