Home / Browse projects / Mumbai City, Maharashtra / 1515 Moneco
1515 Moneco
By LLOYDS REALTY DEVELOPERS LIMITED
RG-MH-30329 · RERA P51900031131 · Last updated on MahaRERA portal: 28 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
1515 Moneco is a Residential / Group Housing project by LLOYDS REALTY DEVELOPERS LIMITED in Mumbai City, Maharashtra, registered with MahaRERA as P51900031131 on 5 Oct 2021. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 29 of the 29 units on this registration are recorded sold or booked. 1 complaint is on record with the regulator.
At a glance
Project
- Name1515 Moneco
- TypeResidential / Group Housing
- Location
- Mahim Agar Street
- Prabhadevi
- Mumbai City
- 400025
- Pincode400025
- RERA no.P51900031131
- ReraGenie IDRG-MH-30329
Builder
- NameLLOYDS REALTY DEVELOPERS LIMITED
- Entity typeCompany
- Managing DirectorRAVI AGARWAL
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Oct 2021
- Promised completion30 Sep 2026
- Revised completionNone
- Buildings1 building record
- Documents filed105 files
Current status
Figures as on 28 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1515 Moneco | NA | 19 | 16 | 20 | 9 | 29 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1515 Moneco:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed49
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Chartered Accountant | R D NAGVEKAR AND CO |
| Chartered Accountant | V K Beswal & Associates |
| Partner | Role in project |
|---|---|
| LLOYDS REALTY DEVELOPERS LIMITED | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12503928 | Smita Shyam Chavan | LLOYDS REALTY DEVELOPERS LIMITED | 08/11/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Aug 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Feb 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Jan 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Feb 2025
Documents filed105
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf | 28 Apr 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf | 28 Apr 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf | 28 Apr 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: CA Cetificate- FORM 3.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: CA Cetificate- FORM 3.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: CA Cetificate- FORM 3.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: CA Cetificate- FORM 3.pdf | 28 Apr 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate of Percentage of Completion of Work.pdf | 14 Apr 2025 |
| Layout approvalFile: Layout.pdf | 17 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 17 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf | 17 Feb 2025 |
| Building plan approvalFile: Building Plan Approval.pdf | 16 Jan 2025 |
| Building plan approvalFile: Plan Approval Letter.pdf | 16 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Approval Letter.pdf | 16 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval.pdf | 16 Jan 2025 |
| Building plan approvalFile: Amendment Plan - 180624 (1)_11zon (1).pdf | 18 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: Amendment Plan - 180624 (1)_11zon (1).pdf | 18 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amendment Plan - 180624 (1)_11zon (1).pdf | 18 Dec 2024 |
| Details of encumbrances concerned to LegalFile: Amendment Plan - 180624 (1)_11zon (1).pdf | 18 Dec 2024 |
| Building plan approvalFile: Amendment Letter - 180624.pdf | 11 Dec 2024 |
| Building plan approvalFile: Amendment Plan - 180624_compressed.pdf | 11 Dec 2024 |
| Building plan approvalFile: Amended issue letter.pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM A.pdf | 11 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf | 11 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (6)_compressed.pdf | 11 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 11 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (3).pdf | 11 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended issue letter.pdf | 11 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amendment Plan - 180624_compressed.pdf | 11 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amendment Letter - 180624.pdf | 11 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A (1).pdf | 11 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 11 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 1726564688107.pdf | 11 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 1515 MONECO SOLD INVENTORY REPORT.pdf | 1 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 30 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 30 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 30 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cetificate- FORM 3.pdf | 30 May 2024 |
| Proforma of Allotment letterFile: Lloyds Realty Developers Ltd Allotment letter Draft as per latest RERA Format 21112023 (1) | 1 Dec 2023 |
| Proforma of Agreement for saleFile: Lloyds Realty developers Agreement for Sale under RERA November 27, 2023 Final .pdf | 1 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Form 1.pdf | 17 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate- Form 2.pdf | 17 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer's Certificate on Quality Assurance_Form 2A.pdf | 17 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Form 3.pdf | 17 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certifcate of Percentage of Completion of Work (Form 1).pdf | 7 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate on Cost Incurred on Project (Form 2).pdf | 7 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf | 7 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost and Fund withdrawal (Form 3).pdf | 7 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5_CA Certificate_FY 2022-23.pdf | 7 Jul 2023 |
| Proforma of Agreement for saleFile: Proforma of Agreement for Sale.pdf | 7 Jul 2023 |
| Proforma of Agreement for saleFile: aristo developers Agreement for Sale under RERA February 10, 2022.pdf | 19 Apr 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER AS PER ORDER.pdf | 22 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - FORM 1.pdf | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf | 16 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM 3_11zon.pdf | 16 Feb 2023 |
| Proforma of Agreement for saleFile: aristo developers Agreement for Sale under RERA February 10, 2022.pdf | 15 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 compressed.pdf | 25 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 25 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 25 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A- 2021-2022- Quality Assurance.pdf | 24 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-2021 to 2022.pdf | 24 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ARDLFORM3 CA Certificate dated 051122compressedS.pdf | 16 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- (1-4)_compressed.pdf | 13 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 (5-9)_compressed.pdf | 13 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5.pdf | 13 Jul 2022 |
| CERSAI detailsFile: CERSAI REPORT.pdf | 1 Mar 2022 |
| Declaration about Commencement CertificateFile: FORM D - CC DECLARATION.pdf | 17 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_19-01-2022.pdf | 16 Feb 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf | 16 Feb 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 16 Feb 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate for Quality assurance.pdf | 16 Feb 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate COMP.pdf | 16 Feb 2022 |
| Proforma of Allotment letterFile: Allotment Letter Format as per RERA on Letterhead February 10, 2022.pdf | 16 Feb 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 105 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep 1515 Moneco on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Prabhadevi780+ in Mumbai City
RUSTOMJEE CROWN -PHASE II
REAL GEM BUILDTECH PRIVATE LIMITED
Lodha Worli Residential Project
Lodha Developers Limited
Twenty Five South - North Tower
Twenty Five South Realty Limited
ARTESIA - RESIDENTIAL WING CONSTRUCTED ON PART
K RAHEJA PRIVATE LIMITED
Lotus Aquaria
SRI LOTUS DEVELOPERS AND REALTY LTD.
The V Mansion
ROOF ABOVE REALTORS LLP
See every Mumbai City project, with the district possession charts
Builder: LLOYDS REALTY DEVELOPERS LIMITED
LLOYDS REALTY DEVELOPERS LIMITED has 1 registration on MahaRERA, including 1515 Moneco. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What are my rights if 1515 Moneco is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 1515 Moneco?
The registered promoter entity is LLOYDS REALTY DEVELOPERS LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 1515 Moneco?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against 1515 Moneco?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for 1515 Moneco?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 1515 Moneco?
The professionals named in the filing: Chartered Accountant: R D NAGVEKAR AND CO; Chartered Accountant: V K Beswal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 1515 Moneco?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback