Registered Litigation declared Residential / Group Housing project

72 WEST

By SHETH DEVELOPERS PRIVATE LIMITED

RG-MH-29225 · RERA P51800028086 · Last updated on MahaRERA portal: 10 Aug 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 6 cases
  • 1 complaint at MahaRERA
  • Completion date moved by 4 months
  • 1 extension taken
  • Rs 50.00 crore secured on the land, in favour of VIVRITI CAPITAL LIMITED

Clear

  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 4 months from the original
10 of 11Construction stages donefurthest along: Stilt Floor, 98%
1 of 101Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 134 documents Report an error

72 WEST is a Residential / Group Housing project by SHETH DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800028086 on 31 Jan 2021. Possession is promised by 31 Oct 2026. The completion date has moved by 4 months from the original filing. 100 of the 101 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • Name72 WEST
  • TypeResidential / Group Housing
  • Location
    • YAMUNA NAGAR
    • OSHIWARA
    • Andheri
    • Mumbai Suburban
    • 400053
  • Pincode400053
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800028086
  • ReraGenie IDRG-MH-29225

Builder

  • NameSHETH DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorASHWIN SHETH
  • Other registrations9 more →
  • Completed3 of 10
  • Declared earlier projects11 →

Key dates

this monthRegisteredJan 2021First promiseJun 2026Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jan 2021
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 30 Jun 2026)
  • Buildings1 building record
  • Documents filed134 files

Current status

99%100 of 101 units booked
94.3%Work done, per cost certificate

Figures as on 10 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
72 WESTNA41351010101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 98%.

72 WEST: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor98%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes75%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes98%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed385

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots385
Closed/Covered385

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,797 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofVIVRITI CAPITAL LIMITED
Secured amountRs 50.00 crore
CERSAI search filedYes
Declared on30 Sep 2024
LandownerVillageDistrict
POONAM BUILDERSBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI25828.94
Proposed, not sanctioned5,246 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOLDONGARI
Estimated costRs 137.16 cr
Cost incurredRs 129.40 cr
Work done94.35%
BuildingWingEstimatedIncurred
72 WESTNARs 126.72 crRs 126.37 cr
-NARs 10.44 crRs 3.03 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectT.A.C PVT. LTD .( Tee Arch )
ArchitectGA DESIGN
EngineerSTERLING ENGINEERING CONSULTANCY SERVICES PRIVATE LTD
EngineerAnas
EngineerSMARTY LACHHWANI
EngineerDinesh N Kumar
EngineerMuhammad Shoeb CHOUHAN
Chartered AccountantHARESH BHANUSHALI AND ASSOCIATES
Chartered AccountantM.B.AGRAWAL & CO.
PartnerRole in project
SHETH DEVELOPERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA09072621704Jun 2026 → Oct 2026

Reason as filed by the promoter1. The Project is approximately 95% completed. 2. Form B uploaded. 3. PERT for the remaining completion work is uploaded in the Application. 4. The Project got delayed due to following reasons:- a. Due to the prevailing war situation and its consequential impact on the supply chain, there has been a severe shortage of construction materials and labour, adversely affecting the progress of the project. As a result, the project schedule has been disrupted. We request MahaRERA to grant an extension till 31/10/2026. We remain committed to timely completion in the interest of all stakeholder We here

Litigation declared6

CaseCourtStatus
Suit No 664 of 2016/2016High CourtDisposed
206 OF 2017/2017HIGH COURTDisposed as withdrawn
CONSUMER COMPLAIN NO 3611/2017/2017NATIONAL COMMITIONFOR ARGUMENT
APPEAL U 2 OF 2019/2019RERA APPELLATE TRIBUNALFor withdrawal as settled
APPEAL U 5 2019/2019RERA APPELLATE TRIBUNALFor withdrawal as settled
CIVIL SUIT NO 201564 OF 2015 AND CIVIL SUIT NO 201563 OF 2015/2015CITY CIVIL COURT DINDOSHI MUMBAI CITY CIVIL COURTFOR HEARING

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000480066Girish Narain BherwaniSheth Developers Private Limited13/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed134

