Home / Browse projects / Pune, Maharashtra / 343 CREST
343 CREST
By Gera Developments Private Limited, Happy Face Investments Private Limited and Gera Developers LLP
RG-MH-05010 · RERA P52100022737 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 3 cases
- Completion date moved by 12 months
- 1 extension taken
Clear
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
343 CREST is a Commercial project by Gera Developments Private Limited, Happy Face Investments Private Limited and Gera Developers LLP in Pune, Maharashtra, registered with MahaRERA as P52100022737 on 16 Oct 2019. Possession is promised by 30 Dec 2027. The completion date has moved by 12 months from the original filing.
At a glance
Project
- Name343 CREST
- TypeCommercial
- Location
- 24m RP road
- Upper Kharadi Pune
- WAGHOLI
- Haveli
- Pune
- 412207
- Pincode412207
- RERA no.P52100022737
- ReraGenie IDRG-MH-05010
Builder
- NameGera Developments Private Limited, Happy Face Investments Private Limited and Gera Developers LLP
- Entity typeCompany
- CINU70102PN1988PTC049303
- GSTIN27AAACG6703F1ZW
- Managing DirectorRohit Gera
- ChairpersonKumar Gera
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Oct 2019
- Promised completion30 Dec 2027
- Revised completionRevised to 30 Dec 2027 (originally 30 Dec 2026)
- Buildings1 building record
- Documents filed107 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Commercial Tower | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 74%.
Commercial Tower: 18% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 74% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 29% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 60% |
| Water Supply | Yes | 20% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 25% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | Yes | 30% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed60
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Commercial Tower | NA | Rs 31.98 cr | Rs 5.78 cr |
| - | NA | Rs 1.99 cr | Rs 35.91 lakh |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Gera Developments |
| Architect | Deepesh Bhurat |
| Engineer | Santosh Tiwatne |
| Engineer | Ashish Rajigare |
| Chartered Accountant | Deepak A Shah |
| Chartered Accountant | Shah Khandelwal Jain & Associates |
| Chartered Accountant | Jain Doshi and Associates |
| Partner | Role in project |
|---|---|
| Gera Developments Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe, hereby apply for extension u/s 6 of the registered project bearing registration number P52100022737. (Since we are not allowed under correction) Project was registered in October 2019, however sales and construction of the project is not yet commenced due to market conditions. Now we are getting the said project launched and initiating the construction at site and will be opening the project for sale. Hence, we request you to grant us the extension from the date 30/12/2026 to 30/12/2027. Note: We have not sold any units nor accepted any advance money for any unit of the project till date a
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 1504/2018 | Civil Court Pune | Closed |
| 1848/2019 | Civil Court Pune | Ongoing |
| 154/2020 | District | Closed |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Oct 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Oct 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Oct 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Oct 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2027
Documents filed107
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: 343-RERA CERTIFICATE.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Engineer Certificate 343 Crest 31032026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate 343 Crest 31032026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: WOJ_RERA CERTIFICATE_343 CREST.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate- 343 Crest.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: 343 CREST.pdf | 20 Jan 2026 |
| Commencement certificateFile: Revised CC 27052025.pdf | 3 Oct 2025 |
| Layout approvalFile: Layput 27052025_11zon.pdf | 3 Oct 2025 |
| Building plan approvalFile: BP 1.pdf | 3 Oct 2025 |
| Building plan approvalFile: Bp 2.pdf | 3 Oct 2025 |
| Building plan approvalFile: BP 3.pdf | 3 Oct 2025 |
| Building plan approvalFile: BP 4.pdf | 3 Oct 2025 |
| Building plan approvalFile: Elevation.pdf | 3 Oct 2025 |
| Building plan approvalFile: Section.pdf | 3 Oct 2025 |
| Withdrawal Update Form 1File: New FORM 1.pdf | 3 Oct 2025 |
| Withdrawal Update Form 2File: New FORM 2.pdf | 3 Oct 2025 |
| Withdrawal Update Form 3File: New Form 3_11zon.pdf | 3 Oct 2025 |
| Form 5 (FY 2024-2025)File: 343 Crest FY24-25.pdf | 22 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 343 CREST.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 343 Crest 31032025_11zon.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 343 CREST ENGINEERS CERTIFICATE 31032025.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WOJ 343 Crest.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 343 CREST.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - 343 crest 31122024.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 343 CREST.pdf | 20 Jan 2025 |
