Home / Browse projects / 29 GOLD COAST PHASE 2
29 GOLD COAST PHASE 2
By MANTRA 29 GOLD COST DEVELOPERS LLP
RG-MH-71130 · RERA P52100016777 · Last updated on MahaRERA portal: 3 Dec 2024
Source: official MahaRERA filing
Red flags
- 2 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
29 GOLD COAST PHASE 2 is a Others project by MANTRA 29 GOLD COST DEVELOPERS LLP in DHANORI, 411015, registered with MahaRERA as P52100016777 on 12 Jun 2018. The registration is recorded completed; possession was promised by 30 Jun 2023. 2 complaints are on record with the regulator.
At a glance
Project
- Name29 GOLD COAST PHASE 2
- TypeOthers
- Location
- DHANORI
- 411015
- Pincode411015
- RERA no.P52100016777
- ReraGenie IDRG-MH-71130
Builder
- NameMANTRA 29 GOLD COST DEVELOPERS LLP
- Entity typePartnership
- PartnersKISHOR POPATLAL GADA, NILESH POPATLAL GADA, MUKESH POPATLAL GADA, SHYAMKUMAR DWARKADAS MAHESHWARI, MANTRA PROPERTIES AND DEVELOPERS PRIVATE LIMITED THROUGH ITS PARTNER ROHIT GHANSHYAM GUPTA, MUKESH POPATLAL GADA, KISHOR POPATLAL GADA, NILESH POPATLAL GADA, SHYAMKUMAR DWARKADAS MAHESHWARI, MANTRA PROPERTIES AND DEVELOPERS PRIVATE LIMITED THROUGH ITS PARTNER ROHIT GHANSHYAM GUPTA, MUKESH POPATLAL GADA, KISHOR POPATLAL GADA and 18 more
- Other registrations6 more →
- Completed5 of 7
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on12 Jun 2018
- Promised completion30 Jun 2023
- Revised completionNone
- Buildings4 building records
- Documents filed47 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A1 | NA | 8 | 0 | 0 | 0 | 0 |
| BUILDING A2 | NA | 8 | 0 | 0 | 0 | 0 |
| BUILDING A3 | NA | 8 | 0 | 0 | 0 | 0 |
| BUILDING A4 | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 3 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
44 of 44 construction stages are filed complete across 4 buildings.
BUILDING A1100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING A2100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING A3100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING A4100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 3 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed4
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING A1 | 1 | 1 |
| BUILDING A2 | 1 | 1 |
| BUILDING A3 | 1 | 1 |
| BUILDING A4 | 1 | 1 |
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MANGAL MILAN CO OP SOCIETY | Pune (M Corp.) | Pune |
| MANTRA BUILDCON LLP | - | Pune |
| GANESH VITTHALTINGARE | - | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SIDDHARTH HARISHCHANDRAKAR |
| Partner | Role in project |
|---|---|
| MANTRA 29 GOLD COST DEVELOPERS LLP | - |
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 1363/2016 | CIVIL JUDGE SENIOR DIVISION PUNE | HEARING ON APPLICATION |
| 1364/2016/2016 | CIVIL JUDGE SENIOR DIVISION PUNE | HEARING ON APPLICATION |
| 839/2017/2017 | CIVIL JUDGE SENIOR DIVISION PUNE | HEARING ON APPLICATION |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000177823 | MANTRA 29 GOLD COAST DEVELOPERS LLP | JYOTI SHIVRAM SHETTY | 14/01/2023 |
| CC005000000177825 | MANTRA 29 GOLD COAST DEVELOPERS LLP | JYOTI SHIVRAM SHETTY | 14/01/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 May 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 May 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Aug 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 May 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 30 Nov 2021
Documents filed47
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 29 GC Ph 2.pdf | 3 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 29 GC_Phase 2_22-23.pdf | 25 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 29 GC_Phase 2_17-18.pdf | 20 Sep 2023 |
| Details of encumbrancesFile: Mantra 29 GC_Phase 2_Finance Encumbrances.pdf | 15 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration Ph 2_.pdf | 20 Mar 2023 |