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 134 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: F1.pdf10 Aug 2026
Withdrawal Update Form 2File: FORM 2 - 72 WEST.pdf10 Aug 2026
Withdrawal Update Form 3File: Form 3_72 West_June 26.pdf10 Aug 2026
Form 2A (FY 2025-2026)File: Form - 2A - 72 West.pdf9 Jul 2026
Withdrawal Update Form 1File: bForm 1 72West.pdf5 May 2026
Withdrawal Update Form 2File: 72 WEST.pdf5 May 2026
Withdrawal Update Form 3File: Form - 3_72 West_Mar 26.pdf5 May 2026
Withdrawal Update Form 1File: Form 1 72West.pdf2 Feb 2026
Withdrawal Update Form 2File: 72 WEST.pdf2 Feb 2026
Withdrawal Update Form 3File: Form-3_72 West_Dec 25_Signed.pdf2 Feb 2026
Withdrawal Update Form 1File: Form - 1 72 West 41125.pdf12 Dec 2025
Withdrawal Update Form 2File: FORM 2 - 72 WEST.pdf12 Dec 2025
Withdrawal Update Form 3File: Form-3_72-West_Sept 25 Signed.pdf12 Dec 2025
Form 5 (FY 2024-2025)File: Form - 5_72-West_2024-25-Signed.pdf25 Nov 2025
Form 2A (FY 2024-2025)File: FORM 2A 72 WEST.pdf10 Nov 2025
Withdrawal Update Form 1File: Form 1 - 72 West.pdf6 Oct 2025
Withdrawal Update Form 2File: 72 WEST.pdf6 Oct 2025
Withdrawal Update Form 3File: Form - 3 72 West.pdf6 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 72 West.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 -72 West.pdf29 Apr 2025
FORM 2 - 72 West29 Apr 2025
Disclosure of sold/ booked inventoryFile: 72 WEST 1.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 72 WEST.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: 72 WEST.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: 72 WEST.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 72 West.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 72 West.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 72 West.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 - 72 West.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3- 72 West.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 - 72 West.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3- 72 West.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3- 72 West.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 - 72 West.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 72 WEST-FORM -1-Architect Certificate.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 72 WEST-Form 2.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 72 WEST-Form 3.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: 72 WEST.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 72 WEST-FORM -1-Architect Certificate.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 72 WEST-Form 2.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 72 WEST-Form 3.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: 72 WEST.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 72 WEST-FORM -1-Architect Certificate.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 72 WEST-Form 3.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 72 WEST-Form 2.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: 72 WEST.pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 - 72 WEST.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 - 72 WEST.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 - 72 WEST.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: 72 WEST.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 72 West.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 -72 WEST.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 -72 WEST.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf12 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2.pdf12 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3.pdf12 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1.pdf8 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2.pdf8 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3.pdf8 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 4.pdf8 May 2024
Disclosure of sold/ booked inventoryFile: 72 WEST.pdf3 May 2024
CERSAI detailsFile: CERSAI_Search_Report_Sheth.pdf29 Apr 2024
Details of encumbrancesFile: Details of Encumbrances.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 72 West.pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 - 72 West.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 - 72 West.pdf22 Apr 2024
Building plan approvalFile: Amended Approval Plan.pdf2 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Approval Plan.pdf2 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: FULL CC.pdf2 Feb 2024
Declaration about Commencement CertificateFile: Form-D 72-West.pdf2 Feb 2024
Declaration about Commencement CertificateFile: Form D.pdf2 Feb 2024
Disclosure of sold/ booked inventoryFile: 72 WEST (1).pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-72 West.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 - 72-West.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 - 72-West.pdf16 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1) 1st quater.pdf7 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2) 2nd quater.pdf7 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 3) 3rd quater.pdf7 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 4) 4th quater.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 72 West_compressed.pdf7 Nov 2023

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise6 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SIGMAZANDU PHARMACTICAL GOKHALE ROAD SOUTH DADAR W MUMBAI - 25260CompletedJul 2014Late, Dec 2014
VIVIANA MALLViviana Mall Voltas Compound Pokharan Rd No 2 Majiwade Thane w 400601240CompletedSep 2013Sep 2013
Vasant LawnsVasant Lawns Voltas Compound Pokharan Rd No 2 Majiwade Thane w 400601465CompletedMar 2012Late, Nov 2013
VASANT MARVELWESTRN EXPRESS HIGHWAY BORIWALI EAST MUMBAI - 66641CompletedOct 2011Late, Dec 2012
CNERGYAPPASAHEB MARATHE MARG PRABHADEVI MUMBAI 2533CompletedSep 2011Sep 2011
BEAUMONDEAPPASAHEB MARATHE MARG PRABHADEVI MUMBAI196CompletedJul 2011Late, Jan 2012
VASANT GALAXYJUNCTION OF MG ROAD AND LINK ROAD BANGUR NAGAR GOREGAON WEST MUMBAI803CompletedOct 2010Late, Mar 2011
VASANT VALLEYMALAD EAST MUMBAI 96127CompletedJun 2010Late, Dec 2010

How this compares with Mumbai Suburban

99%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 4 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 72 WEST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OSHIWARA6,700+ in Mumbai Suburban

2 km72 WESTCompleted 85Lapsed / revoked 59Abeyance 1Other 86Dot size: filed unitsN

Filed coordinates, straight-line distance. 231 registered projects within 2 km.

Builder: SHETH DEVELOPERS PRIVATE LIMITED

Sheth Developers Private Limited has 10 registrations on MahaRERA, including VASANT FIONA and CLARION. Its filings disclose 11 earlier MahaRERA projects: declares 2 of 9 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if 72 WEST is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 72 WEST?

The registered promoter entity is SHETH DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 72 WEST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 72 WEST?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 72 WEST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 72 WEST?

The professionals named in the filing: Architect: T.A.C PVT. LTD .( Tee Arch ); Architect: GA DESIGN; Engineer: STERLING ENGINEERING CONSULTANCY SERVICES PRIVATE LTD; Engineer: Anas; Engineer: SMARTY LACHHWANI; Engineer: Dinesh N Kumar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 72 WEST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 72 WEST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 72 WEST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.