ReraGenieLog inGet a buyer report

Home / Browse projects / 29 GOLD COAST PHASE 6

Registration lapsed No litigation declared Others project

29 GOLD COAST PHASE 6

By MANTRA 29 GOLD COST DEVELOPERS LLP

RG-MH-17490 · RERA P52100029378 · Last updated on MahaRERA portal: 25 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2025Possession promised10 months past this date
55 of 55Construction stages doneacross 5 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 161 documents Report an error

29 GOLD COAST PHASE 6 is a Others project by MANTRA 29 GOLD COST DEVELOPERS LLP in DHANORI, 411015, registered with MahaRERA as P52100029378 on 29 May 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • Name29 GOLD COAST PHASE 6
  • TypeOthers
  • Location
    • DHANORI
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100029378
  • ReraGenie IDRG-MH-17490

Builder

  • NameMANTRA 29 GOLD COST DEVELOPERS LLP
  • Entity typePartnership
  • PartnersKISHOR POPATLAL GADA, NILESH POPATLAL GADA, MUKESH POPATLAL GADA, SHYAMKUMAR DWARKADAS MAHESHWARI, MANTRA PROPERTIES AND DEVELOPERS PRIVATE LIMITED THROUGH ITS PARTNER ROHIT GHANSHYAM GUPTA, MUKESH POPATLAL GADA, KISHOR POPATLAL GADA, NILESH POPATLAL GADA, SHYAMKUMAR DWARKADAS MAHESHWARI, MANTRA PROPERTIES AND DEVELOPERS PRIVATE LIMITED THROUGH ITS PARTNER ROHIT GHANSHYAM GUPTA, MUKESH POPATLAL GADA, KISHOR POPATLAL GADA and 18 more
  • Other registrations6 more →
  • Completed5 of 7
  • No longer live2 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredMay 2021First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 May 2021
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2024)
  • Buildings5 building records
  • Documents filed161 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING D1NA60000
BUILDING D2NA60000
BUILDING D3NA60000
BUILDING D4NA60000
BUILDING D5NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 25 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

55 of 55 construction stages are filed complete across 5 buildings.

BUILDING D1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING D2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING D3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING D4100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING D5100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes80%
Open ParkingYes80%

Parking filed128

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots128
Closed/Covered128
BuildingClosed/CoveredTotal
BUILDING D13131
BUILDING D22929
BUILDING D32323
BUILDING D42323
BUILDING D52222

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,630 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
MANGAL MILAN CO OP SOCPune (M Corp.)Pune
MANTRA BUILDCON LLP-Pune
GANESH VITTHAL TINGARE-Pune

Approvals and building plan

Sanctioning authorityPoona Municipal Corporation
Permissible FSI20003.29
Proposed, not sanctioned20,003 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPB NO 7 KASARWADI PIMPRI PUNE 411034

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA design studio
ArchitectMitesh Siddhpura and Associates
EngineerDesign werkz
EngineerRavi Rawal
Chartered AccountantSHRUTI AGARWAL
Chartered AccountantR DEVENDRAKUMAR AND ASSOCIATES
PartnerRole in project
MANTRA 29 GOLD COST DEVELOPERS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100013356Dec 2024 → Dec 2025

Reason as filed by the promoterLaunch of Project is Delayed and therefore applying for Extension.

Litigation declared4

CaseCourtStatus
1363/2016/2016CIVIL JUDGE SENIOR DIVISION PUNEFilling of Evidance affidavit by plaintiff Court has given next date
1364/2016/2016CIVIL JUDGE SENIOR DIVISION PUNEFilling of Evidance affidavit by plaintiff Court has given next date
839/2017/2017CIVIL JUDGE SENIOR DIVISION PUNEW S Filed by our side next date for hearing on Ex Court has given next date
1507/2018/2017CIVIL JUDGE SENIOR DIVISION PUNEW S Filed by our side next date for hearing on Ex Court has given next date

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 May 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jun 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jun 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed161

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 161 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect Ph 6_0001.pdf25 Jul 2025
Form 2File: Engi Ph 6.pdf25 Jul 2025
Form 3File: CA Certificate_29 GC_Phase 6_compressed.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Ph 6.pdf25 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate 29 GC compressed.pdf24 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate 29 GC compressed.pdf24 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 6.pdf24 Jun 2025
Layout approvalFile: 01 Layout Plan compressed.pdf16 Jun 2025
Building plan approvalFile: 02 Parking Layout.pdf16 Jun 2025
Copy of Layout Approval (in case of layout)File: 01 Layout Plan compressed.pdf16 Jun 2025
Building Plan Approval / NA Order for plotted developmentFile: 02 Parking Layout.pdf16 Jun 2025
Form 1File: Archi Ph 6.pdf3 Jun 2025
Form 2File: Engi Ph 6.pdf3 Jun 2025
Form 3File: CA Ph 6.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Ph 6.pdf3 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi Ph 6.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Ph 6.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Ph 6.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 6.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi Ph 6.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 6.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Ph 6.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD PHASE 6.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 29 GC Ph 6.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 6.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Ph 6.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Ph 6.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 6.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD PH 6.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PH 6.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 PH 6.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PH 6.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Mantra 29 Gold Ph-6.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch D1 to D5.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC- D1 to D5 Ph6.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold - D1 to D5.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - D1 to D5.pdf18 Apr 2024
Building plan approvalFile: 03 Parking Layout compressed.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 03 Parking Layout compressed.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 6.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 6.pdf10 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 6.pdf10 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 6.pdf10 Jan 2024
Layout approvalFile: Layout Plan_compressed.pdf21 Dec 2023
Layout approvalFile: Parking Layout.pdf21 Dec 2023
Layout approvalFile: Parking Layout (2).pdf21 Dec 2023
Building plan approvalFile: 1 Bldg D1 D1A.pdf21 Dec 2023
Building plan approvalFile: 2 Bldg D1 D1A.pdf21 Dec 2023
Building plan approvalFile: 3 Bldg D1 D1A.pdf21 Dec 2023
Building plan approvalFile: 4 Bldg D1 D1A.pdf21 Dec 2023
Building plan approvalFile: 5 Bldg D2 D2A.pdf21 Dec 2023
Building plan approvalFile: 6 Bldg D2 D2A.pdf21 Dec 2023
Building plan approvalFile: 7 Bldg D2 D2A.pdf21 Dec 2023
Building plan approvalFile: 8 Bldg D3.pdf21 Dec 2023
Building plan approvalFile: 9 Bldg D3.pdf21 Dec 2023
Building plan approvalFile: 10 Bldg D3.pdf21 Dec 2023
Building plan approvalFile: 11 Bldg D4.pdf21 Dec 2023
Building plan approvalFile: 12 Bldg D4.pdf21 Dec 2023
Building plan approvalFile: 13 Bldg D4.pdf21 Dec 2023
Building plan approvalFile: 14 Bldg D5.pdf21 Dec 2023
Building plan approvalFile: 15 Bldg D5.pdf21 Dec 2023
Building plan approvalFile: 16 Bldg D5.pdf21 Dec 2023
Copy of Layout Approval (in case of layout)File: Layout Plan_compressed.pdf21 Dec 2023
Copy of Layout Approval (in case of layout)File: Parking Layout.pdf21 Dec 2023
Copy of Layout Approval (in case of layout)File: Parking Layout (2).pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Bldg D1 D1A.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 Bldg D1 D1A.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 3 Bldg D1 D1A.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 4 Bldg D1 D1A.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 5 Bldg D2 D2A.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 6 Bldg D2 D2A.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 7 Bldg D2 D2A.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 8 Bldg D3.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 9 Bldg D3.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 10 Bldg D3.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 11 Bldg D4.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 12 Bldg D4.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 13 Bldg D4.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 14 Bldg D5.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 15 Bldg D5.pdf21 Dec 2023

Keep 29 GOLD COAST PHASE 6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHANORI

2 km29 GOLD COAST PHASE 6Completed 37Lapsed / revoked 18Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 75 registered projects within 2 km.

Builder: MANTRA 29 GOLD COST DEVELOPERS LLP

MANTRA 29 GOLD COST DEVELOPERS LLP has 7 registrations on MahaRERA, including 29 GOLD COAST PHASE 1 and 29 GOLD COAST PHASE 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What does it mean that 29 GOLD COAST PHASE 6 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if 29 GOLD COAST PHASE 6 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 29 GOLD COAST PHASE 6?

The registered promoter entity is MANTRA 29 GOLD COST DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 29 GOLD COAST PHASE 6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 29 GOLD COAST PHASE 6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 29 GOLD COAST PHASE 6?

The professionals named in the filing: Architect: A design studio; Architect: Mitesh Siddhpura and Associates; Engineer: Design werkz; Engineer: Ravi Rawal; Chartered Accountant: SHRUTI AGARWAL; Chartered Accountant: R DEVENDRAKUMAR AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 29 GOLD COAST PHASE 6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 29 GOLD COAST PHASE 6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 29 GOLD COAST PHASE 6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.