Home / Browse projects / Mumbai City, Maharashtra / 1891 Ekam Parkk
1891 Ekam Parkk
RG-MH-78692 · RERA P51900046004 · Last updated on MahaRERA portal: 11 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 11.00 crore secured on the land, in favour of Truhome Finance Ltd
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
1891 Ekam Parkk is a Others project by Nascent Developers in Mumbai City, Maharashtra, registered with MahaRERA as P51900046004 on 15 Jun 2022. Possession is promised by 30 Dec 2026. 18 of the 40 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- Name1891 Ekam Parkk
- TypeOthers
- Location
- Lady Jamshedji Road
- Shivaji Park Dadar West
- GNorth-400028
- Ward GNorth
- Mumbai City
- 400028
- Pincode400028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900046004
- ReraGenie IDRG-MH-78692
Builder
- NameNascent Developers
- Entity typePartnership
- PartnersAmeeth Pravinkumar Jaiin, Hemant Pravinkumar Jaiin
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Jun 2022
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed78 files
Current status
Figures as on 11 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1891 Ekam Parkk | NA | 25 | 24 | 40 | 0 | 40 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
1891 Ekam Parkk: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| 1891 Ekam Parkk | NA | Rs 23.52 cr | Rs 23.52 cr |
| - | NA | Rs 48.00 lakh | Rs 48.00 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Pagnis & Pagnis |
| Engineer | S K Consultants & Engineers |
| Chartered Accountant | N B Sayed & Associates |
| Chartered Accountant | Pranav Bhaskaran & Associates |
| Chartered Accountant | Gaurav |
| Chartered Accountant | Pratiksha Tulshyan & Associates |
| Partner | Role in project |
|---|---|
| Nascent Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 May 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: RERA FORM 1 FOR EKAM PARKK TILL DEC 2025.pdf | 11 Jun 2026 |
| Withdrawal Update Form 1File: RERA FORM 1 FOR EKAM PARKK TILL DEC 2025.pdf | 11 Jun 2026 |
| Withdrawal Update Form 1File: RERA FORM 1 FOR EKAM PARKK TILL DEC 2025.pdf | 11 Jun 2026 |
| Withdrawal Update Form 1File: Ekam Rera Form 1.pdf | 11 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 -1891 Ekam Parkk as on June 2024.pdf | 11 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 - 1891 Ekam Parkk as on Sept 2025.pdf | 11 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 - 1891 Ekam Parkk as on Dec 2025.pdf | 11 Jun 2026 |
| Withdrawal Update Form 2File: Form 2-1891 Ekam Parkk as on 31-03-2026.pdf | 11 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 -1891 Ekam Parkk as on 30th June 2025.pdf | 11 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 -1891 Ekam Parkk as on 30th September 2025.pdf | 11 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 -1891 Ekam Parkk as on 31-12-2025.pdf | 11 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 -1891 Ekam Parkk as on 31-03-2026.pdf | 11 Jun 2026 |
| Form 5 (FY 2024-2025)File: Final Form 5 - 1891 Ekam Park FY 2024-25.pdf | 30 Dec 2025 |
| Details of encumbrancesFile: Encumbrance - 1891 Ekam Parkk.pdf | 23 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -1891 Ekam Parkk as on Dec 2024.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 1891 Ekam Parkk as on Dec 2024.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -1891 Ekam Parkk as on Sep 2024.pdf | 17 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 1891 Ekam Parkk as on Sep 2024.pdf | 17 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 1891 Ekam Parkk FY 2023-24.pdf | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -1891 Ekam Parkk as on June 2024.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -1891 Ekam Parkk as on June 2024.pdf | 12 Jul 2024 |
| Declaration about Commencement CertificateFile: Format D.pdf | 15 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate .pdf | 15 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 15 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf | 15 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24_removed.pdf | 15 May 2024 |
| Disclosure of sold/ booked inventoryFile: Circular 29.pdf | 15 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon (1).pdf | 15 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 15 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 1891 Ekam Parkk as on March 2024.pdf | 13 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 1891 Ekam Parkk as on March 2024.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -1891 Ekam Parkk as on March 2024.pdf | 15 Apr 2024 |
