Registration lapsed No litigation declared Residential / Group Housing project

72 GREENS

By A M PATEL INFRA

RG-MH-07968 · RERA P51400020322 · Last updated on MahaRERA portal: 14 Aug 2021

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 31 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Jalna registration emailed to you, free during the pilot beta.
Mar 2024Possession promised31 months past this date
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 20%
0Complaints at MahaRERAon this registration
Jump to the 40 documents Report an error

72 GREENS is a Residential / Group Housing project by A M PATEL INFRA in Jalna, Maharashtra, registered with MahaRERA as P51400020322 on 5 Apr 2019. Possession was promised by 30 Mar 2024 and is now 31 months past that date.

At a glance

Project

  • Name72 GREENS
  • TypeResidential / Group Housing
  • Location
    • JALNA ROAD
    • GUT NO 73
    • Deogaon
    • Badnapur
    • Jalna
    • 431202
  • Pincode431202
  • RERA no.P51400020322
  • ReraGenie IDRG-MH-07968

Builder

  • NameA M PATEL INFRA
  • Entity typePartnership
  • PartnersBHAVEN BHASKARBHAI AMIN, KHAN YASAR MANZOOR KHAN, KHAN AAMER MANZOOR KHAN

Key dates

31 months past promisethis monthRegisteredApr 2019PromisedMar 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Apr 2019
  • Promised completion30 Mar 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed40 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA1440000
CLUB HOUSE ANA20000
CLUB HOUSE BNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 14 Aug 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 20%.

A2%
ActivityProgress
Excavation20%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
CLUB HOUSE A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
CLUB HOUSE B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Aug 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed94

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots94
Closed/Covered2
Open Space92
BuildingClosed/CoveredOpen SpaceTotal
A07272
CLUB HOUSE A11011
CLUB HOUSE B11011

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area92,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12492.0
Proposed, not sanctioned12,492 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCITY CHOWK AURANGABAD

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR HARES MOHD SIDDIQUI
PartnerRole in project
A M PATEL INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jun 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed40

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Cer No 0001.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Cer No 0002.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Cer No 0003.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Cer No 0004.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Cer No 0007.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Cer No 0005.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Cer No 0006.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Cer No 0006.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Cer No 0008.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Cer No 0009.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: sold inventory 72 green pdf_0001_.pdf14 Aug 2021
Certificates of CA (Form 3)File: 72 Green FORM 3.pdf14 Aug 2021
Layout approvalFile: Commencement Certificate.pdf23 Mar 2019
Copy of Layout Approval (in case of layout)File: Commencement Certificate.pdf23 Mar 2019
Building plan approvalFile: Sanction Plan_01.PDF13 Mar 2019
Building plan approvalFile: Sanction Plan_02.PDF13 Mar 2019
Layout approvalFile: Sanction Plan_01.PDF13 Mar 2019
Layout approvalFile: Sanction Plan_01.PDF13 Mar 2019
Copy of Layout Approval (in case of layout)File: Sanction Plan_01.PDF13 Mar 2019
Copy of Layout Approval (in case of layout)File: Sanction Plan_01.PDF13 Mar 2019
Building Plan Approval (IOD)File: Sanction Plan_01.PDF13 Mar 2019
Building Plan Approval (IOD)File: Sanction Plan_02.PDF13 Mar 2019
Proforma of Allotment letterFile: Agreement to Sell-Farm House UNITS 06072018.pdf7 Jun 2018
Building plan approvalFile: CC Part 3.pdf2 Jun 2018
Layout approvalFile: CC Part 1.pdf2 Jun 2018
Layout approvalFile: CC part 2.pdf2 Jun 2018
Copy of Layout Approval (in case of layout)File: CC Part 1.pdf2 Jun 2018
Copy of Layout Approval (in case of layout)File: CC part 2.pdf2 Jun 2018
Building Plan Approval (IOD)File: CC Part 3.pdf2 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: CC Part 3.pdf2 Jun 2018
Certificates of CA (Form 3)File: CA Certificate 72 greens 01062018 (1).pdf2 Jun 2018
Copy of the legal title reportFile: SEARCH REPORT 72 GREENS 01062018-ilovepdf-compressed (1).pdf1 Jun 2018
Details of encumbrancesFile: SEARCH REPORT 72 GREENS 01062018-ilovepdf-compressed (1).pdf1 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: CC Part 1.pdf1 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: CC part 2.pdf1 Jun 2018
Declaration in FORM BFile: Affidavit Cum Declaration 1.pdf1 Jun 2018
Declaration in FORM BFile: Affidavit Cum Declaration 2.pdf1 Jun 2018
Declaration in FORM BFile: Affidavit Cum Declaration 3.pdf1 Jun 2018
Declaration in FORM BFile: Affidavit Cum Declaration 4.pdf1 Jun 2018

How this compares with Jalna

8%of Jalna projects moved their completion datethis one has not
41%of Jalna registrations have lapsed or been cancelledthis one is among them

Computed across the 100+ Jalna projects on ReraGenie, from their own filings.

Keep 72 GREENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GUT NO 73100+ in Jalna

Builder: A M PATEL INFRA

A M PATEL INFRA has 1 registration on MahaRERA, including 72 GREENS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Jalna district page.

Frequently asked questions

What does it mean that 72 GREENS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if 72 GREENS is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 72 GREENS?

The registered promoter entity is A M PATEL INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 72 GREENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 72 GREENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 72 GREENS?

The professionals named in the filing: Architect: MR HARES MOHD SIDDIQUI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 72 GREENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 72 GREENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 72 GREENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.