| Home Buyer /Allottee Grievance Redressal CellFile: GRC.pdf | 7 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 343 Crest 3092024.pdf | 5 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gera WOJ Imperium 30092024.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 343 Crest 30092024.pdf | 20 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 343 Crest_compressed.pdf | 9 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 343 CREST.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 343 Crest FORM 1.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 343 crest 30062024.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 343 CREST (2).pdf | 19 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 343 crest.pdf | 29 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 343 CREST.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: 343 CREST.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 343 CREST (2).pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: WOJ Imperium Engineer Certificate 31122023.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DIsc of Sold Unsold Imperium.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WOJ Imperium 31122023_compressed.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Geras Imperium Q2.pdf | 20 Oct 2023 |
| Building plan approvalFile: 63.pdf | 29 Sep 2023 |
| Building plan approvalFile: 64.pdf | 29 Sep 2023 |
| Building plan approvalFile: 65.pdf | 29 Sep 2023 |
| Building plan approvalFile: 66.pdf | 29 Sep 2023 |
| Building plan approvalFile: 67.pdf | 29 Sep 2023 |
| Layout approvalFile: Layout_compressed (3).pdf | 29 Sep 2023 |
| Copy of Layout Approval (in case of layout)File: Layout_compressed (3).pdf | 29 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 63.pdf | 29 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 64.pdf | 29 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 65.pdf | 29 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 66.pdf | 29 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 67.pdf | 29 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf | 29 Sep 2023 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 29 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gera's Imperium Rera Certificate form 1.pdf | 29 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE WOJ IMPERIUM 29082023_compressed.pdf | 29 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 230819233002_0001.pdf | 29 Sep 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Bank Account.PDF | 29 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 Notes_Geras Imperium.pdf | 11 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Imperium 2A -5-6.pdf | 19 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20).pdf | 3 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Document_1680507612_compressed.pdf | 3 Apr 2023 |
| PAN CardFile: 2B- GDPL PAN.pdf | 16 Feb 2023 |
| Declaration in FORM BFile: FORM B WOJ IMPERIUM.PDF | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gera imperium Form-1 Architect's certificate.pdf | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GIMp.pdf | 16 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 WOJ Imperium.pdf | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A SHRISHTI 21-22.pdf | 23 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form_5_WOJ_Imperium_Notes_Signed.pdf | 17 Oct 2022 |
| OtherFile: Form_5_WOJ_Imperium_Notes_Signed.pdf | 27 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CertiWOJ Imperium 25032022.pdf | 8 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: PROJEVCT IMPERIUM.PDF | 7 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Inv- WOJ M.pdf | 7 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Inv- Imp.pdf | 7 Apr 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_WOJ_Gera Properties Private Limited.pdf | 7 Apr 2022 |
| CERSAI detailsFile: CERSAI Report (Asset Based) - WOJ.pdf | 4 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: IMPERIUM_compressed.pdf | 3 Feb 2022 |
| Declaration about Commencement CertificateFile: Declaration-CC Imperium.pdf | 2 Feb 2022 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Geras Imperium Green | Chalta no 13 part of PT Sheet no 73Plot no AX neogi nagar Rua de Ourem road | 61 | Completed | Apr 2019 | May 2016 |
| Geras Greenville Song of Joy A1 and A2 | Survey no 64 Hissa no 1 to 6 Kharadi | 120 | Completed | Apr 2017 | Oct 2016 |
| Geras Greenville Trinity Tower | Survey no 64 Hissa no 1 to 6 | 248 | Completed | Nov 2015 | Oct 2015 |
| Regent Tower | Survey No 33 Hissa No 2 2 Village Baner | 9 | Completed | Nov 2014 | Sep 2014 |
| Geras Park View I | Survey no 73 Hissa No 1 | 227 | Completed | Apr 2014 | Late, Mar 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 107 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep 343 CREST on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Upper Kharadi Pune13,700+ in Pune
Yashwin Enchante Phase 2
Vilas Javdekar Infinitee Developers Pvt. L
Godrej Greens
DREAM WORLD LANDMARKS LLP
Yashwin Enchante Phase 1
Vilas Javdekar Infinitee Developers Pvt. L
Kohinoor Kaleido
Intofinity Promoters Private Limited
VIJAY VIHAR
COL. RPS RAWAT
FLAMANTE BY VTP LUXE PHASE 1
INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMI
Builder: Gera Developments Private Limited, Happy Face Investments Private Limited and Gera Developers LLP
Gera Developments Private Limited, Happy Face Investments Private Limited and Gera Developers LLP has 1 registration on MahaRERA, including 343 CREST. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if 343 CREST is delayed beyond 30 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 343 CREST?
The registered promoter entity is Gera Developments Private Limited, Happy Face Investments Private Limited and Gera Developers LLP, a company as per the filing. Its CIN U70102PN1988PTC049303 and GSTIN 27AAACG6703F1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 343 CREST?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for 343 CREST?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 343 CREST?
The professionals named in the filing: Architect: Gera Developments; Architect: Deepesh Bhurat; Engineer: Santosh Tiwatne; Engineer: Ashish Rajigare; Chartered Accountant: Deepak A Shah; Chartered Accountant: Shah Khandelwal Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 343 CREST?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback