Home / Browse projects / 29 GOLD COAST PHASE 4

Completed No litigation declared Residential / Group Housing project

29 GOLD COAST PHASE 4

By MANTRA 29 GOLD COST DEVELOPERS LLP

RG-MH-14697 · RERA P52100023097 · Last updated on MahaRERA portal: 3 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations.

See what the report covers Free either way: .
Nov 2023Possession promisedregistration recorded completed
55 of 55Construction stages doneacross 5 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

29 GOLD COAST PHASE 4 is a Residential / Group Housing project by MANTRA 29 GOLD COST DEVELOPERS LLP in DHANORI, 411015, registered with MahaRERA as P52100023097 on 29 Nov 2019. The registration is recorded completed; possession was promised by 28 Nov 2023.

At a glance

Project

  • Name29 GOLD COAST PHASE 4
  • TypeResidential / Group Housing
  • Location
    • 29
    • DHANORI
    • 411015
  • Pincode411015
  • RERA no.P52100023097
  • ReraGenie IDRG-MH-14697

Builder

  • NameMANTRA 29 GOLD COST DEVELOPERS LLP
  • Entity typePartnership
  • PartnersKISHOR POPATLAL GADA, NILESH POPATLAL GADA, MUKESH POPATLAL GADA, SHYAMKUMAR DWARKADAS MAHESHWARI, MANTRA PROPERTIES AND DEVELOPERS PRIVATE LIMITED THROUGH ITS PARTNER ROHIT GHANSHYAM GUPTA, MUKESH POPATLAL GADA, KISHOR POPATLAL GADA, NILESH POPATLAL GADA, SHYAMKUMAR DWARKADAS MAHESHWARI, MANTRA PROPERTIES AND DEVELOPERS PRIVATE LIMITED THROUGH ITS PARTNER ROHIT GHANSHYAM GUPTA, MUKESH POPATLAL GADA, KISHOR POPATLAL GADA and 18 more
  • Other registrations6 more →
  • Completed5 of 7
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2019PromisedNov 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Nov 2019
  • Promised completion28 Nov 2023
  • Revised completionNone
  • Buildings5 building records
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING B1NA70000
BUILDING B2NA70000
BUILDING B3NA70000
BUILDING B4NA70000
BUILDING B5NA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 3 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

55 of 55 construction stages are filed complete across 5 buildings.

BUILDING B1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B4100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B5100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed127

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots127
Closed/Covered114
Open Space13
BuildingClosed/CoveredOpen SpaceTotal
BUILDING B123326
BUILDING B223326
BUILDING B323326
BUILDING B423326
BUILDING B522123

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,739 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
MANGAL VINAL CO OP SOCPune (M Corp.)Pune
MANTRA BUILDCON LLP-Pune
GANESH VITTHAL TINGRE-Pune

Approvals and building plan

Permissible FSI8945.31
Proposed, not sanctioned8,945 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPB NO 7, KASARWADI NEAR DAI CHI CO PUNE 411034

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA design studio
EngineerDesign werkz
Chartered AccountantSHRUTI AGARWAL
PartnerRole in project
MANTRA 29 GOLD COST DEVELOPERS LLP-

Litigation declared3

CaseCourtStatus
1363/2016/2016CIVIL JUDGE SENIOR DIVISION PUNEHEARING ON APPLICATION
1364/2016/2016CIVIL JUDGE SENIOR DIVISION PUNEHEARING ON APPLICATION
839/2017/2017CIVIL JUDGE SENIOR DIVISION PUNEHEARING ON APPLICATION

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Apr 2023

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 29 GC Ph 4.pdf3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 29 GC_Phase 4_17-18.pdf20 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Mantra 29 Gold Cost Phase 3.pdf4 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 29 Gc_FORM 5_Phase 4.pdf29 Aug 2023
Details of encumbrancesFile: Talegaon_City 360_Phase 4_Finance encumbrances.pdf15 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B and C PART COMPLETION CERTIFICATE.pdf22 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: 29 Gold Coast Ph 4.pdf22 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 4.pdf13 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A_21-22.pdf12 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration Ph 4_.pdf20 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: 29 Gold Coast B1 to B5.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certi Phase 4.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certi Phase 4.pdf17 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Phase 4.pdf17 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 29 Gold Coast_Phase 4.pdf12 Dec 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold_Ph 4.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 29 Gold Coast Ph 4.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_Ph 4.pdf18 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert_ph 4.pdf18 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ph 4_Arc Cert.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ph 4_Eng Cert_compressed.pdf7 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARC CERT_PH4.pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_ENG CERT_PHASE 4_B1 TO B5.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_ENG CERT_PHASE 4.pdf7 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B1 TO B5_compressed.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: PH 4_compressed.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 29 gold 1920 phase 4.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 29 gold 2021 phase 4.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: phase 4.pdf5 Oct 2021
Declaration about Commencement CertificateFile: 29 GC.pdf4 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 4 Arct Cert.pdf13 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: phase 4 Engg Cert.pdf13 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 -_compressed.pdf13 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Phase 4 (2A Cert).pdf13 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Phase 4 (2A Cert).pdf13 Aug 2021
Disclosure of sold/ booked inventoryFile: Ph 4_compressed.pdf28 Jul 2021
Disclosure of sold/ booked inventoryFile: Mantra 29 Gold Cost PH 4_compressed.pdf18 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Phase 4.pdf27 Nov 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ph4.pdf27 Nov 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate for RERA 29 GOLD COST phase 4.pdf27 Nov 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate 29 Gold Coast Phase 4.pdf13 Nov 2019
PAN CardFile: PANCARD.pdf12 Nov 2019
Building plan approvalFile: B1 TO B3 1.pdf11 Nov 2019
Building plan approvalFile: B1 TO B3 2.pdf11 Nov 2019
Building plan approvalFile: B1 TO B3 SECTION.pdf11 Nov 2019
Building plan approvalFile: B4 B5 1.pdf11 Nov 2019
Building plan approvalFile: B4 B5 2.pdf11 Nov 2019
Building plan approvalFile: B4 B5 SECTION.pdf11 Nov 2019
Details of encumbrancesFile: Encumbrances details of Project.pdf11 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: B1 TO B3 1.pdf11 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: B1 TO B3 2.pdf11 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: B1 TO B3 SECTION.pdf11 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: B4 B5 1.pdf11 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: B4 B5 2.pdf11 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: B4 B5 SECTION.pdf11 Nov 2019
Declaration in FORM BFile: FORM B.pdf11 Nov 2019
Layout approvalFile: LAYOUT.pdf8 Nov 2019
Copy of the legal title reportFile: SEARCH REPORT-compressed.pdf8 Nov 2019
Copy of the legal title reportFile: SUPPLEMENTARY SEARCH REPORT.pdf8 Nov 2019
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf8 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 29 Gold Coast.pdf8 Nov 2019
Proforma of Allotment letterFile: Unit Agreement f.pdf8 Nov 2019

Keep 29 GOLD COAST PHASE 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHANORI

Builder: MANTRA 29 GOLD COST DEVELOPERS LLP

MANTRA 29 GOLD COST DEVELOPERS LLP has 7 registrations on MahaRERA, including 29 GOLD COAST PHASE 1 and 29 GOLD COAST PHASE 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if 29 GOLD COAST PHASE 4 is delayed beyond 28 Nov 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 29 GOLD COAST PHASE 4?

The registered promoter entity is MANTRA 29 GOLD COST DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 29 GOLD COAST PHASE 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 29 GOLD COAST PHASE 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 29 GOLD COAST PHASE 4?

The professionals named in the filing: Architect: A design studio; Engineer: Design werkz; Chartered Accountant: SHRUTI AGARWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 29 GOLD COAST PHASE 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 29 GOLD COAST PHASE 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 29 GOLD COAST PHASE 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.