| Details of encumbrancesFile: 1891 Ekam Parkk - Encumbrance (Finance).pdf | 10 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Circular 29 - 1891 Ekam Parkk as on Dec 2023.pdf | 15 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 1891 Ekam Parkk as on Sep 2022 (1).pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 1891 Ekam Parkk as on Dec 2022 (1).pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 1891 Ekam Parkk as on March 2023 (1).pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 1891 Ekam Parkk as on June 2023 (1).pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 1891 Ekam Parkk as on Sep 2023 (1).pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 1891 Ekam Parkk as on Dec 2023 (1).pdf | 13 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 2370290_FurtherCC_signed.pdf | 7 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 1891 Ekam Parkk as on Dec 2023.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -1891 Ekam Parkk as on 31st December 2023.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -1891 Ekam Parkk as on 30th September 2023.pdf | 23 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -1891 Ekam Parkk as on 30th September 2023.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- 1891 Ekam Parkk as on June 2023.pdf | 11 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- 1891 Ekam Parkk as on 2022-23.pdf | 26 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -1891 Ekam Parkk as on 30-06-2023.pdf | 8 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- 1891 Ekam Parkk as on March 2023.pdf | 23 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- 1891 Ekam Parkk as on March 2023.pdf | 23 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- 1891 Ekam Parkk as on December 2022.pdf | 4 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- 1891 Ekam Parkk as on December 2022.pdf | 4 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- 1891 Ekam Parkk as on September 2022.pdf | 25 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ekam Parkk as on September 2022_compressed.pdf | 25 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 RERA PRABHU DARSHAN.pdf | 22 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 1891 Ekam Parkk- June 2022-Sign.pdf | 22 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 1891 Ekam Parkk June 2022_compressed.pdf | 22 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Form A Ekam Parkk.pdf | 2 Aug 2022 |
| Copy of the legal title reportFile: title certificate Ekam Parkk_compressed.pdf | 31 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New format- Form 3 - 1891 Ekam Parkk Final.pdf | 31 May 2022 |
| Declaration about Commencement CertificateFile: Declaration on CC - Ekam Parkk.pdf | 26 May 2022 |
| Proforma of Allotment letterFile: Ekam Agreemetn for Sale.pdf | 26 May 2022 |
| Proforma of Allotment letterFile: Ekam Allotment Letter - Final.pdf | 26 May 2022 |
| Layout approvalFile: PLAN Ekam Parkk_11zon_1-1.pdf | 20 May 2022 |
| Building plan approvalFile: PLAN Ekam Parkk_11zon_2-3_11zon.pdf | 20 May 2022 |
| Building plan approvalFile: PLAN Ekam Parkk_11zon_4-5_11zon (1).pdf | 20 May 2022 |
| Building plan approvalFile: PLAN Ekam Parkk_11zon_6-7_11zon.pdf | 20 May 2022 |
| Building plan approvalFile: PLAN Ekam Parkk_11zon_8-9_11zon.pdf | 20 May 2022 |
| PAN CardFile: Pan Card Nascent Developers464 (1).pdf | 20 May 2022 |
| Details of encumbrancesFile: 1891 EKAM PARKK - Encumbrance.pdf | 20 May 2022 |
| Copy of Layout Approval (in case of layout)File: PLAN Ekam Parkk_11zon_1-1.pdf | 20 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN Ekam Parkk_11zon_2-3_11zon.pdf | 20 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN Ekam Parkk_11zon_4-5_11zon (1).pdf | 20 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN Ekam Parkk_11zon_6-7_11zon.pdf | 20 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN Ekam Parkk_11zon_8-9_11zon.pdf | 20 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: First CC.pdf | 20 May 2022 |
| Declaration in FORM BFile: 1891 EKAM PARKK - NOTARIZED AFFIDAVIT CUM DECLARATION.pdf | 20 May 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200235912781_For_Asset_Based_Search_26_04_2022_14_19_32_878.pdf | 20 May 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep 1891 Ekam Parkk on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Shivaji Park Dadar West780+ in Mumbai City
Filed coordinates, straight-line distance. 245 registered projects within 2 km.
Kohinoor Square Phase 1
Kohinoor CTNL Infrastructure Company Priva
Sigma Garnet
COLO COLOR PRIVATE LIMITED
PALETTE
SURAJ ESTATE DEVELOPERS LTD
Eon One
Firstlight Properties Private Limited
Ratan Address
Shri Nakoda Enterprises
Promesa West End
M/s. virtue Enterprises
See every Mumbai City project, with the district possession charts
Builder: Nascent Developers
Nascent Developers has 1 registration on MahaRERA, including 1891 Ekam Parkk. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What are my rights if 1891 Ekam Parkk is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 1891 Ekam Parkk?
The registered promoter entity is Nascent Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 1891 Ekam Parkk?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for 1891 Ekam Parkk?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 1891 Ekam Parkk?
The professionals named in the filing: Architect: Pagnis & Pagnis; Engineer: S K Consultants & Engineers; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: Pranav Bhaskaran & Associates; Chartered Accountant: Gaurav; Chartered Accountant: Pratiksha Tulshyan & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 1891 Ekam Parkk?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback