Home / Browse projects / Mumbai Suburban, Maharashtra / 111 HYDE PARK

Completed No litigation declared Residential / Group Housing project

111 HYDE PARK

By MDM REALTY

RG-MH-25941 · RERA P51800007477 · Last updated on MahaRERA portal: 26 Jun 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

111 HYDE PARK is a Residential / Group Housing project by MDM REALTY in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007477 on 17 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2022. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • Name111 HYDE PARK
  • TypeResidential / Group Housing
  • Location
    • 96/C/1 UPPER GOVIND NAGAR
    • MALAD EAST
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800007477
  • ReraGenie IDRG-MH-25941

Builder

  • NameMDM REALTY
  • Entity typeOthers
  • Named personsMEHUL MEHTA, PUSHPOM BUILDTECH ASSOCIATES PVT LTD

Key dates

this monthRegisteredAug 2017First promiseJun 2022Revised toDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion31 Dec 2022
  • Revised completionRevised to 31 Dec 2022 (originally 30 Jun 2022)
  • Buildings1 building record
  • Documents filed65 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
111 HYDE PARKNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

111 HYDE PARK: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 26 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area866 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2804.0
Proposed, not sanctioned2,804 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMEGHDOOT BUILDING FIRST FLOOR JUNCTION AND TURNER ROAD BANDRA WEST MUMBAI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJAY B SHAH
ArchitectHIRAL SOMAIYA
EngineerNIKHIL SHANGHVI
PartnerRole in project
MDM REALTY-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800012008Jun 2022 → Dec 2022

Reason as filed by the promoterDUE TO COVID 19 PROJECT HAS BEEN AFFECTED DUE TO SHORTAGE OF MATERIAL & LABOURS & HENCE THE PROJECT IS GETTING DELAYED. SUPER STRUCTURE IS READY WITH EXTERIOR PAINT, FINISHING IS GOING ON HENCE REQUESTING FOR 6 MONTHS EXTENSION.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Jun 2023

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for26 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: 1 Architect’s Certificate on Completion of Project (Form 4).pdf26 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Certificate of Engineer (Form 2).pdf22 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Certificate of Engineer (Form 2).pdf22 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Certificate of Engineer (Form 2).pdf22 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Certificate of Engineer (Form 2).pdf22 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Certificate of Engineer (Form 2).pdf22 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 Certificate of Engineer (Form 2).pdf22 Jun 2023
Disclosure of sold/ booked inventoryFile: 1 Disclosure of sold inventory.pdf22 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A-3.pdf21 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A-4.pdf21 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A-5.pdf21 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-6.pdf21 Jun 2023
CERSAI detailsFile: CERSAI.pdf21 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf10 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf10 Jun 2023
Certificates of CA (Form 3)File: JUNE 2022_compressed.pdf15 May 2023
Certificates of CA (Form 3)File: SEPT 2022_compressed.pdf15 May 2023
Certificates of CA (Form 3)File: DEC 2022_compressed.pdf15 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 -- F Y 2018-19.pdf10 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 -- F Y 2019-20.pdf10 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 -- F Y 2020-21.pdf10 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 -- F Y 2021-22.pdf10 Apr 2023
Certificates of CA (Form 3)File: Certificates of CA (Form 3) Jun 21.pdf11 Jan 2023
Certificates of CA (Form 3)File: Certificates of CA (Form 3) Sep 21.pdf11 Jan 2023
Certificates of CA (Form 3)File: Certificates of CA (Form 3) Dec 21.pdf11 Jan 2023
Certificates of CA (Form 3)File: Certificates of CA (Form 3) Mar 22.pdf11 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate or OC -- 111 Hyde Park.pdf10 Jan 2023
Certificates of CA (Form 3)File: Certificate of CA Form 3 sept 17.pdf18 Jul 2022
Certificates of CA (Form 3)File: Certificate of CA Form 3 as on Dec 17.pdf18 Jul 2022
Certificates of CA (Form 3)File: Certificate of CA Form 3 as on Mar 18.pdf18 Jul 2022
Certificates of CA (Form 3)File: Certificate of CA Form 3 as on Jun 18.pdf18 Jul 2022
Certificates of CA (Form 3)File: Certificate of CA Form 3 as on Sept 18.pdf18 Jul 2022
Certificates of CA (Form 3)File: Certificate of CA Form 3 as on Dec 18.pdf18 Jul 2022
Certificates of CA (Form 3)File: Certificate of CA Form 3 as on Mar 19.pdf18 Jul 2022
Certificates of CA (Form 3)File: Certificate of CA Form 3 as on Jun 19.pdf18 Jul 2022
Certificates of CA (Form 3)File: Certificate of CA Form 3 as on Sept 19.pdf18 Jul 2022
Certificates of CA (Form 3)File: Certificate of CA Form 3 as on Dec 19.pdf18 Jul 2022
Certificates of CA (Form 3)File: Certificate of CA Form 3 as on Mar 20.pdf18 Jul 2022
Certificates of CA (Form 3)File: Certificate of CA Form 3 as on Jun 20.pdf18 Jul 2022
Certificates of CA (Form 3)File: Certificate of CA Form 3 as on Sept 20.pdf18 Jul 2022
Certificates of CA (Form 3)File: Certificate of CA Form 3 as on Dec 20.pdf18 Jul 2022
Certificates of CA (Form 3)File: Certificate of CA Form 3 as on Mar 21.pdf18 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Further CC 24122020.pdf16 Aug 2021
Building plan approvalFile: IOD 17 FLOOR.pdf20 Nov 2020
Building Plan Approval (IOD)File: IOD 17 FLOOR.pdf20 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: Full cc 2258759_FurtherCC_signed.pdf20 Nov 2020
Building plan approvalFile: Amended plan letter-27-11-2019.pdf6 Jan 2020
Building Plan Approval (IOD)File: Amended plan letter-27-11-2019.pdf6 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: CC new.pdf6 Jan 2020
Certificates of CA (Form 5)File: FORM 5.pdf31 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: 2186770_furthercc_signed.pdf8 Aug 2018
Layout approvalFile: iod plan.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: iod plan.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -- Engineers Certificate.pdf29 Jul 2017
Certificates of CA (Form 3)File: CA_CERTIFICATE compressed.pdf29 Jul 2017
Building plan approvalFile: IOD Malad.pdf28 Jul 2017
PAN CardFile: pan card mdm.pdf28 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf28 Jul 2017
Details of encumbrancesFile: No Encumbrances.pdf28 Jul 2017
Building Plan Approval (IOD)File: IOD Malad.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC for Malad Project.pdf28 Jul 2017
Declaration in FORM BFile: Form B.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf28 Jul 2017
Proforma of Allotment letterFile: Declaration.pdf28 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 6 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 111 HYDE PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD EAST6,700+ in Mumbai Suburban

2 km111 HYDE PARKCompleted 160Lapsed / revoked 103Other 171Dot size: filed unitsN

Filed coordinates, straight-line distance. 434 registered projects within 2 km.

Builder: MDM REALTY

MDM REALTY has 1 registration on MahaRERA, including 111 HYDE PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if 111 HYDE PARK is delayed beyond 31 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 111 HYDE PARK?

The registered promoter entity is MDM REALTY, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 111 HYDE PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 111 HYDE PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 111 HYDE PARK?

The professionals named in the filing: Architect: SANJAY B SHAH; Architect: HIRAL SOMAIYA; Engineer: NIKHIL SHANGHVI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 111 HYDE PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 111 HYDE PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 111 HYDE PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.