72 WEST
By SHETH DEVELOPERS PRIVATE LIMITED
RG-MH-29225 · RERA P51800028086 · Last updated on MahaRERA portal: 10 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 6 cases
- 1 complaint at MahaRERA
- Completion date moved by 4 months
- 1 extension taken
- Rs 50.00 crore secured on the land, in favour of VIVRITI CAPITAL LIMITED
Clear
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
72 WEST is a Residential / Group Housing project by SHETH DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800028086 on 31 Jan 2021. Possession is promised by 31 Oct 2026. The completion date has moved by 4 months from the original filing. 100 of the 101 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- Name72 WEST
- TypeResidential / Group Housing
- Location
- YAMUNA NAGAR
- OSHIWARA
- Andheri
- Mumbai Suburban
- 400053
- Pincode400053
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800028086
- ReraGenie IDRG-MH-29225
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Jan 2021
- Promised completion31 Oct 2026
- Revised completionRevised to 31 Oct 2026 (originally 30 Jun 2026)
- Buildings1 building record
- Documents filed134 files
Current status
Figures as on 10 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 72 WEST | NA | 41 | 35 | 101 | 0 | 101 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 98%.
72 WEST: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 98% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 75% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 98% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed385
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| POONAM BUILDERS | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| 72 WEST | NA | Rs 126.72 cr | Rs 126.37 cr |
| - | NA | Rs 10.44 cr | Rs 3.03 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | T.A.C PVT. LTD .( Tee Arch ) |
| Architect | GA DESIGN |
| Engineer | STERLING ENGINEERING CONSULTANCY SERVICES PRIVATE LTD |
| Engineer | Anas |
| Engineer | SMARTY LACHHWANI |
| Engineer | Dinesh N Kumar |
| Engineer | Muhammad Shoeb CHOUHAN |
| Chartered Accountant | HARESH BHANUSHALI AND ASSOCIATES |
| Chartered Accountant | M.B.AGRAWAL & CO. |
| Partner | Role in project |
|---|---|
| SHETH DEVELOPERS PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. The Project is approximately 95% completed. 2. Form B uploaded. 3. PERT for the remaining completion work is uploaded in the Application. 4. The Project got delayed due to following reasons:- a. Due to the prevailing war situation and its consequential impact on the supply chain, there has been a severe shortage of construction materials and labour, adversely affecting the progress of the project. As a result, the project schedule has been disrupted. We request MahaRERA to grant an extension till 31/10/2026. We remain committed to timely completion in the interest of all stakeholder We here
Litigation declared6
| Case | Court | Status |
|---|---|---|
| Suit No 664 of 2016/2016 | High Court | Disposed |
| 206 OF 2017/2017 | HIGH COURT | Disposed as withdrawn |
| CONSUMER COMPLAIN NO 3611/2017/2017 | NATIONAL COMMITION | FOR ARGUMENT |
| APPEAL U 2 OF 2019/2019 | RERA APPELLATE TRIBUNAL | For withdrawal as settled |
| APPEAL U 5 2019/2019 | RERA APPELLATE TRIBUNAL | For withdrawal as settled |
| CIVIL SUIT NO 201564 OF 2015 AND CIVIL SUIT NO 201563 OF 2015/2015 | CITY CIVIL COURT DINDOSHI MUMBAI CITY CIVIL COURT | FOR HEARING |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000480066 | Girish Narain Bherwani | Sheth Developers Private Limited | 13/04/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Jan 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Jan 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Oct 2026
Documents filed134
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 134 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: F1.pdf | 10 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2 - 72 WEST.pdf | 10 Aug 2026 |
| Withdrawal Update Form 3File: Form 3_72 West_June 26.pdf | 10 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form - 2A - 72 West.pdf | 9 Jul 2026 |
| Withdrawal Update Form 1File: bForm 1 72West.pdf | 5 May 2026 |
| Withdrawal Update Form 2File: 72 WEST.pdf | 5 May 2026 |
| Withdrawal Update Form 3File: Form - 3_72 West_Mar 26.pdf | 5 May 2026 |
| Withdrawal Update Form 1File: Form 1 72West.pdf | 2 Feb 2026 |
| Withdrawal Update Form 2File: 72 WEST.pdf | 2 Feb 2026 |
| Withdrawal Update Form 3File: Form-3_72 West_Dec 25_Signed.pdf | 2 Feb 2026 |
| Withdrawal Update Form 1File: Form - 1 72 West 41125.pdf | 12 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2 - 72 WEST.pdf | 12 Dec 2025 |
| Withdrawal Update Form 3File: Form-3_72-West_Sept 25 Signed.pdf | 12 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form - 5_72-West_2024-25-Signed.pdf | 25 Nov 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A 72 WEST.pdf | 10 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 - 72 West.pdf | 6 Oct 2025 |
| Withdrawal Update Form 2File: 72 WEST.pdf | 6 Oct 2025 |
| Withdrawal Update Form 3File: Form - 3 72 West.pdf | 6 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 72 West.pdf | 2 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 -72 West.pdf | 29 Apr 2025 |
| FORM 2 - 72 West | 29 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 72 WEST 1.pdf | 29 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 72 WEST.pdf | 22 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 72 WEST.pdf | 22 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 72 WEST.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 72 West.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 72 West.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 72 West.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 - 72 West.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3- 72 West.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 - 72 West.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3- 72 West.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3- 72 West.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 - 72 West.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 72 WEST-FORM -1-Architect Certificate.pdf | 29 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 72 WEST-Form 2.pdf | 29 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 72 WEST-Form 3.pdf | 29 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 72 WEST.pdf | 29 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 72 WEST-FORM -1-Architect Certificate.pdf | 29 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 72 WEST-Form 2.pdf | 29 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 72 WEST-Form 3.pdf | 29 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 72 WEST.pdf | 29 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 72 WEST-FORM -1-Architect Certificate.pdf | 29 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 72 WEST-Form 3.pdf | 29 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 72 WEST-Form 2.pdf | 29 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 72 WEST.pdf | 29 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 - 72 WEST.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 - 72 WEST.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 - 72 WEST.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 72 WEST.pdf | 6 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 72 West.pdf | 26 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 -72 WEST.pdf | 26 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 -72 WEST.pdf | 26 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf | 12 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2.pdf | 12 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3.pdf | 12 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1.pdf | 8 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2.pdf | 8 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3.pdf | 8 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 4.pdf | 8 May 2024 |
| Disclosure of sold/ booked inventoryFile: 72 WEST.pdf | 3 May 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_Sheth.pdf | 29 Apr 2024 |
| Details of encumbrancesFile: Details of Encumbrances.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 72 West.pdf | 23 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 - 72 West.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 - 72 West.pdf | 22 Apr 2024 |
| Building plan approvalFile: Amended Approval Plan.pdf | 2 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended Approval Plan.pdf | 2 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: FULL CC.pdf | 2 Feb 2024 |
| Declaration about Commencement CertificateFile: Form-D 72-West.pdf | 2 Feb 2024 |
| Declaration about Commencement CertificateFile: Form D.pdf | 2 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: 72 WEST (1).pdf | 31 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-72 West.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 - 72-West.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 - 72-West.pdf | 16 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1) 1st quater.pdf | 7 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2) 2nd quater.pdf | 7 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 3) 3rd quater.pdf | 7 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 4) 4th quater.pdf | 7 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 72 West_compressed.pdf | 7 Nov 2023 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SIGMA | ZANDU PHARMACTICAL GOKHALE ROAD SOUTH DADAR W MUMBAI - 25 | 260 | Completed | Jul 2014 | Late, Dec 2014 |
| VIVIANA MALL | Viviana Mall Voltas Compound Pokharan Rd No 2 Majiwade Thane w 400601 | 240 | Completed | Sep 2013 | Sep 2013 |
| Vasant Lawns | Vasant Lawns Voltas Compound Pokharan Rd No 2 Majiwade Thane w 400601 | 465 | Completed | Mar 2012 | Late, Nov 2013 |
| VASANT MARVEL | WESTRN EXPRESS HIGHWAY BORIWALI EAST MUMBAI - 66 | 641 | Completed | Oct 2011 | Late, Dec 2012 |
| CNERGY | APPASAHEB MARATHE MARG PRABHADEVI MUMBAI 25 | 33 | Completed | Sep 2011 | Sep 2011 |
| BEAUMONDE | APPASAHEB MARATHE MARG PRABHADEVI MUMBAI | 196 | Completed | Jul 2011 | Late, Jan 2012 |
| VASANT GALAXY | JUNCTION OF MG ROAD AND LINK ROAD BANGUR NAGAR GOREGAON WEST MUMBAI | 803 | Completed | Oct 2010 | Late, Mar 2011 |
| VASANT VALLEY | MALAD EAST MUMBAI 96 | 127 | Completed | Jun 2010 | Late, Dec 2010 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 134 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep 72 WEST on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near OSHIWARA6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 231 registered projects within 2 km.
LIVSMART KURLA
D. K. REALTY (INDIA) PVT. LTD.
MOONGIPA ARCADE
MOONGIPA REALTY PRIVATE LIMITED
LINKBAY RESIDENCES PHASE I
PORTSMOUTH BUILDCON PRIVATE LIMITED
Purva Estrella
Puravankara Ltd
78 LAKE TOWN
ANIRDESH DEVELOPERS PRIVATE LIMITED
Transcon Triumph Tower 2
Transcon Triumph Phase 2 Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: SHETH DEVELOPERS PRIVATE LIMITED
Sheth Developers Private Limited has 10 registrations on MahaRERA, including VASANT FIONA and CLARION. Its filings disclose 11 earlier MahaRERA projects: declares 2 of 9 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if 72 WEST is delayed beyond 31 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 72 WEST?
The registered promoter entity is SHETH DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 72 WEST?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against 72 WEST?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for 72 WEST?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 72 WEST?
The professionals named in the filing: Architect: T.A.C PVT. LTD .( Tee Arch ); Architect: GA DESIGN; Engineer: STERLING ENGINEERING CONSULTANCY SERVICES PRIVATE LTD; Engineer: Anas; Engineer: SMARTY LACHHWANI; Engineer: Dinesh N Kumar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 72 WEST?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.