| Status of ConveyanceFile: Conveyance Deed Phase 2.pdf | 15 Mar 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: 29 Gold Coast A1 to A4.pdf | 22 Feb 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: 29 Gold Coast Ph 2.pdf | 30 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 29 Gold Coast_Phase 2.pdf | 6 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 29 Gold Coast Ph 2.pdf | 20 Oct 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: 29 Gold coast_Form 4_Phase 2.pdf | 11 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_ENG CERT_PHASE 2.pdf | 7 Apr 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DHANORI 29 A1 -A7 PART COMPLETION CERTIFICATE.pdf | 30 Nov 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A1 TO A4_compressed.pdf | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Mantra erectors phase 2 certificate 1920.pdf | 6 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 29 gold 1920 phase 2.pdf | 6 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Mantra erectors phase 2 certificate 2021.pdf | 6 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 29 gold 2021 phase 2.pdf | 6 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: phase 1.pdf | 5 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Phase 2 (2A Cert)_compressed.pdf | 5 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: phase 2.pdf | 5 Oct 2021 |
| Declaration about Commencement CertificateFile: 29 GC.pdf | 4 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_compressed.pdf | 13 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Ph 2_compressed.pdf | 28 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Mantra 29 Gold Cost PH 2_compressed.pdf | 18 Jun 2021 |
| PAN CardFile: PANCARD.pdf | 27 Nov 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Phase 2.pdf | 27 Nov 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ph2.pdf | 27 Nov 2020 |
| Certificates of CA (Form 3)File: CA Certificate for RERA 29 GOLD COST phase 2_compressed.pdf | 27 Nov 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Mantra 29 Gold Cost Phase 2.pdf | 20 Dec 2019 |
| Building plan approvalFile: CC PLANS 1.pdf | 16 Aug 2018 |
| Building plan approvalFile: CC PLANS 2.pdf | 16 Aug 2018 |
| Building plan approvalFile: CC PLANS 3.pdf | 16 Aug 2018 |
| Building Plan Approval (IOD)File: CC PLANS 1.pdf | 16 Aug 2018 |
| Building Plan Approval (IOD)File: CC PLANS 2.pdf | 16 Aug 2018 |
| Building Plan Approval (IOD)File: CC PLANS 3.pdf | 16 Aug 2018 |
| Declaration in FORM BFile: PROMOTER FORM B-.pdf | 7 Jun 2018 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 6 Jun 2018 |
| Building plan approvalFile: BUILDING PLAN.pdf | 25 May 2018 |
| Layout approvalFile: LAYOUT.pdf | 25 May 2018 |
| Copy of the legal title reportFile: Search Report 29-1-12 dtd 25-5-18.pdf | 25 May 2018 |
| Copy of the legal title reportFile: Search Report 29-1-13-1-1 dtd 25-5-18.pdf | 25 May 2018 |
| Details of encumbrancesFile: Encumberance Details 29 Gold cost.pdf | 25 May 2018 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 25 May 2018 |
| Building Plan Approval (IOD)File: BUILDING PLAN.pdf | 25 May 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 25 May 2018 |
| Proforma of Allotment letterFile: Unit Agreement f.pdf | 25 May 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations, which the RERA portal never shows together
- All 47 filed documents as one ZIP, foldered, with a manifest
Keep 29 GOLD COAST PHASE 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHANORI
Kohinoor Viva Pixel- Phase II
RISING ASSOCIATES
VIVACITY
REALCON LANDMARKS LLP
TRIAA VASANTAM CITY CENTER PHASE 1
Triaa Realtors LLP
QUE 101 PHASE I
ANNR Unique Realty LLP
NYATI ERA I
NYATI CONSTRUCTION PRIVATE LIMITED
ONE ARETHA PHASE 1
Triaa Landmarks LLP
Builder: MANTRA 29 GOLD COST DEVELOPERS LLP
MANTRA 29 GOLD COST DEVELOPERS LLP has 7 registrations on MahaRERA, including 29 GOLD COAST PHASE 1 and 29 GOLD COAST PHASE 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if 29 GOLD COAST PHASE 2 is delayed beyond 30 Jun 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 29 GOLD COAST PHASE 2?
The registered promoter entity is MANTRA 29 GOLD COST DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 29 GOLD COAST PHASE 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against 29 GOLD COAST PHASE 2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for 29 GOLD COAST PHASE 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 29 GOLD COAST PHASE 2?
The professionals named in the filing: Architect: SIDDHARTH HARISHCHANDRAKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 29 GOLD COAST PHASE 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.