Completed No litigation declared Residential / Group Housing project

29 GOLD COAST PHASE 3

By MANTRA 29 GOLD COST DEVELOPERS LLP

RG-MH-72719 · RERA P52100017100 · Last updated on MahaRERA portal: 3 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Dec 2023Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 43 documents Report an error

29 GOLD COAST PHASE 3 is a Residential / Group Housing project by MANTRA 29 GOLD COST DEVELOPERS LLP in DHANORI, 411015, registered with MahaRERA as P52100017100 on 13 Jul 2018. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • Name29 GOLD COAST PHASE 3
  • TypeResidential / Group Housing
  • Location
    • DHANORI
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100017100
  • ReraGenie IDRG-MH-72719

Builder

  • NameMANTRA 29 GOLD COST DEVELOPERS LLP
  • Entity typePartnership
  • PartnersKISHOR POPATLAL GADA, NILESH POPATLAL GADA, MUKESH POPATLAL GADA, SHYAMKUMAR DWARKADAS MAHESHWARI, MANTRA PROPERTIES AND DEVELOPERS PRIVATE LIMITED THROUGH ITS PARTNER ROHIT GHANSHYAM GUPTA, MUKESH POPATLAL GADA, KISHOR POPATLAL GADA, NILESH POPATLAL GADA, SHYAMKUMAR DWARKADAS MAHESHWARI, MANTRA PROPERTIES AND DEVELOPERS PRIVATE LIMITED THROUGH ITS PARTNER ROHIT GHANSHYAM GUPTA, MUKESH POPATLAL GADA, KISHOR POPATLAL GADA and 18 more
  • Other registrations6 more →
  • Completed5 of 7
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2018PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Jul 2018
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings3 building records
  • Documents filed43 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING A8NA80000
BUILDING A9NA80000
BUILDING A10NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 3 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

BUILDING A8100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING A9100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING A10100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
BUILDING A811
BUILDING A911
BUILDING A1011

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,960 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
MANGAL MILAN CO OP SOCIETYPune (M Corp.)Pune
MANTRA BUILDCON LLP-Pune
GANESH VITTHAL TINGRE-Pune

Approvals and building plan

Permissible FSI6147.42
Proposed, not sanctioned6,147 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKasarwadi, Pb no 1, Pune-411034SB ROAD

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSIDDHARTH HARISH CHANDRAKAR
PartnerRole in project
MANTRA 29 GOLD COST DEVELOPERS LLP-

Litigation declared3

CaseCourtStatus
1363/2016/2016CIVIL JUDGE SENIOR DIVISION PUNEHEARING ON APPLICATION
1364/2016/2016CIVIL JUDGE SENIOR DIVISION PUNEHEARING ON APPLICATION
839/2017/2017CIVIL JUDGE SENIOR DIVISION PUNEHEARING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jul 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Sep 2022

Documents filed43

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 29 GC Ph 3.pdf3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 29 GC_Phase 3_17-18.pdf20 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 29 Gc_FORM 5_Phase 3.pdf2 Sep 2023
Details of encumbrancesFile: Mantra 29 GC_Phase 3_Finance Encumbrances.pdf15 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration Ph 3_.pdf20 Mar 2023
Status of ConveyanceFile: Conveyance Deed Phase 3.pdf15 Mar 2023
Architect’s Certificate on Completion of Project (Form 4)File: 29 Gold Coast Ph 3.pdf6 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: 29 Gold Coast A8 to A10.pdf22 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 29 Gold Coast_Phase 3.pdf6 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 29 Gold Coast Ph 3.pdf20 Oct 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion A8-A10.pdf28 Sep 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form4_Phase 3_A8,A9,A10.pdf30 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Ceti_A8,A9,A10_RERA_29 Gold Cost.pdf29 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARC CERT_PH3.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_ENG CERT_PHASE 3.pdf7 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A8 to A10_compressed.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: PH 3_compressed.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 29 gold 1920 phase 3.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 29 gold 2021 phase 3.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Phase 3 (2A Cert).pdf5 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: phase 3.pdf5 Oct 2021
Declaration about Commencement CertificateFile: 29 GC.pdf4 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 -_compressed.pdf13 Aug 2021
Disclosure of sold/ booked inventoryFile: Ph 3_compressed.pdf28 Jul 2021
Disclosure of sold/ booked inventoryFile: Mantra 29 Gold Cost PH 3.pdf18 Jun 2021
Disclosure of sold/ booked inventoryFile: Mantra 29 Gold Cost PH 3.pdf18 Jun 2021
PAN CardFile: PANCARD.pdf27 Nov 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Phase 3.pdf27 Nov 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ph-3.pdf27 Nov 2020
Certificates of CA (Form 3)File: CA Certificate for RERA 29 GOLD COST phase 3_compressed (1).pdf27 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Mantra 29 Gold Cost Phase 3.pdf20 Dec 2019
Details of encumbrancesFile: Details of Encumbrances - Dhanori.pdf10 Jul 2018
Declaration in FORM BFile: FORM B PROMOTERS.pdf10 Jul 2018
Layout approvalFile: LAYOUT.pdf9 Jul 2018
Building plan approvalFile: CC PLANS 9_13-ilovepdf-compressed.pdf9 Jul 2018
Building plan approvalFile: CC PLANS 10_13-ilovepdf-compressed.pdf9 Jul 2018
Copy of the legal title reportFile: Search Report 29-1-12 dtd 25-5-18.pdf9 Jul 2018
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf9 Jul 2018
Building Plan Approval (IOD)File: CC PLANS 9_13-ilovepdf-compressed.pdf9 Jul 2018
Building Plan Approval (IOD)File: CC PLANS 10_13-ilovepdf-compressed.pdf9 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Dhanori-ilovepdf-compressed.pdf9 Jul 2018
Certificates of CA (Form 3)File: 29 phase 3.pdf9 Jul 2018
Proforma of Allotment letterFile: Unit Agreement f.pdf9 Jul 2018

Keep 29 GOLD COAST PHASE 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHANORI

Builder: MANTRA 29 GOLD COST DEVELOPERS LLP

MANTRA 29 GOLD COST DEVELOPERS LLP has 7 registrations on MahaRERA, including 29 GOLD COAST PHASE 1 and 29 GOLD COAST PHASE 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if 29 GOLD COAST PHASE 3 is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 29 GOLD COAST PHASE 3?

The registered promoter entity is MANTRA 29 GOLD COST DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 29 GOLD COAST PHASE 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 29 GOLD COAST PHASE 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 29 GOLD COAST PHASE 3?

The professionals named in the filing: Architect: SIDDHARTH HARISH CHANDRAKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 29 GOLD COAST PHASE 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 29 GOLD COAST PHASE 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 29 GOLD COAST PHASE 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.