Home / Browse projects / Mumbai City, Maharashtra / Twenty Five South - North Tower

Registered No litigation declared Residential / Group Housing project

Twenty Five South - North Tower

By Twenty Five South Realty Limited

RG-MH-71442 · RERA P51900030600 · Last updated on MahaRERA portal: 4 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 99%
5 of 169Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Twenty Five South - North Tower is a Residential / Group Housing project by Twenty Five South Realty Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900030600 on 1 Sep 2021. Possession is promised by 31 Dec 2030. 164 of the 169 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameTwenty Five South - North Tower
  • TypeResidential / Group Housing
  • Location
    • Yadav Patel Lane
    • Prabhadevi
    • Ward GNorth
    • Mumbai City
    • 400025
  • Pincode400025
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900030600
  • ReraGenie IDRG-MH-71442

Builder

  • NameTwenty Five South Realty Limited
  • Entity typeCompany
  • DirectorsSunil Chandrakant Shah, Praphul Devram Shinde, Vandana Paresh Dhanki, Sachin Anant Sawant
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2021PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2021
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed91 files

Current status

97%164 of 169 units booked
76.5%Work done, per cost certificate

Figures as on 4 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Twenty Five South - North TowerNA64641690169

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 99%.

Twenty Five South - North Tower: 97% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 4 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes96%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes99%
Storm Water DrainsYes99%
Landscaping & Tree PlantingYes90%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes98%
Solid Waste Management And DisposalYes98%
Water conservation /Rain water harvestingYes98%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes98%
Electrical meter room, sub-station, receiving stationYes98%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed529

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots529
Closed/Covered529

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,301 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Nov 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI47915.59
Proposed, not sanctioned1,578 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJAHANGIR BUILDING M G ROAD FORT MUMBAI 400001
Estimated costRs 716.69 cr
Cost incurredRs 548.47 cr
Work done76.53%
BuildingWingEstimatedIncurred
Twenty Five South - North TowerNARs 712.54 crRs 548.47 cr
-NARs 4.15 cr-

Certifying professionals and partners10

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpacage Conultant
ArchitectSUSAN JOHN
ArchitectHafiz Contractor (Mr. Karl Wadia)
EngineerOMKAR S AKHADE
EngineerMahimtura Consulatant Pvt. Ltd (H.R. Mahimtura)
EngineerKishor patil
EngineerCapacite Infraproject Ltd
Chartered AccountantSanket R Shah and Associates
Chartered AccountantM H Dalal & Associates
Chartered AccountantARCK and company
PartnerRole in project
Twenty Five South Realty Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-I P51900030600 -25 south( North Tower) Wing B.pdf4 May 2026
Withdrawal Update Form 2File: FORM-II-North tower.pdf4 May 2026
Withdrawal Update Form 3File: FORM-III - North tower.pdf4 May 2026
Withdrawal Update Form 1File: FORM_1_P51900030600 -25 south( North Tower).pdf26 Feb 2026
Withdrawal Update Form 2File: FORM_2_P51900030600 -25 South-North Tower.pdf26 Feb 2026
Withdrawal Update Form 3File: FORM_3_P51900030600 -25 South-North Tower.pdf26 Feb 2026
Withdrawal Update Form 1File: P51900030600 -25 south( North Tower) (1).pdf17 Nov 2025
Withdrawal Update Form 2File: Engineering Cert Tower B Signed.pdf17 Nov 2025
Withdrawal Update Form 3File: From III Tower B Signed.pdf17 Nov 2025
Withdrawal Update Form 1File: P51900030600 -25 south( North Tower) (1).pdf13 Nov 2025
Withdrawal Update Form 2File: Engineering Cert Tower B Signed.pdf13 Nov 2025
Withdrawal Update Form 3File: From III Tower B Signed.pdf13 Nov 2025
Form 5 (FY 2024-2025)File: TFSRL_Form-5_North Tower_Mar-25 (1).pdf1 Oct 2025
Form 1File: Arch Certificate_North Tower_June 25.pdf30 Aug 2025
Form 2File: Engg Certificate_North Tower_June 25.pdf30 Aug 2025
Form 3File: Form III_North Tower_June 25.pdf30 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold inventory details_June 25.pdf30 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51900030600 -25 south (North Tower)-WING-B.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate_North tower_Dec 24.pdf1 Feb 2025
Building plan approvalFile: 25-9-2024 Amendletter_signed (1).pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 25-9-2024 Amendletter_signed (1).pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 25 South_Form III_North Tower_Dec-24_Signed__compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 25 South_Form II_Central Tower_Dec-24_Signed_.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 25 South_Form II_North Tower_Dec-24_Signed_.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51900030600 -25 south( North Tower).pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM III- NORTH TOWER_Sept 24_compressed.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NORTH TOWER.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_North Tower_FY 23-24.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 25 South_Mar'24 Form 5 Tower B.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II-North Tower_Mar 24.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-II-North Tower June 24.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51900030600 - 25 North B wing (1).pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51900030600 -25 south( North Tower).pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51900030600 - 25 South B wing (2).pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate North Tower.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Certificate_North Tower-30062024.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TFSRL_Form III_North Tower_Jun-24.pdf16 Jul 2024
Building plan approvalFile: Amended Letter (2).pdf11 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Letter (2).pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51900030600 - 25 South B wing (1).pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_25 South North Tower_Dec 23.pdf17 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QA Certificate-25 south-North Tower.pdf4 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Endosment (1).pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 25 South_North Tower Form 5.pdf7 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51900030600 - 25 South B wing.pdf31 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51900030600 - 25 South B wing.pdf8 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_NORTH TOWER-27-07-23.pdf8 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM III - TWENTY FIVR SOUTH NORTH TOWER.pdf8 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51900030600 - 25 South B wing.pdf20 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III North Tower Dec-2022_compressed.pdf20 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA From III upto Mar-2023 North tower (1)_compressed.pdf20 Jun 2023
Details of encumbrancesFile: Encumbrance certificate 05062023.pdf9 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51900030600 - 25 South Wing- B.pdf30 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51900030600 - 25south - TB (North tower).pdf30 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate North tower - Sep 22.pdf30 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - North Tower - Dec22.pdf30 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: 2361541_FurtherCC_signed.pdf21 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 - Twenty Five South - North Tower.pdf6 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate_25 South North Tower_June 22.pdf1 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate_25 South North Tower_June 22_compressed.pdf1 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CA Form III North Tower_June 22_compressed.pdf1 Aug 2022
Details of encumbrancesFile: 25 South Encumbrance Certificate 20052022.pdf20 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - North Tower_compressed.pdf19 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III (New) (Mar 22) - North Tower_compressed-compressed.pdf18 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf10 Mar 2022
Layout approvalFile: North Tower Lower Typical Floors new approval 31122021.pdf20 Jan 2022
Layout approvalFile: North Tower Upper Typical Floors new approval 31122021.pdf20 Jan 2022
Copy of Layout Approval (in case of layout)File: North Tower Lower Typical Floors new approval 31122021.pdf20 Jan 2022
Copy of Layout Approval (in case of layout)File: North Tower Upper Typical Floors new approval 31122021.pdf20 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: North Tower Form III.pdf8 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II ENGINEER CERTIFICATE sept 21.pdf14 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 2021.pdf8 Oct 2021
Copy of the legal title reportFile: ilovepdf_merged_compressed.pdf25 Aug 2021
Declaration about Commencement CertificateFile: CC Declaration as pre RERA format for North Tower.pdf19 Aug 2021
Building plan approvalFile: Building approval.pdf11 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: Building approval.pdf11 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: North Tower RERA Certificate_1.pdf11 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: North Tower RERA Certificate_2.pdf11 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: North Tower RERA Certificate_3.pdf11 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM III - NORTH TOWER.pdf11 Aug 2021

How this compares with Mumbai City

97%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Twenty Five South - North Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Prabhadevi780+ in Mumbai City

Builder: Twenty Five South Realty Limited

Twenty Five South Realty Limited has 4 registrations on MahaRERA, including 25 South Tower A upto 10th Floor and 25 South Tower A 11th to 47th Floor. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Twenty Five South - North Tower is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Twenty Five South - North Tower?

The registered promoter entity is Twenty Five South Realty Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Twenty Five South - North Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Twenty Five South - North Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Twenty Five South - North Tower?

The professionals named in the filing: Architect: Spacage Conultant; Architect: SUSAN JOHN; Architect: Hafiz Contractor (Mr. Karl Wadia); Engineer: OMKAR S AKHADE; Engineer: Mahimtura Consulatant Pvt. Ltd (H.R. Mahimtura); Engineer: Kishor patil. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Twenty Five South - North Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Twenty Five South - North Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Twenty Five South - North Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.